{
 "schemaVersion": "1.0.0",
 "constitutionVersion": "1.0.0",
 "createdAt": "2026-08-12T00:00:00Z",
 "description": "Append-only Evidence Passport records. Old revisions are immutable; corrections create a new revision and preserve the previous permalink.",
 "entity": {
  "type": "project",
  "id": "hochiminh-sawaco-water-loss",
  "title": "SAWACO Water-Loss Reduction & District Metering",
  "canonicalUrl": "https://1001smartcities.org/projects/hochiminh-sawaco-water-loss/"
 },
 "currentRevisionId": "2026-08-20-source-dates-r2",
 "revisions": [
  {
   "id": "2026-08-15-baseline",
   "createdAt": "2026-08-15T18:12:00Z",
   "effectiveAt": "2026-08-15",
   "changeType": "baseline",
   "summary": "Created the first structured Evidence Passport with 9 claims and 6 source dossiers.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "add",
     "path": "/evidencePassport",
     "summary": "Added claim-level evidence mapping and source dossiers."
    },
    {
     "operation": "add",
     "path": "/revisionHistory",
     "summary": "Established a permanent, hash-addressed baseline revision."
    }
   ],
   "snapshotHash": "sha256:0fbd59ff8795f7640112a00891c0a54c09f84f7a55bfa72960c643e8bf17ec32",
   "snapshot": {
    "asOf": "2026-08-15",
    "projectFingerprint": "sha256:1ab094f196abb1230f2bc1fb4bbe7b56e04e445c787067af1ce8b30aa68b637c",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "live",
     "outcome": "ongoing",
     "evidenceGrade": "official",
     "timeline": {
      "started": 2008,
      "ended": null
     }
    },
    "governance": {
     "operator": "SAWACO (Saigon Water Corporation)",
     "actorTypes": [
      "utility"
     ],
     "fundingModel": "mixed",
     "fundingDescription": "World Bank-financed performance-based contract (Zone 1); SAWACO investment",
     "cost": null,
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-d46d0390e8c0e788",
      "field": "snippet",
      "text": "lost around 40 percent of its drinking water",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-5f876890c7cb66d7"
      ],
      "supportNote": "The IGES chapter estimates non-revenue water at about 40% of total production as of 2011.",
      "caveat": "Baseline estimates vary by year and method; other reviews put the mid-2000s figure above 40%.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-c964fa381591175d",
      "field": "snippet",
      "text": "In 2008 the utility SAWACO signed a World Bank-financed performance-based contract with Manila Water",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-67f2071538a80b3a",
       "src-d2f642eda090a718"
      ],
      "supportNote": "The World Bank case study documents the 2008 signing with Manila Water; the IWA account confirms the 2008 start as a World Bank initiative.",
      "caveat": "One legal review dates the contract's effective start to 2010; sources differ on signing versus mobilization.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-556affdf426ffab2",
      "field": "snippet",
      "text": "a 23-square-kilometre area with about 140,000 connections",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-4bdf3d2390cf852e"
      ],
      "supportNote": "Describes Zone 1 as a 23 km² area comprising approximately 140,000 connections across four districts.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-88344cef7f9006af",
      "field": "snippet",
      "text": "more than 100 continuously metered district areas",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-4bdf3d2390cf852e",
       "src-67f2071538a80b3a"
      ],
      "supportNote": "Both accounts describe the DMA build-out; White & Case counts 114 DMAs built, the World Bank case study 119 planned.",
      "caveat": "The two sources give different DMA counts (114 built vs 119 planned), which is why only 'more than 100' is asserted.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-e0bdb64fb145da3e",
      "field": "snippet",
      "text": "targeted 37,500 cubic metres a day; about 92,000 were achieved",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-4bdf3d2390cf852e"
      ],
      "supportNote": "States the contracted target of 37,500 m³/day and the achieved reduction of approximately 92,000 m³/day — almost double the contracted volume.",
      "caveat": "The IWA account gives 122 MLD saved over the six-year span — a cumulative-period figure measured differently.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-c44bfd4ba6f6b303",
      "field": "snippet",
      "text": "roughly 12,000 leaks repaired",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-4bdf3d2390cf852e"
      ],
      "supportNote": "Reports approximately 12,000 leaks repaired across 662 km of distribution network, with under 1% of pipes needing replacement.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-19422fdd579996d9",
      "field": "snippet",
      "text": "non-revenue water of 11.97 percent by mid-2026",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-b70e528bff9f86e4"
      ],
      "supportNote": "The July 2026 report relays SAWACO's figure of 11.97% on a cumulative-volume basis.",
      "caveat": "The utility's own figure; on a daily-average basis the same report gives 12.31%.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-d1009a8f3ab3f0a6",
      "field": "impact",
      "text": "92,000 cubic metres a day of leakage reduction against a contracted 37,500",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-4bdf3d2390cf852e"
      ],
      "supportNote": "The case review states the achieved reduction of about 92,000 m³/day against the contracted 37,500 m³/day target.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-f30568022a7a3368",
