PPWSA: Metering Out a 72% Water Loss
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
How this atlas is made · What “last verified” means · What “source-checked” means · The full record behind this page
✎ Updated 21 Aug 2026 Publication date recorded for 7 sources. · 2 revisions in all What changed →
In 1993 Phnom Penh's water utility lost 72% of what it produced, and only 12.61% of its connections had a meter. From 1994 it fitted meters to every household connection, enforced billing and put zoned teams on leak control. Losses fell to 6% by 2008 and bill collection rose from 48% to over 98%. SCADA and GIS came later.
what does this mean?
The strongest source is an independent non-academic evaluation: an audit office, a government or EU review, or an NGO. It grades who did the looking — not how well the project went. All four grades →📊 Impact
Non-revenue water fell from 72% in 1993 to 6% in 2008, with 24-hour supply reaching about 90% of a city of 1.3 million and no state operating subsidy. It has since drifted back up: PPWSA puts the loss rate at 8.75% for 2023.
🎓 Lesson
The turnaround ran on meters and enforced bills, not on a control room: SCADA, GIS and spot-billing arrived only after 2015. And a loss rate is no ratchet — as the network aged and spread, losses climbed back from a 5.9% low at the end of 2009.
Sources
Show 2 more sourcesShow fewer
📅 How old is the evidence?
Two clocks, kept apart: when this entry’s sources were published, and what has happened to its record in the atlas. Documented span: since 1993. 4 of 7 sources carry a publication date, from 4 June 2010 to 18 December 2025.
When the sources were published
- Water Online · pressSIWI Stockholm Industry Water Award 2010 — announcement
- Smart Water Magazine · pressSmart Water Magazine — Bakheng plant construction start (2021)
- International Water Association · industry associationThe Source (IWA magazine) — PPWSA's path to progress (2021)
- International Water Association · industry associationIWA — Building a Resilient Water Future for Phnom Penh (2025)
What happened to this record
Show your work What this page rests on and what it can’t tell you · all 15 claims with their sources · the forensic record
Evidence Passport · public beta 15 addressable claims, 7 source dossiers, one permanent baseline. The passport is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.
Inspect the claims, one by one — verbatim text, sources and caveats for all 15
The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-2e3e132a729b4e1e
quantitative
lost 72% of what it produced
Sources carrying this claim
clm-f26981548d84a8dd
quantitative
only 12.61% of its connections had a meter
Sources carrying this claim
clm-baeea6d0401ad864
quantitative
From 1994 it fitted meters to every household connection
Sources carrying this claim
clm-3d83191d791ab2ea
descriptive
put zoned teams on leak control
Sources carrying this claim
clm-a8f84b11aa1beb15
quantitative
Losses fell to 6% by 2008
Sources carrying this claim
clm-7390bbf26fa77586
quantitative
bill collection rose from 48% to over 98%
Sources carrying this claim
clm-b1db28fc25432bc8
descriptive
SCADA and GIS came later
Sources carrying this claim
clm-d9a31468afc2dea4
quantitative
Non-revenue water fell from 72% in 1993 to 6% in 2008
Sources carrying this claim
clm-c18d9057ea1c31d0
quantitative
24-hour supply reaching about 90% of a city of 1.3 million
Sources carrying this claim
clm-9295353a5a047a79
descriptive
no state operating subsidy
Sources carrying this claim
clm-4f90eeee54e4d818
descriptive
It has since drifted back up
Sources carrying this claim
clm-be389d3c3064bc6c
quantitative
PPWSA puts the loss rate at 8.75% for 2023
Sources carrying this claim
clm-93c5d27785b5d516
quantitative
SCADA, GIS and spot-billing arrived only after 2015
Sources carrying this claim
clm-155500b4b5da08fd
descriptive
as the network aged and spread
Sources carrying this claim
clm-7281b1689c3d9b48
quantitative
losses climbed back from a 5.9% low at the end of 2009
Sources carrying this claim
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:88c6501de1014e3a3db405446042a86d215cfb4d589956d60c7072a94abd5e00
- 15
- of 15 claims mapped
- 7
- source dossiers
- 4
- publication dates recorded
- 0
- archives linked
- 0
- exact locators
- 0
- content captures hashed
Governance facts carried by the record
- Operator
- Phnom Penh Water Supply Authority (PPWSA)
- Actor types
- utility
- Funding model
- mixed
- Funding description
- Tariff revenue, no state operating subsidy; Bakheng capital works co-financed by AFD, EIB and the EU
- Cost
- Not recorded
- Ownership
- Not recorded
- Decision rights
- Not recorded
- Exit conditions
- Not recorded
7 source dossiers
PPWSA — Non-revenue water (operator)
- Stable source ID
src-8e8f1f55e07367c7- Publisher
- Name not classified · ppwsa.com.kh
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-17
- Dossier created
- 2026-08-21
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Operator's own NRW page: 72% in 1993, 12.61% of connections metered in 1993, meters on all household connections from 1994, Class B→C meter upgrade from 1997, 8 water-loss groups with 63 technical staff by 2023, and 8.75% for 2023. Fetched 2026-08-17.
