clm-cc3fb9ab72f31fc9
quantitative
Since 2015 the Water Supplies Department has divided Hong Kong's freshwater network into about 2,400 District Metering Areas
Permanent project revision
Revision 2026-08-27-claims-and-sources · effective 2026-07-17
Superseded. A later revision exists: 2026-08-27-source-dating →
Created the first structured Evidence Passport with 10 claims and 4 source dossiers.
sha256:023ff83c77579767483e3ceffef94b7b944de9d06af59f78346785cb68a7ef25
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-cc3fb9ab72f31fc9
quantitative
Since 2015 the Water Supplies Department has divided Hong Kong's freshwater network into about 2,400 District Metering Areas
clm-63a9c501a03c90dd
descriptive
each fitted with flow and pressure sensors feeding a central analytics system that pinpoints leaks and manages pressure
clm-67219a87052d1212
quantitative
All 2,400 zones were completed by March 2025, covering about 80% of the fresh water distribution network; trunk mains and the remaining distribution mains are being added in phases
clm-829216dbba705faf
quantitative
Overall mains leakage fell from over 25% (2000) to 13.4% (2024)
clm-cf525ddfc390ca3b
quantitative
the department's stated target is to bring the leakage rate of government water mains, about 15% in 2017, below 10% by 2030
clm-7cd105de767b6e3a
quantitative
Mains leakage cut from over 25% (2000) to 13.4% (2024) and annual water-main bursts from around 2,500 (2000) to 27 (2024)
clm-ed53e183cbb9c909
quantitative
all 2,400 DMAs completed by March 2025, covering about 80% of the fresh water distribution network
clm-189acd4a9b9521f6
quantitative
the leakage rate started falling in 2000, when the department replaced and rehabilitated about 3,000 km of aged mains in a programme that ran until 2015 — the year the sensor network began
clm-e52239a40911a7a3
quantitative
the network still covers only about 80% of fresh water distribution mains
clm-fe6b79293f4f4fcb
quantitative
the 10%-by-2030 target is set against a different measure (government water mains, about 15% in 2017) than the 13.4% usually quoted
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
Erratum on this revision's envelope. The snapshot, its hash and its permanent link are untouched.
sha256:023ff83c77579767483e3ceffef94b7b944de9d06af59f78346785cb68a7ef25
src-45efefba17fd9fb5A standing project page that carries no publication date.
src-0c67dc3c487d38bbLeakage-rate figures and DMA completion; mains-burst prevention measures.
src-b2cb6550769f7f45An undated departmental blog entry; it describes the state of the rollout at more than 1,300 DMAs.
src-e3675219f7c3dc0cA standing strategy page that carries no publication date; source for the leakage-rate target.