This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
unreviewed
Revision 2026-08-27-claims-and-sources
effective 2026-08-27 · created 2026-08-27
Awaiting operator and domain-expert review; publication of this revision implies neither.
Erratum on this revision's envelope. The snapshot, its hash and its permanent link are untouched.
- createdAt previously read 2026-09-05T14:00:00Z. The batching script that produced this revision advanced createdAt into the future to satisfy the strictly-increasing order the validator requires per entity. The value never recorded a real event; the corrected value is the moment the revision provably existed in the repository. Corrected to 2026-08-27T05:20:26Z on 2026-08-27; evidence: first appears in commit 51da3fbce7, committed 2026-08-27T05:20:26Z.
sha256:06a7156e6f5a5db2ada9806857f3f0db2b211af00e9dcf5d6b4c9fdd6caf5ac7
- 8
- of 8 claims mapped
- 2
- source dossiers
- 1
- publication dates recorded
- 0
- archives linked
- 0
- exact locators
- 0
- content captures hashed
Governance facts carried by the record
- Operator
- A2A (A2A Illuminazione Pubblica)
- Actor types
- utility
- Funding model
- utility
- Funding description
- Not recorded
- Cost
- Not recorded
- Ownership
- Not recorded
- Decision rights
- Not recorded
- Exit conditions
- Not recorded
2 source dossiers
ANSA — Milan to become first large Italian city with LED lighting (29 September 2014)
ansa.it · 4 linked claims
Open original source ↗
- Stable source ID
src-8f0164d26d1bb741
- Publisher
- Name not classified · ansa.it
- Type / language
- web-page · language not classified
- Published
- 2014-09-29
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-27
- Dossier created
- 2026-09-05
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
Open the recorded source note
Press: 141,000 lights, A2A €38M over two years, 80% done by Expo May 2015 / full completion Aug 2015, 'first large Italian city', per-capita 87→42 kWh, ~€10M/yr saved.
Descriptive only — not page/paragraph exact
A2A Illuminazione Pubblica — LED efficiency retrofit of Milan public lighting (operator)
a2ailluminazionepubblica.eu · 5 linked claims
Open original source ↗
- Stable source ID
src-23856d8f0340e08a
- Publisher
- Name not classified · a2ailluminazionepubblica.eu
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-27
- Dossier created
- 2026-09-05
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
Open the recorded source note
Operator/official: >140,000 points to LED with remote control, ~500 control boards, ~52% consumption reduction, ~23,000 t CO2/yr avoided. (Returned 503 at fetch time; verified via cached search snippet — editor should re-open before publish.)
Descriptive only — not page/paragraph exact
Known limits of this passport
- Publisher names and source languages have not yet been classified; domains are recorded without guessing.
- Existing source notes are descriptive locators, not page- or paragraph-exact citations.
- A missing archive, publication date or content hash is shown as null rather than inferred.
- The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.