10 colour-coded lines over 33 km, which Xinhua describes as the world's largest urban cable network
Permanent project revision
Revision 2026-08-27-correction-run · effective 2026-08-27
Current revision. This is the snapshot used by the live entity page.
Read the IDB release in full and record what it states; date the remaining sources or record an explicit null.
sha256:53bf8f2d869134013073bb2cecda7683789ab99b9b046beea46e720a5ef5345b
replace /snapshot/projectFingerprint — Updated projectFingerprint to the current sourced project record.replace /snapshot/sources — Updated sources to the current sourced project record.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-c7e9651606445a90
quantitative
10 colour-coded lines over 33 km, which Xinhua describes as the world's largest urban cable network
clm-0d4d55a9c6fca6ec
quantitative
It kept running — and added cabins on three lines in May 2026 — while road transport was repeatedly paralysed by blockades and fuel shortages
clm-e96312c4165e60fb
quantitative
A USD 62 million IDB package is to extend the Brown Line and put solar panels on most station roofs; the operator says the Brown Line credit is approved, while the report carrying the figure says the package as a whole still awaits approval by the Plurinational Legislative Assembly
clm-19f209997ca3b2cf
quantitative
Mi Teleférico had carried more than 640 million users in a little over 11 years by September 2025, across 10 lines and 33 km
clm-ea12c512a42942e2
quantitative
a USD 62 million IDB package, USD 42 million of it for the Brown Line extension itself plus solar generation at stations, was still awaiting approval by the Plurinational Legislative Assembly when the operator set out the plan in July 2026
clm-a4dfeaa82680b5e8
descriptive
It kept running through blockades and fuel shortages that paralysed road transport, because a cable network's fuel is electricity and its right of way is air
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:53bf8f2d869134013073bb2cecda7683789ab99b9b046beea46e720a5ef5345b
src-a259a4ff71cddfe8The operator's own site: network, lines and fare products. A continuously updated home page with no publication date.
src-991c86423adfb395IDB news release announcing the approved 62 million dollar loan to extend the Brown Line from Las Villas to Pampahasi and to install solar photovoltaic generation at stations Mi Teleférico manages, with a 21.5-year repayment term. The page states no publication date.
src-21dab96a9ab6f6b6Published 8 July 2026, quoting Mi Teleférico's executive manager Christian Eduardo Rojas. Carries the USD 62 million IDB package, of which 'la ampliación de la línea como tal demandará 42 millones de dólares', solar panels planned on most station roofs, and an airport link served by four electric buses between the 6 de Marzo station and El Alto international airport. Note the tension inside the piece: the standfirst says the USD 62 million is 'a la espera de su aprobación en la Asamblea Legislativa Plurinacional', while Rojas says the Brown Line credit itself 'tiene un crédito aprobado en la Asamblea'.
src-cafc8ce014fdc4e7Bolivian press, May 2026: normal operations continuing and extra cabins added on the Green, Silver and Blue lines, with a quote from the operator's executive manager.
src-cd4df9e6b9e8cbdeXinhua's Spanish service, dateline La Paz 1 September 2025. The ridership figure and the superlative in one place: the system 'opera con 10 líneas de colores, conecta a las ciudades de La Paz y El Alto mediante 33 kilómetros de extensión, lo que lo convierte en la red de transporte por cable urbano más grande del mundo', has carried more than 640 million users in 11 years, and completed its network with the Silver line in March 2019. Also the fares: preferential rates of 1.50 and 1 boliviano, against operator estimates that privatisation could multiply fares up to eightfold, to 20-25 bolivianos (USD 2.9-3.6).