      "field": "impact",
      "text": "12.08 percent for the first half of 2025 and 11.97 percent by mid-2026",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-c2e78eeb1820f359",
       "src-b70e528bff9f86e4"
      ],
      "supportNote": "SAWACO's own post gives 12.08% for H1 2025; the July 2026 press report gives 11.97%.",
      "caveat": "Both are operator-reported; no independent audit of the loss accounting was found.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-67f2071538a80b3a",
      "title": "World Bank PPP — HCMC NRW performance-based contract case study",
      "url": "https://ppp.worldbank.org/sites/default/files/2022-04/Ho_Chi_Minh_City_NRW-PBC_Case_Study_Summary_Overview.pdf",
      "publisher": {
       "name": null,
       "domain": "ppp.worldbank.org",
       "classification": "not-classified"
      },
      "sourceType": "pdf",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-c964fa381591175d",
       "clm-88344cef7f9006af"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-15",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Case study of the 2008 contract with Manila Water: 119 DMAs planned and a leakage-reduction target of at least 38 MLD. The PDF answers automated fetches with HTTP 403; content verified via the search index and secondary reviews.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-4bdf3d2390cf852e",
      "title": "White & Case — Plugging the gap (global water-loss review)",
      "url": "https://www.whitecase.com/insight-our-thinking/plugging-gap-aligning-public-policy-and-private-capital-tackle-global-water",
      "publisher": {
       "name": null,
       "domain": "whitecase.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-556affdf426ffab2",
       "clm-88344cef7f9006af",
       "clm-e0bdb64fb145da3e",
       "clm-c44bfd4ba6f6b303",
       "clm-d1009a8f3ab3f0a6"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-15",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Carries the Zone 1 detail: 23 km², ~140,000 connections, 114 DMAs built, target of 26% / 37,500 m³ a day, ~92,000 m³ a day achieved, ~12,000 leaks repaired.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-d2f642eda090a718",
      "title": "IWA — Performance-based contracts for NRW reduction in Vietnam",
      "url": "https://iwa-network.org/performance-based-contracts-for-non-revenue-water-in-vietnam/",
      "publisher": {
       "name": null,
       "domain": "iwa-network.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-c964fa381591175d"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-15",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Professional-association account: the first PBC started 2008 as a World Bank initiative and saved 122 MLD over its six-year span (a cumulative-period figure that differs from White & Case's snapshot).",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-b70e528bff9f86e4",
      "title": "Thanh Niên — SAWACO pulls water losses down to 11.97%",
      "url": "https://thanhnien.vn/sawaco-keo-ty-le-that-thoat-nuoc-xuong-1197-185260716162001197.htm",
      "publisher": {
       "name": null,
       "domain": "thanhnien.vn",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-19422fdd579996d9",
       "clm-f30568022a7a3368"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-15",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "July 2026 report of the utility's current non-revenue-water figure (11.97% cumulative basis, 12.31% daily-average basis).",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-c2e78eeb1820f359",
      "title": "SAWACO — losses down to 12.08% in H1 2025",
      "url": "https://sawaco.com.vn/post-detail/sawaco-giam-that-thoat-nuoc-xuong-1208-trong-6-thang-dau-nam-2025-250806150718",
      "publisher": {
       "name": null,
       "domain": "sawaco.com.vn",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-f30568022a7a3368"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-15",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The operator's own reporting of the first-half-2025 rate.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-5f876890c7cb66d7",
      "title": "IGES — Water resources management in Ho Chi Minh City (policy report chapter)",
      "url": "https://www.iges.or.jp/en/publication_documents/pub/policyreport/en/654/06_chapter3-3hochiminh.pdf",
      "publisher": {
       "name": null,
       "domain": "iges.or.jp",
       "classification": "not-classified"
      },
      "sourceType": "pdf",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-d46d0390e8c0e788"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-15",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Research-institute chapter putting non-revenue water at about 40% of production (2011 data) — the baseline the reductions are measured against.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 9,
     "claimsMapped": 9,
     "sourcesTotal": 6,
     "sourcesUsedByClaims": 6,
     "sourcesWithPublicationDate": 0,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  },
  {
   "id": "2026-08-20-source-dates-b2",
   "createdAt": "2026-08-20T17:00:00Z",
   "effectiveAt": "2026-08-15",
   "changeType": "update",
   "summary": "Record the publication date of each source that states one; sources that publish no date are marked null.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "replace",
     "path": "/snapshot/projectFingerprint",
     "summary": "Updated projectFingerprint to the current sourced project record."
