lost around 40 percent of its drinking water
Permanent project revision
Revision 2026-08-20-source-dates-r2 · effective 2026-08-15
Current revision. This is the snapshot used by the live entity page.
Record the publication date of each source that states one; sources that publish no date are marked null.
sha256:5ade26e8d17a3f67d5253f43c556ced9b64479c8516a5545085e78cf44520e5b
replace /snapshot/projectFingerprint — Updated projectFingerprint to the current sourced project record.replace /snapshot/sources — Updated sources to the current sourced project record.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-d46d0390e8c0e788
quantitative
lost around 40 percent of its drinking water
clm-c964fa381591175d
quantitative
In 2008 the utility SAWACO signed a World Bank-financed performance-based contract with Manila Water
clm-556affdf426ffab2
quantitative
a 23-square-kilometre area with about 140,000 connections
clm-88344cef7f9006af
quantitative
more than 100 continuously metered district areas
clm-e0bdb64fb145da3e
quantitative
targeted 37,500 cubic metres a day; about 92,000 were achieved
clm-c44bfd4ba6f6b303
quantitative
roughly 12,000 leaks repaired
clm-19422fdd579996d9
quantitative
non-revenue water of 11.97 percent by mid-2026
clm-d1009a8f3ab3f0a6
quantitative
92,000 cubic metres a day of leakage reduction against a contracted 37,500
clm-f30568022a7a3368
quantitative
12.08 percent for the first half of 2025 and 11.97 percent by mid-2026
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:5ade26e8d17a3f67d5253f43c556ced9b64479c8516a5545085e78cf44520e5b
src-67f2071538a80b3aCase study of the 2008 contract with Manila Water: 119 DMAs planned and a leakage-reduction target of at least 38 MLD. The PDF answers automated fetches with HTTP 403; content verified via the search index and secondary reviews.
src-4bdf3d2390cf852eCarries the Zone 1 detail: 23 km², ~140,000 connections, 114 DMAs built, target of 26% / 37,500 m³ a day, ~92,000 m³ a day achieved, ~12,000 leaks repaired.
src-d2f642eda090a718Professional-association account: the first PBC started 2008 as a World Bank initiative and saved 122 MLD over its six-year span (a cumulative-period figure that differs from White & Case's snapshot).
src-b70e528bff9f86e4July 2026 report of the utility's current non-revenue-water figure (11.97% cumulative basis, 12.31% daily-average basis).
src-c2e78eeb1820f359The operator's own reporting of the first-half-2025 rate.
src-5f876890c7cb66d7Research-institute chapter putting non-revenue water at about 40% of production (2011 data) — the baseline the reductions are measured against.