SIWI Stockholm Industry Water Award 2010 — announcement
- Stable source ID
src-868c00d88a1e3bba- Publisher
- Name not classified · wateronline.com
- Type / language
- web-page · language not classified
- Published
- 2010-06-04
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-17
- Dossier created
- 2026-08-21
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Independent award citation with the core figures: 72% (1993) → 6% (2008), collection over 98%, 90% coverage of a city of 1.3 million, 24-hour service, no state subsidy. SIWI's own winner page now 404s; this announcement carries the jury text.
The Source (IWA magazine) — PPWSA's path to progress (2021)
- Stable source ID
src-d875914f258b27e7- Publisher
- Name not classified · thesourcemagazine.org
- Type / language
- web-page · language not classified
- Published
- 2021-11-26
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-17
- Dossier created
- 2026-08-21
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
26 November 2021: NRW above 70% (1993) → 5.9% at end-2009; collection 48% → 99%; 333,288 connections in 2020; GIS with SCADA and the Sense Water loss-management system after 2015; spot-billing from mid-2017.
IWA — Building a Resilient Water Future for Phnom Penh (2025)
- Stable source ID
src-176b42db6752f691- Publisher
- Name not classified · iwa-network.org
- Type / language
- web-page · language not classified
- Published
- 2025-12-18
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-17
- Dossier created
- 2026-08-21
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
18 December 2025, the most recent source found. Gives 8.93% for 2023 (PPWSA's own page says 8.75% — the two are not averaged), and attributes the rise to urbanisation, expansion and an ageing network.
- Claims linked
PPWSA — History (operator)
- Stable source ID
src-f5c283ee4439b583- Publisher
- Name not classified · ppwsa.com.kh
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-17
- Dossier created
- 2026-08-21
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Founding by Royal Decree 164NS of 24 March 1960; 72% loss in 1993; 365,120 customers at end-2018. PPWSA has been listed on the Cambodia Securities Exchange since 2012.
- Claims linked
- Background source; no baseline claim points here
Biswas & Tortajada (2010), Int. J. Water Resources Development 26(2)
- Stable source ID
src-a88c519d262fea8e- Publisher
- Name not classified · tandfonline.com
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-17
- Dossier created
- 2026-08-21
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
The peer-reviewed independent study of this turnaround. Listed for the record — the full text was not retrievable during this review, so no figure in this entry is attributed to it.
- Claims linked
- Background source; no baseline claim points here
Smart Water Magazine — Bakheng plant construction start (2021)
- Stable source ID
src-b6a75138724f33d2- Publisher
- Name not classified · smartwatermagazine.com
- Type / language
- web-page · language not classified
- Published
- 2021-02-02
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-17
- Dossier created
- 2026-08-21
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
The current capital programme: capacity from 600,000 to about 1,000,000 m³/day; AFD $186.4M, EIB $100M, EU $15M grant, PPWSA $80M; construction started February 2021.
- Claims linked
- Background source; no baseline claim points here
Known limits of this passport
- Publisher names and source languages have not yet been classified; domains are recorded without guessing.
- Existing source notes are descriptive locators, not page- or paragraph-exact citations.
- A missing archive, publication date or content hash is shown as null rather than inferred.
- The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “PPWSA: Metering Out a 72% Water Loss” — Phnom Penh, Cambodia. The Smart City Atlas. https://1001smartcities.org/projects/phnom-penh-ppwsa-water/ (last verified 2026-08-17). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.