    },
    {
     "operation": "replace",
     "path": "/snapshot/sources",
     "summary": "Updated sources to the current sourced project record."
    }
   ],
   "snapshotHash": "sha256:56b08c24024f4aa48076f29260393a7fd9b8e1f833f5370c57ed696015fc6f9d",
   "snapshot": {
    "asOf": "2026-08-15",
    "projectFingerprint": "sha256:87a63499c008af79df12afba9fd090b75182f211b070846f6f3d48c4debb0c9d",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "live",
     "outcome": "ongoing",
     "evidenceGrade": "official",
     "timeline": {
      "started": 2008,
      "ended": null
     }
    },
    "governance": {
     "operator": "SAWACO (Saigon Water Corporation)",
     "actorTypes": [
      "utility"
     ],
     "fundingModel": "mixed",
     "fundingDescription": "World Bank-financed performance-based contract (Zone 1); SAWACO investment",
     "cost": null,
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-d46d0390e8c0e788",
      "field": "snippet",
      "text": "lost around 40 percent of its drinking water",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-5f876890c7cb66d7"
      ],
      "supportNote": "The IGES chapter estimates non-revenue water at about 40% of total production as of 2011.",
      "caveat": "Baseline estimates vary by year and method; other reviews put the mid-2000s figure above 40%.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-c964fa381591175d",
      "field": "snippet",
      "text": "In 2008 the utility SAWACO signed a World Bank-financed performance-based contract with Manila Water",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-67f2071538a80b3a",
       "src-d2f642eda090a718"
      ],
      "supportNote": "The World Bank case study documents the 2008 signing with Manila Water; the IWA account confirms the 2008 start as a World Bank initiative.",
      "caveat": "One legal review dates the contract's effective start to 2010; sources differ on signing versus mobilization.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-556affdf426ffab2",
      "field": "snippet",
      "text": "a 23-square-kilometre area with about 140,000 connections",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-4bdf3d2390cf852e"
      ],
      "supportNote": "Describes Zone 1 as a 23 km² area comprising approximately 140,000 connections across four districts.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-88344cef7f9006af",
      "field": "snippet",
      "text": "more than 100 continuously metered district areas",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-4bdf3d2390cf852e",
       "src-67f2071538a80b3a"
      ],
      "supportNote": "Both accounts describe the DMA build-out; White & Case counts 114 DMAs built, the World Bank case study 119 planned.",
      "caveat": "The two sources give different DMA counts (114 built vs 119 planned), which is why only 'more than 100' is asserted.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-e0bdb64fb145da3e",
      "field": "snippet",
      "text": "targeted 37,500 cubic metres a day; about 92,000 were achieved",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-4bdf3d2390cf852e"
      ],
      "supportNote": "States the contracted target of 37,500 m³/day and the achieved reduction of approximately 92,000 m³/day — almost double the contracted volume.",
      "caveat": "The IWA account gives 122 MLD saved over the six-year span — a cumulative-period figure measured differently.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-c44bfd4ba6f6b303",
      "field": "snippet",
      "text": "roughly 12,000 leaks repaired",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-4bdf3d2390cf852e"
      ],
      "supportNote": "Reports approximately 12,000 leaks repaired across 662 km of distribution network, with under 1% of pipes needing replacement.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-19422fdd579996d9",
      "field": "snippet",
      "text": "non-revenue water of 11.97 percent by mid-2026",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-b70e528bff9f86e4"
      ],
      "supportNote": "The July 2026 report relays SAWACO's figure of 11.97% on a cumulative-volume basis.",
      "caveat": "The utility's own figure; on a daily-average basis the same report gives 12.31%.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-d1009a8f3ab3f0a6",
      "field": "impact",
      "text": "92,000 cubic metres a day of leakage reduction against a contracted 37,500",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-4bdf3d2390cf852e"
      ],
      "supportNote": "The case review states the achieved reduction of about 92,000 m³/day against the contracted 37,500 m³/day target.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-f30568022a7a3368",
      "field": "impact",
      "text": "12.08 percent for the first half of 2025 and 11.97 percent by mid-2026",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-c2e78eeb1820f359",
       "src-b70e528bff9f86e4"
      ],
