In 2017 the Algerian-Spanish joint venture MOBEAL was contracted to fit 500 Algiers intersections with adaptive, camera-linked traffic lights feeding a control centre at Kouba, on a 15 billion dinar envelope spread over three phases and 55 months. Only 22 junctions were ever wired, on a 7 km stretch between Belouizdad and Ruisseau, and no source names a date on which any of them began operating: the authorities refused to authorise the surveillance cameras and the fibre-optic links, and the Spanish partner left during the Covid-19 pandemic. By November 2024 the wilaya was describing a different, smaller scheme of 260 junctions.
what does this mean?
The strongest source is press reporting; no primary evaluation was located. It grades who did the looking — not how well the project went. All four grades →📊 Impact
No source reports a measured effect on traffic. By January 2020 everything built had consumed only about 10 per cent of the 6.9 billion dinar first phase: 22 junctions installed in the pilot zone, and of the 200 first-phase junctions 53 surveyed and fitted without ever being commissioned. A year later the acting transport minister told parliament the count was still 22 and the project had run into an unplanned delay.
🎓 Lesson
A pilot zone can stay a pilot zone, and the obstacle can be a permission rather than a machine: the authorities would not authorise the surveillance cameras or the fibre-optic links the system needed, and the Spanish partner left during the pandemic. The minister called the project a failure in January 2021, and when the wilaya returned to traffic signals in November 2024 it did so with a different, smaller plan.
Sources
📅 How old is the evidence?
Two clocks, kept apart: when this entry’s sources were published, and what has happened to its record in the atlas. Documented span: 2017–2021. 4 of 4 sources carry a publication date, from 20 March 2018 to 2 November 2024.
When the sources were published
- Algérie 360 · pressAlgerie360 — launch of the Algiers traffic-regulation and smart-signal project (20 Mar 2018)
- Algérie Eco · pressAlgérie Eco — Algiers traffic-regulation system: the project is at a standstill (30 Jan 2020)
- TSA — Tout Sur l'Algérie · pressTSA – Tout Sur l'Algérie — Chiali explains the failure of the 500-signal project (25 Jan 2021)
- Horizons · pressHorizons — a special plan to regulate traffic in the capital (2 Nov 2024)
Show your work What this page rests on and what it can’t tell you · all 12 claims with their sources · the forensic record
Evidence Passport · public beta 12 addressable claims, 4 source dossiers, one permanent baseline. The passport is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.
Inspect the claims, one by one — verbatim text, sources and caveats for all 12
The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-941aac11ce06a3b5
quantitative
In 2017 the Algerian-Spanish joint venture MOBEAL was contracted to fit 500 Algiers intersections with adaptive, camera-linked traffic lights
Sources carrying this claim
clm-95c44b5ce9abb393
descriptive
feeding a control centre at Kouba
Sources carrying this claim
clm-170976cb5fedc41a
quantitative
on a 15 billion dinar envelope spread over three phases and 55 months
Sources carrying this claim
clm-44444c3f83161da2
quantitative
Only 22 junctions were ever wired, on a 7 km stretch between Belouizdad and Ruisseau
Sources carrying this claim
clm-ef3e17741f8a4ceb
quantitative
the authorities refused to authorise the surveillance cameras and the fibre-optic links, and the Spanish partner left during the Covid-19 pandemic
Sources carrying this claim
clm-0ab8f7ede87bba27
quantitative
By November 2024 the wilaya was describing a different, smaller scheme of 260 junctions
Sources carrying this claim
clm-516fd25fdef8f737
quantitative
By January 2020 everything built had consumed only about 10 per cent of the 6.9 billion dinar first phase
Sources carrying this claim
clm-ac6f82b5cc836f6b
quantitative
of the 200 first-phase junctions 53 surveyed and fitted without ever being commissioned
Sources carrying this claim
clm-4e71d8bcbb3ff4ea
quantitative
A year later the acting transport minister told parliament the count was still 22 and the project had run into an unplanned delay
Sources carrying this claim
clm-efea277a28142939
descriptive
the authorities would not authorise the surveillance cameras or the fibre-optic links the system needed, and the Spanish partner left during the pandemic
Sources carrying this claim
clm-a74922008b78a080
quantitative
The minister called the project a failure in January 2021
Sources carrying this claim
clm-51eab8564e3b7045
quantitative
when the wilaya returned to traffic signals in November 2024 it did so with a different, smaller plan
Sources carrying this claim
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
Erratum on this revision's envelope. The snapshot, its hash and its permanent link are untouched.
