clm-174fb793bca6b307
descriptive
State Grid Shanghai aggregates data centres, building air conditioning and EV charging points into a virtual power plant it can call on when the city grid peaks
Permanent project revision
Revision 2026-08-27-claims-and-sources · effective 2026-08-27
Current revision. This is the snapshot used by the live entity page.
Created the first structured Evidence Passport with 8 claims and 5 source dossiers.
sha256:cab1300e7471f46cc8d22d90e985f3dfa6c958629d3a0075e8d37ad37cc4755c
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-174fb793bca6b307
descriptive
State Grid Shanghai aggregates data centres, building air conditioning and EV charging points into a virtual power plant it can call on when the city grid peaks
clm-07bfad649e33bd31
quantitative
A trial launched in December 2019 with four aggregators and 512 customers
clm-7192d9d5590074df
quantitative
On 11 August 2025, as Shanghai set a record load of 40.55 million kW
clm-98513c4c9fed934d
quantitative
the utility says the virtual power plant shifted 1.163 million kW
clm-51afd31065ef51ed
quantitative
State Grid Shanghai reports a record 1.163 million kW of load shifted during the August 2025 heatwave, drawn from 47 aggregators
clm-5cd0aab803cda8c6
quantitative
registered capacity reached 2.03 million kW across 49 operators, up 81% since 2024
clm-77a0591f42820548
descriptive
Operator-reported, not independently audited
clm-c83bc88f6aae39d8
quantitative
the trade press reported the same event as 1.163 million kilowatt-hours, which is a different measure of a different thing
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
Erratum on this revision's envelope. The snapshot, its hash and its permanent link are untouched.
sha256:cab1300e7471f46cc8d22d90e985f3dfa6c958629d3a0075e8d37ad37cc4755c
src-f5e13d30bdd1f58cCarrying source for the impact figures: a record load adjustment of 1.163 million kW from 47 operators including data centres, building air conditioning and EV charging stations; registered capacity 2.03 million kW across 49 operators, up 81% since 2024. Operator-reported.
src-2bdee5292126cd16Corroboration of the grid peak: 40.55 million kW at 11:23 on 11 August 2025, a new historical high, with virtual power plant adjustment among the measures deployed.
src-0aaf093f6246f45aSource for the trial launch on 5 December 2019 with four operators and 512 customers, covering EV charging piles, industrial parks, commercial buildings and solar storage. Its 'China's first' framing is not used in this entry.
src-0cf82f3650468103Governance context: Songjiang District's trial VPP management measures, effective April 2025, targeting a 100 MW demand-side peak-shaving VPP by end-2025. A district framework, not the citywide aggregation.
src-2cdab8e21e9a42d5Trade-press pickup of the same August 2025 event. Caution: it renders the figure as kWh; the Chinese original and China News Service report 1.163 million kilowatts of load adjustment, not kilowatt-hours.