      "supportNote": "SAWACO's own post gives 12.08% for H1 2025; the July 2026 press report gives 11.97%.",
      "caveat": "Both are operator-reported; no independent audit of the loss accounting was found.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-67f2071538a80b3a",
      "title": "World Bank PPP — HCMC NRW performance-based contract case study",
      "url": "https://ppp.worldbank.org/sites/default/files/2022-04/Ho_Chi_Minh_City_NRW-PBC_Case_Study_Summary_Overview.pdf",
      "publisher": {
       "name": null,
       "domain": "ppp.worldbank.org",
       "classification": "not-classified"
      },
      "sourceType": "pdf",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-c964fa381591175d",
       "clm-88344cef7f9006af"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Case study of the 2008 contract with Manila Water: 119 DMAs planned and a leakage-reduction target of at least 38 MLD. The PDF answers automated fetches with HTTP 403; content verified via the search index and secondary reviews.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-4bdf3d2390cf852e",
      "title": "White & Case — Plugging the gap (global water-loss review)",
      "url": "https://www.whitecase.com/insight-our-thinking/plugging-gap-aligning-public-policy-and-private-capital-tackle-global-water",
      "publisher": {
       "name": null,
       "domain": "whitecase.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-556affdf426ffab2",
       "clm-88344cef7f9006af",
       "clm-e0bdb64fb145da3e",
       "clm-c44bfd4ba6f6b303",
       "clm-d1009a8f3ab3f0a6"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Carries the Zone 1 detail: 23 km², ~140,000 connections, 114 DMAs built, target of 26% / 37,500 m³ a day, ~92,000 m³ a day achieved, ~12,000 leaks repaired.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-d2f642eda090a718",
      "title": "IWA — Performance-based contracts for NRW reduction in Vietnam",
      "url": "https://iwa-network.org/performance-based-contracts-for-non-revenue-water-in-vietnam/",
      "publisher": {
       "name": null,
       "domain": "iwa-network.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-c964fa381591175d"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Professional-association account: the first PBC started 2008 as a World Bank initiative and saved 122 MLD over its six-year span (a cumulative-period figure that differs from White & Case's snapshot).",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-b70e528bff9f86e4",
      "title": "Thanh Niên — SAWACO pulls water losses down to 11.97%",
      "url": "https://thanhnien.vn/sawaco-keo-ty-le-that-thoat-nuoc-xuong-1197-185260716162001197.htm",
      "publisher": {
       "name": null,
       "domain": "thanhnien.vn",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-19422fdd579996d9",
       "clm-f30568022a7a3368"
      ],
      "temporal": {
       "publishedAt": "2026-07-17",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "July 2026 report of the utility's current non-revenue-water figure (11.97% cumulative basis, 12.31% daily-average basis).",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-c2e78eeb1820f359",
      "title": "SAWACO — losses down to 12.08% in H1 2025",
      "url": "https://sawaco.com.vn/post-detail/sawaco-giam-that-thoat-nuoc-xuong-1208-trong-6-thang-dau-nam-2025-250806150718",
      "publisher": {
       "name": null,
       "domain": "sawaco.com.vn",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-f30568022a7a3368"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The operator's own reporting of the first-half-2025 rate.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-5f876890c7cb66d7",
      "title": "IGES — Water resources management in Ho Chi Minh City (policy report chapter)",
      "url": "https://www.iges.or.jp/en/publication_documents/pub/policyreport/en/654/06_chapter3-3hochiminh.pdf",
      "publisher": {
       "name": null,
       "domain": "iges.or.jp",
       "classification": "not-classified"
      },
      "sourceType": "pdf",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-d46d0390e8c0e788"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Research-institute chapter putting non-revenue water at about 40% of production (2011 data) — the baseline the reductions are measured against.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 9,
     "claimsMapped": 9,
     "sourcesTotal": 6,
     "sourcesUsedByClaims": 6,
     "sourcesWithPublicationDate": 1,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  },
  {
   "id": "2026-08-20-source-dates-r2",
   "createdAt": "2026-08-21T09:00:00Z",
   "effectiveAt": "2026-08-15",
   "changeType": "update",
   "summary": "Record the publication date of each source that states one; sources that publish no date are marked null.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "replace",
     "path": "/snapshot/projectFingerprint",
     "summary": "Updated projectFingerprint to the current sourced project record."