- createdAt previously read 2026-08-26T22:00:00Z. The batching script that produced this revision advanced createdAt into the future to satisfy the strictly-increasing order the validator requires per entity. The value never recorded a real event; the corrected value is the moment the revision provably existed in the repository. Corrected to 2026-08-26T14:41:50Z on 2026-08-27; evidence: first appears in commit 9d65ace88e, committed 2026-08-26T14:41:50Z.
sha256:52a68641baa4dd9c384d66cb73013351e319b4027f27bb979e7d37110eeb5688
- 12
- of 12 claims mapped
- 4
- source dossiers
- 4
- publication dates recorded
- 0
- archives linked
- 0
- exact locators
- 0
- content captures hashed
Governance facts carried by the record
- Operator
- MOBEAL (EGCTU/ERMA + Indra + SICE joint venture)
- Actor types
- city-government, private
- Funding model
- public
- Funding description
- Not recorded
- Cost
- Not recorded
- Ownership
- Not recorded
- Decision rights
- Not recorded
- Exit conditions
- Not recorded
4 source dossiers
Algerie360 — launch of the Algiers traffic-regulation and smart-signal project (20 Mar 2018)
- Stable source ID
src-ed7a07e2a3069d7a- Publisher
- Name not classified · algerie360.com
- Type / language
- web-page · language not classified
- Published
- 2018-03-20
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-26
- Dossier created
- 2026-08-26
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Report on the launch of works: the wali describes 200 of 500 junctions in the first phase, data from surveillance cameras and magnetic loops feeding a dedicated centre at Kouba.
- Claims linked
TSA – Tout Sur l'Algérie — Chiali explains the failure of the 500-signal project (25 Jan 2021)
- Stable source ID
src-b3d86f72a4d97dfd- Publisher
- Name not classified · tsa-algerie.com
- Type / language
- web-page · language not classified
- Published
- 2021-01-25
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-26
- Dossier created
- 2026-08-26
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Acting transport minister Farouk Chiali tells parliament that only 22 junctions were equipped, blames the refusal to authorise the surveillance cameras and the fibre optics plus the Spanish partner's departure during the Covid-19 pandemic, and dates the 15 billion dinar envelope to the 2017 launch.
Algérie Eco — Algiers traffic-regulation system: the project is at a standstill (30 Jan 2020)
- Stable source ID
src-59d3a64c2ff51482- Publisher
- Name not classified · algerie-eco.com
- Type / language
- web-page · language not classified
- Published
- 2020-01-30
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-26
- Dossier created
- 2026-08-26
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Interview with Salhi Ayach of the Algiers wilaya transport directorate: 22 junctions installed on a 7 km stretch between Belouizdad and Ruisseau, work halted by fibre-optic problems and by the undefined rules for operating the signal cameras, 53 of the 200 first-phase junctions surveyed and fitted without being commissioned, and only about 10 per cent of the 6.9 billion dinar first-phase budget consumed. Replaces the APS report of the same facts, whose URL now returns 404.
Horizons — a special plan to regulate traffic in the capital (2 Nov 2024)
- Stable source ID
src-470be1b231576d41- Publisher
- Name not classified · horizons.dz
- Type / language
- web-page · language not classified
- Published
- 2024-11-02
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-26
- Dossier created
- 2026-08-26
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Later, smaller scheme: 260 junctions in the wilaya of Algiers to receive signals, with two pilot zones (Place du 1er Mai and Grande Poste) finished and Square Port Saïd about 90 per cent complete. Does not mention MOBEAL or a resumption of the 2017 contract.
- Claims linked
Known limits of this passport
- Publisher names and source languages have not yet been classified; domains are recorded without guessing.
- Existing source notes are descriptive locators, not page- or paragraph-exact citations.
- A missing archive, publication date or content hash is shown as null rather than inferred.
- The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Algiers Intelligent Traffic Management” — Algiers, Algeria. The Smart City Atlas. https://1001smartcities.org/projects/algiers-smart-traffic/ (last verified 2026-08-26). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.