DTU led a consortium (Copenhagen Municipality, HOFOR, By & Havn, Danfoss, ABB and others)
Permanent project revision
Revision 2026-10-14-baseline · effective 2026-10-14
Current revision. This is the snapshot used by the live entity page.
Created the first structured Evidence Passport with 16 claims and 8 source dossiers.
sha256:7942dd7a6325873e60ae20012caff82f33453891a97b9d766fe1c882f362796f
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-40a102a66b9cd93b
descriptive
DTU led a consortium (Copenhagen Municipality, HOFOR, By & Havn, Danfoss, ABB and others)
clm-c8489a4a58eb740c
quantitative
turned Nordhavn into a live smart-energy testbed, 2015–2019
clm-18819b680b2e286c
descriptive
AC and DC electric-vehicle charging in a car park
clm-d88c56ed345e075d
descriptive
ultra-low-temperature district heating
clm-dc18ea9a63ed3384
quantitative
from floor-heating controls in 85 apartments
clm-bb0d7bed3f04472d
descriptive
to the utility turning down the heat supply of whole buildings
clm-df8d05e886672f48
quantitative
The formal project ended in 2019
clm-b260748163db1983
descriptive
HOFOR later extended flexible district heating to Nørrebro
clm-82dba00b95cc9194
quantitative
In 23 Copenhagen buildings in the 2017/18 heating season, compared with a reference period a year earlier
clm-535c1f195631c4be
quantitative
it could cut the heat supply for about 3 to 4 hours in older buildings and up to 7 hours in new heavy ones without indoor temperatures falling more than its 1°C limit
clm-e49e96ae8a6ffdd9
descriptive
although residents in a few buildings complained even when no large drop was measured
clm-986885425e14a5f5
quantitative
In a second phase in winter 2018/19, software control at eight pilot sites cut their daily peak heat demand by 15% on average, corrected for outdoor temperature against a 2017 reference period.
clm-5e186ab82ec614c3
descriptive
residents' own thermostat schedules created extra peaks
clm-8a6fda93705f37ba
descriptive
installers had swapped thermostats between rooms
clm-029ca419749a2d59
descriptive
HOFOR concluded there was huge potential in better operation and maintenance of customers' heating systems
clm-6e1293fafeede937
descriptive
A building's thermal mass can stand in for a peak boiler for a few hours
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:7942dd7a6325873e60ae20012caff82f33453891a97b9d766fe1c882f362796f
src-3a8de9d0028ca741Funder record for case 64014-0555: led by DTU with Copenhagen Municipality, HOFOR, Ørsted, By & Havn, ABB and others; period 2015–2019; budget DKK 128.95m, of which a DKK 76.97m grant (60%).
src-47b6598b713abfd3DTU's project record: Nordhavn as a living energy laboratory, start and end 1 April 2015 to 31 March 2019, partner list.
src-e0ef74f13c12534fDanfoss case story: Danfoss leads the EnergyLab Nordhavn sub-project on smart components, with ultra-low-temperature district heating substations, remote-controlled radiator thermostats and surplus heat from a supermarket's refrigeration.
src-0eb2d06df76fb3bfRegional news, April 2019: HOFOR extends its flexible district-heating trial from Nordhavn to about 3,000 residents on Nørrebro; heat may be turned down in more than 3,300 apartments in the two areas.
src-d06e8754a8b1d615Final report of the Danfoss-led sister project (EUDP 64015-0055): floor-heating controls installed in 85 apartments in the Havnekanten building shifted heating entirely out of the peak period with negligible effect on indoor temperatures; residents' thermostat schedules and installation errors undermined the flexibility.
src-71cd28ff874d5870HOFOR's public deliverable: field measurements in 23 buildings in winter 2017/18 against a reference period; heat supply cut for 3–4 hours in older buildings and up to 7 hours in new heavy buildings within a 1°C comfort limit; complaints in a few buildings.
src-59bd1f949e6884a5Public deliverable by Leanheat and HOFOR: software-based peak power optimisation at eight pilot sites in winter 2018/19 reduced daily peak power by 15% on average, temperature-corrected against a 2017 reference period.
src-ba3cc021de7482a7Public deliverable: eight charging outlets (five AC, three DC) installed and in service in Nordhavn; a battery buffer for the Lüders car park recommended as an upcoming project; CleanCharge's activities taken over by Nerve Smart Systems.