    },
    {
     "operation": "replace",
     "path": "/snapshot/sources",
     "summary": "Updated sources to the current sourced project record."
    }
   ],
   "snapshotHash": "sha256:5ade26e8d17a3f67d5253f43c556ced9b64479c8516a5545085e78cf44520e5b",
   "snapshot": {
    "asOf": "2026-08-15",
    "projectFingerprint": "sha256:9f7c9bb2c1efd48727286b08e85b68993536183b6a8ec795c03428cceb738d0b",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "live",
     "outcome": "ongoing",
     "evidenceGrade": "official",
     "timeline": {
      "started": 2008,
      "ended": null
     }
    },
    "governance": {
     "operator": "SAWACO (Saigon Water Corporation)",
     "actorTypes": [
      "utility"
     ],
     "fundingModel": "mixed",
     "fundingDescription": "World Bank-financed performance-based contract (Zone 1); SAWACO investment",
     "cost": null,
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-d46d0390e8c0e788",
      "field": "snippet",
      "text": "lost around 40 percent of its drinking water",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-5f876890c7cb66d7"
      ],
      "supportNote": "The IGES chapter estimates non-revenue water at about 40% of total production as of 2011.",
      "caveat": "Baseline estimates vary by year and method; other reviews put the mid-2000s figure above 40%.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-c964fa381591175d",
      "field": "snippet",
      "text": "In 2008 the utility SAWACO signed a World Bank-financed performance-based contract with Manila Water",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-67f2071538a80b3a",
       "src-d2f642eda090a718"
      ],
      "supportNote": "The World Bank case study documents the 2008 signing with Manila Water; the IWA account confirms the 2008 start as a World Bank initiative.",
      "caveat": "One legal review dates the contract's effective start to 2010; sources differ on signing versus mobilization.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-556affdf426ffab2",
      "field": "snippet",
      "text": "a 23-square-kilometre area with about 140,000 connections",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-4bdf3d2390cf852e"
      ],
      "supportNote": "Describes Zone 1 as a 23 km² area comprising approximately 140,000 connections across four districts.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-88344cef7f9006af",
      "field": "snippet",
      "text": "more than 100 continuously metered district areas",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-4bdf3d2390cf852e",
       "src-67f2071538a80b3a"
      ],
      "supportNote": "Both accounts describe the DMA build-out; White & Case counts 114 DMAs built, the World Bank case study 119 planned.",
      "caveat": "The two sources give different DMA counts (114 built vs 119 planned), which is why only 'more than 100' is asserted.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-e0bdb64fb145da3e",
      "field": "snippet",
      "text": "targeted 37,500 cubic metres a day; about 92,000 were achieved",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-4bdf3d2390cf852e"
      ],
      "supportNote": "States the contracted target of 37,500 m³/day and the achieved reduction of approximately 92,000 m³/day — almost double the contracted volume.",
      "caveat": "The IWA account gives 122 MLD saved over the six-year span — a cumulative-period figure measured differently.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-c44bfd4ba6f6b303",
      "field": "snippet",
      "text": "roughly 12,000 leaks repaired",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-4bdf3d2390cf852e"
      ],
      "supportNote": "Reports approximately 12,000 leaks repaired across 662 km of distribution network, with under 1% of pipes needing replacement.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-19422fdd579996d9",
      "field": "snippet",
      "text": "non-revenue water of 11.97 percent by mid-2026",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-b70e528bff9f86e4"
      ],
      "supportNote": "The July 2026 report relays SAWACO's figure of 11.97% on a cumulative-volume basis.",
      "caveat": "The utility's own figure; on a daily-average basis the same report gives 12.31%.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-d1009a8f3ab3f0a6",
      "field": "impact",
      "text": "92,000 cubic metres a day of leakage reduction against a contracted 37,500",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-4bdf3d2390cf852e"
      ],
      "supportNote": "The case review states the achieved reduction of about 92,000 m³/day against the contracted 37,500 m³/day target.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-f30568022a7a3368",
      "field": "impact",
