Shanghai's Virtual Power Plant demand response
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
13 sourced claims on this page, none individually verified yet — turn on “Sources in the text” to see each one.
How this atlas is made · What “last verified” means · What “source-checked” means · The full record behind this page
✎ Corrected 27 Sep 2026 1 source added. What changed →
It began in 2019 as a trial with four aggregators and 512 customers. During the August 2025 heatwave the utility says it shifted 1.163 million kW — an operator figure, not audited.
what does this mean?
The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →Part of 1001 Smart Cities — 1,216 documented projects · 🏙️ 11 more in Shanghai · 🔌 Smart grid & energy guide · ⚡ Energy projects
State Grid Shanghai aggregates data centres, building air conditioning and EV charging points into a virtual power plant it can call on when the city grid peaks. A trial launched in December 2019 with four aggregators and 512 customers. During the August 2025 heatwave, in which Shanghai set a record load of 40.55 million kW on 11 August, the utility says the virtual power plant shifted 1.163 million kW. In July 2026 it reported a larger measured response, 1.6477 million kW.
📊 Impact
State Grid Shanghai reported a then-record 1.163 million kW of load shifted during the August 2025 heatwave, drawn from 47 aggregators; registered capacity reached 2.03 million kW across 49 operators, up 81% since 2024. On 16 July 2026 the utility reported a new measured response of 1.6477 million kW, and put its largest measured response for 2023 to 2026 at 0.32, 0.71, 1.16 and 1.65 million kW. Operator-reported, not independently audited.
🎓 Lesson
A virtual power plant does not make power; it persuades load to go away, and the unit that measures that is easy to lose. Shanghai's August 2025 record was 1.163 million kilowatts of load adjustment — a rate, not a quantity of energy — and the trade press reported the same event as 1.163 million kilowatt-hours, which is a different measure of a different thing. The second number worth keeping apart is registered capacity: 2.03 million kW is what 49 operators have signed up, while 1.163 million kW is what 47 of them delivered during a record heatwave. What a demand-response scheme has on paper and what it produces on the day are two figures, and only the second one keeps the lights on.
Sources
Show 1 more sourcesShow fewer
📅 How old is the evidence?
Two clocks, kept apart: when this entry’s sources were published, and what has happened to its record in the atlas. Documented span: since 2019. 6 of 6 sources carry a publication date, from 19 December 2019 to 24 July 2026.
When the sources were published
- Yicai Global · pressYicai Global — Shanghai Is Trialing China's First Virtual Power Plant (19 Dec 2019)
- Shanghai Municipal Government · city governmentShanghai Municipal Government — Shanghai develops framework to regulate virtual power plants (27 May 2025)
- China Daily · pressChina Daily — Shanghai secures power supply amid record high demand (13 Aug 2025)
- China News Service · pressChina News Service — Shanghai conducts first million-kilowatt virtual power plant operation (15 Aug 2025)
- Microgrid Knowledge · pressMicrogrid Knowledge — Virtual Power Reaches Global: China Claims New Aggregation Record (15 Aug 2025)
- 21st Century Business Herald (21世纪经济报道) · press21st Century Business Herald (reprinting The Paper) — Shanghai virtual power plant sets 1.6477 million kW measured-response record (24 Jul 2026)
What happened to this record
- Entered the record
- 1 source added
- Sources last read
Show your work What this page rests on and what it can’t tell you · all 13 claims with their sources · the forensic record
Evidence file · public beta 13 addressable claims, 6 source dossiers, one permanent baseline. The file is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.
Inspect the claims, one by one — verbatim text, sources and caveats for all 13
The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-174fb793bca6b307
descriptive
State Grid Shanghai aggregates data centres, building air conditioning and EV charging points into a virtual power plant it can call on when the city grid peaks
Sources carrying this claim
clm-07bfad649e33bd31
quantitative
A trial launched in December 2019 with four aggregators and 512 customers
Sources carrying this claim
clm-413ac78adc8206ea
quantitative
in which Shanghai set a record load of 40.55 million kW on 11 August
Sources carrying this claim
clm-98513c4c9fed934d
quantitative
the utility says the virtual power plant shifted 1.163 million kW
Sources carrying this claim
clm-42fcf2e001a6b480
quantitative
In July 2026 it reported a larger measured response, 1.6477 million kW
Sources carrying this claim
clm-cf9e99fbab7a975e
quantitative
State Grid Shanghai reported a then-record 1.163 million kW of load shifted during the August 2025 heatwave, drawn from 47 aggregators
Sources carrying this claim
clm-5cd0aab803cda8c6
quantitative
registered capacity reached 2.03 million kW across 49 operators, up 81% since 2024
Sources carrying this claim
clm-72437cfc556c832f
quantitative
On 16 July 2026 the utility reported a new measured response of 1.6477 million kW
Sources carrying this claim
clm-05f6300ef607f697
quantitative
put its largest measured response for 2023 to 2026 at 0.32, 0.71, 1.16 and 1.65 million kW
Sources carrying this claim
clm-77a0591f42820548
descriptive
Operator-reported, not independently audited
Sources carrying this claim
- China News Service — Shanghai conducts first million-kilowatt virtual power plant operation (15 Aug 2025)
- China Daily — Shanghai secures power supply amid record high demand (13 Aug 2025)
- 21st Century Business Herald (reprinting The Paper) — Shanghai virtual power plant sets 1.6477 million kW measured-response record (24 Jul 2026)
