Since November 2021 Bucharest's municipal heating company Termoenergetica has run Termoalert, a public app and web map showing the live state of the city's district-heating network
Permanent project revision
Revision 2026-10-13-editorial-decisions · effective 2026-10-11
Current revision. This is the snapshot used by the live entity page.
Impact set to null: the text described use of the app and the decline of the network, not an effect of the app; the network figures remain in the snippet.
sha256:fddc1fcb839d9696eade15747def3bec51461716f28443c623bbae79c8c742f1
replace /snapshot/projectFingerprint — Updated projectFingerprint to the current sourced project record.replace /snapshot/claims — Updated claims to the current sourced project record.replace /snapshot/sources — Updated sources to the current sourced project record.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-548e0562a9cd9dfe
quantitative
Since November 2021 Bucharest's municipal heating company Termoenergetica has run Termoalert, a public app and web map showing the live state of the city's district-heating network
clm-8de31fa54320e08b
descriptive
every outage with the blocks affected, its cause, repair progress and an estimated restart time, plus push alerts for saved addresses
clm-85f3f35aa28ead18
quantitative
924 km of primary and 2,763 km of secondary pipes, much of it more than 25 years old
clm-9aa0b0c394523500
quantitative
lost 37.73% of the heat fed into it in 2024, about 1.7 million MWh worth roughly 400 million lei, according to the city's own energy balance
clm-fd8712c565ff0d21
quantitative
on 1 May 2026 around 3,500 blocks had hot water off or far below normal at once
clm-b8bbfb3637b89aae
descriptive
The map does not fix the pipes; it tells residents which day theirs will run cold.
clm-3df17ea1b137f59a
quantitative
publishing the failure in real time is cheaper and faster than replacing 273 km of trunk pipe older than 25 years, which the city's 2024 balance prices at €819 million
clm-7038619c61c5f065
descriptive
a published restart time is a promise the pipes may not keep: shown before the trench is opened, it moves as the damage is found
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:fddc1fcb839d9696eade15747def3bec51461716f28443c623bbae79c8c742f1
src-75c278d1c9aa94e0Operator's page for the app: download links, adding addresses to follow the network's status, consulting all alerts and subscribing to notifications about outages of interest.
src-09cfb5eff0fca7e0Operator's live page: describes Termoalert (real-time notifications on any outage, its cause, repair progress and expected restart date) and carries a map of the network's state plus a table of current outages by sector and heating substation, with blocks affected, cause and estimated restart time.
src-68a23e219e33e1daLaunch report: Termoenergetica's director general Claudiu Crețu announces Termoalert, a free Android/iOS app reporting outages in real time with the reason for the stoppage, progress of repairs and the expected restart date; he says the system 'has problems' after ten years without investment.
src-748455d0bc5935c8Operator's store listing: all outages in Bucharest in real time, the areas affected and estimated repair deadlines, notifications for saved addresses, system performance indicators; last updated 12 November 2025, more than 100,000 downloads.
src-e539cf4b8ca73ecaTermoenergetica notice on a primary-network failure (400 blocks and Fundeni hospital without hot water); the company says initial restart deadlines are estimated before sites are opened and that customers are informed by phone lines and through the Termoalert app; the pipe in the area dates from 1970.
src-9cfe1ace1aa7ef8aReports the 2024 energy balance published by Bucharest City Hall: 37.73% real heat losses (1.7 million MWh), about 400 million lei of heat lost (300 million on the primary, over 90 million on the secondary network), 5,626 outages in 2024 against 4,941 in 2023 and 4,412 in 2022, 924.09 km primary and 2,763 km secondary pipe, 61.77% of primary pipe over 25 years old, and 273 km of trunk pipe to replace for €819 million.
src-7b8b34040302ab63January 2026 crisis: a boiler failure at CET Sud from 4 January left more than 3,500 blocks without heat and hot water at normal parameters; Termoenergetica repeatedly postponed the resolution date and displayed a new estimate of 16 January, 23:30.
src-d7a8053be92116ddCiting Termoenergetica: on the morning of 1 May 2026 about 3,500 blocks and buildings had hot water off or at very low parameters after a failure at CET Grozăvești, and only 62% of the network worked normally; modernisation works in Berceni affected about 1,000 blocks.