      "text": "12.08 percent for the first half of 2025 and 11.97 percent by mid-2026",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-c2e78eeb1820f359",
       "src-b70e528bff9f86e4"
      ],
      "supportNote": "SAWACO's own post gives 12.08% for H1 2025; the July 2026 press report gives 11.97%.",
      "caveat": "Both are operator-reported; no independent audit of the loss accounting was found.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-67f2071538a80b3a",
      "title": "World Bank PPP — HCMC NRW performance-based contract case study",
      "url": "https://ppp.worldbank.org/sites/default/files/2022-04/Ho_Chi_Minh_City_NRW-PBC_Case_Study_Summary_Overview.pdf",
      "publisher": {
       "name": null,
       "domain": "ppp.worldbank.org",
       "classification": "not-classified"
      },
      "sourceType": "pdf",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-c964fa381591175d",
       "clm-88344cef7f9006af"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Case study of the 2008 contract with Manila Water: 119 DMAs planned and a leakage-reduction target of at least 38 MLD. The PDF answers automated fetches with HTTP 403; content verified via the search index and secondary reviews.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-4bdf3d2390cf852e",
      "title": "White & Case — Plugging the gap (global water-loss review)",
      "url": "https://www.whitecase.com/insight-our-thinking/plugging-gap-aligning-public-policy-and-private-capital-tackle-global-water",
      "publisher": {
       "name": null,
       "domain": "whitecase.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-556affdf426ffab2",
       "clm-88344cef7f9006af",
       "clm-e0bdb64fb145da3e",
       "clm-c44bfd4ba6f6b303",
       "clm-d1009a8f3ab3f0a6"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Carries the Zone 1 detail: 23 km², ~140,000 connections, 114 DMAs built, target of 26% / 37,500 m³ a day, ~92,000 m³ a day achieved, ~12,000 leaks repaired.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-d2f642eda090a718",
      "title": "IWA — Performance-based contracts for NRW reduction in Vietnam",
      "url": "https://iwa-network.org/performance-based-contracts-for-non-revenue-water-in-vietnam/",
      "publisher": {
       "name": null,
       "domain": "iwa-network.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-c964fa381591175d"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Professional-association account: the first PBC started 2008 as a World Bank initiative and saved 122 MLD over its six-year span (a cumulative-period figure that differs from White & Case's snapshot).",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-b70e528bff9f86e4",
      "title": "Thanh Niên — SAWACO pulls water losses down to 11.97%",
      "url": "https://thanhnien.vn/sawaco-keo-ty-le-that-thoat-nuoc-xuong-1197-185260716162001197.htm",
      "publisher": {
       "name": null,
       "domain": "thanhnien.vn",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-19422fdd579996d9",
       "clm-f30568022a7a3368"
      ],
      "temporal": {
       "publishedAt": "2026-07-17",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "July 2026 report of the utility's current non-revenue-water figure (11.97% cumulative basis, 12.31% daily-average basis).",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-c2e78eeb1820f359",
      "title": "SAWACO — losses down to 12.08% in H1 2025",
      "url": "https://sawaco.com.vn/post-detail/sawaco-giam-that-thoat-nuoc-xuong-1208-trong-6-thang-dau-nam-2025-250806150718",
      "publisher": {
       "name": null,
       "domain": "sawaco.com.vn",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-f30568022a7a3368"
      ],
      "temporal": {
       "publishedAt": "2025-08-06",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The operator's own reporting of the first-half-2025 rate.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-5f876890c7cb66d7",
      "title": "IGES — Water resources management in Ho Chi Minh City (policy report chapter)",
      "url": "https://www.iges.or.jp/en/publication_documents/pub/policyreport/en/654/06_chapter3-3hochiminh.pdf",
      "publisher": {
       "name": null,
       "domain": "iges.or.jp",
       "classification": "not-classified"
      },
      "sourceType": "pdf",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-d46d0390e8c0e788"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Research-institute chapter putting non-revenue water at about 40% of production (2011 data) — the baseline the reductions are measured against.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 9,
     "claimsMapped": 9,
     "sourcesTotal": 6,
     "sourcesUsedByClaims": 6,
     "sourcesWithPublicationDate": 2,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  }
 ]
}