clm-c3dec9eb0cce68d7
quantitative
Shanghai's August 2025 record was 1.163 million kilowatts of load adjustment
Sources carrying this claim
clm-c83bc88f6aae39d8
quantitative
the trade press reported the same event as 1.163 million kilowatt-hours, which is a different measure of a different thing
Sources carrying this claim
clm-1a8c3f073380c04c
quantitative
2.03 million kW is what 49 operators have signed up, while 1.163 million kW is what 47 of them delivered during a record heatwave
Sources carrying this claim
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:c127c88827f35f743a8cda8056940cf0d3fb32cb06f4f3b69b2475a39e62ede2
- 13
- of 13 claims mapped
- 6
- source dossiers
- 6
- publication dates recorded
- 0
- archives linked
- 0
- exact locators
- 0
- content captures hashed
Governance facts carried by the record
- Operator
- State Grid Shanghai Municipal Electric Power Company
- Actor types
- utility
- Funding model
- utility
- Funding description
- Not recorded
- Cost
- Not recorded
- Ownership
- Not recorded
- Decision rights
- Not recorded
- Exit conditions
- Not recorded
6 source dossiers
China News Service — Shanghai conducts first million-kilowatt virtual power plant operation (15 Aug 2025)
- Stable source ID
src-f5e13d30bdd1f58c- Publisher
- Name not classified · ecns.cn
- Type / language
- web-page · language not classified
- Published
- 2025-08-15
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-09-27
- Dossier created
- 2026-09-27
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Carrying source for the impact figures: a record load adjustment of 1.163 million kW from 47 operators including data centres, building air conditioning and EV charging stations; registered capacity 2.03 million kW across 49 operators, up 81% since 2024. Operator-reported.
China Daily — Shanghai secures power supply amid record high demand (13 Aug 2025)
- Stable source ID
src-2bdee5292126cd16- Publisher
- Name not classified · global.chinadaily.com.cn
- Type / language
- web-page · language not classified
- Published
- 2025-08-13
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-09-27
- Dossier created
- 2026-09-27
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Corroboration of the grid peak: 40.55 million kW at 11:23 on 11 August 2025, a new historical high, with virtual power plant adjustment among the measures deployed.
- Claims linked
Yicai Global — Shanghai Is Trialing China's First Virtual Power Plant (19 Dec 2019)
- Stable source ID
src-0aaf093f6246f45a- Publisher
- Name not classified · yicaiglobal.com
- Type / language
- web-page · language not classified
- Published
- 2019-12-19
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-09-27
- Dossier created
- 2026-09-27
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Source for the trial launch on 5 December 2019 with four operators and 512 customers, covering EV charging piles, industrial parks, commercial buildings and solar storage. Its 'China's first' framing is not used in this entry.
- Claims linked
Shanghai Municipal Government — Shanghai develops framework to regulate virtual power plants (27 May 2025)
- Stable source ID
src-0cf82f3650468103- Publisher
- Name not classified · english.shanghai.gov.cn
- Type / language
- web-page · language not classified
- Published
- 2025-05-27
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-09-27
- Dossier created
- 2026-09-27
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Governance context: Songjiang District's trial VPP management measures, effective April 2025, targeting a 100 MW demand-side peak-shaving VPP by end-2025. A district framework, not the citywide aggregation.
- Claims linked
- Background source; no baseline claim points here
Microgrid Knowledge — Virtual Power Reaches Global: China Claims New Aggregation Record (15 Aug 2025)
- Stable source ID
src-2cdab8e21e9a42d5- Publisher
- Name not classified · microgridknowledge.com
- Type / language
- web-page · language not classified
- Published
- 2025-08-15
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-09-27
- Dossier created
- 2026-09-27
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Trade-press pickup of the same August 2025 event. Caution: it renders the figure as kWh; the Chinese original and China News Service report 1.163 million kilowatts of load adjustment, not kilowatt-hours.
- Claims linked
21st Century Business Herald (reprinting The Paper) — Shanghai virtual power plant sets 1.6477 million kW measured-response record (24 Jul 2026)
- Stable source ID
src-99503fc4a4b22a07- Publisher
- Name not classified · 21jingji.com
- Type / language
- web-page · language not classified
- Published
- 2026-07-24
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-09-27
- Dossier created
- 2026-09-27
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Reprint of a The Paper (澎湃新闻) report citing Shanghai's power authorities: a measured VPP response of 164.77 wan kW (1.6477 million kW) on the afternoon of 16 July 2026, 47 VPP operators in a further call on 23 July, and a largest measured response of 32, 71, 116 and 165 wan kW for 2023 to 2026. Operator-reported. Chinese-language.
Known limits of this file
- Publisher names and source languages have not yet been classified; domains are recorded without guessing.
- Existing source notes are descriptive locators, not page- or paragraph-exact citations.
- A missing archive, publication date or content hash is shown as null rather than inferred.
- The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Shanghai's Virtual Power Plant demand response” — Shanghai, China. The Smart City Atlas. https://1001smartcities.org/projects/shanghai-virtual-power-plant/ (last verified 2026-09-27). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.