Johan Cruijff ArenA Battery Storage & Vehicle-to-Grid Pilot
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
How this atlas is made · What “last verified” means · What “source-checked” means · The full record behind this page
A 3 MW battery built from the equivalent of 148 Nissan LEAF batteries, second-life and new, with Eaton power-conversion tech and rooftop solar has powered Amsterdam's Johan Cruijff ArenA since June 2018, installed to back up the arena in place of diesel generators. A bidirectional (V2G) pilot began in December 2019 with the first of fifteen chargers, letting consenting visitors' EVs feed power back to the arena. A second battery installed in 2024 raised total storage to 8.6 MWh.
what does this mean?
The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →Sources
📅 How old is the evidence?
Two clocks, kept apart: when this entry’s sources were published, and what has happened to its record in the atlas. Documented span: since 2018. 4 of 4 sources carry a publication date, from 29 June 2018 to 12 August 2024.
When the sources were published
- Eaton · vendorEaton (technology partner)
- electrive · presselectrive.com (trade press) · updated 10 December 2019
- Johan Cruijff ArenA · operatorJohan Cruijff ArenA (operator)
- pv magazine International · presspv-magazine (trade press)
Show your work What this page rests on and what it can’t tell you · all 10 claims with their sources · the forensic record
Evidence Passport · public beta 10 addressable claims, 4 source dossiers, one permanent baseline. The passport is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.
Inspect the claims, one by one — verbatim text, sources and caveats for all 10
The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-25af35f2a395f4dd
quantitative
A 3 MW battery
Sources carrying this claim
clm-f555043a6624413e
quantitative
the equivalent of 148 Nissan LEAF batteries, second-life and new
Sources carrying this claim
clm-cd22a1a8b0800911
descriptive
with Eaton power-conversion tech
Sources carrying this claim
clm-1f42d315eeae8096
descriptive
rooftop solar
Sources carrying this claim
clm-6cf3025b3c662ece
quantitative
has powered Amsterdam's Johan Cruijff ArenA since June 2018
Sources carrying this claim
clm-06f0a5aa6a583713
descriptive
installed to back up the arena in place of diesel generators
Sources carrying this claim
clm-43d813ed18be0312
quantitative
A bidirectional (V2G) pilot began in December 2019 with the first of fifteen chargers
Sources carrying this claim
clm-9a08a78d50975234
descriptive
letting consenting visitors' EVs feed power back to the arena
Sources carrying this claim
clm-41f18ff17b1b569d
quantitative
A second battery installed in 2024
Sources carrying this claim
clm-dca664ef36ba1ea6
quantitative
raised total storage to 8.6 MWh
Sources carrying this claim
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:843ca20f70a74f1c14b127eaefc3af82e53a4a3b0a2a47dd656b11d5d0cf2ce8
- 10
- of 10 claims mapped
- 4
- source dossiers
- 4
- publication dates recorded
- 0
- archives linked
- 0
- exact locators
- 0
- content captures hashed
Governance facts carried by the record
- Operator
- Johan Cruijff ArenA
- Actor types
- private
- Funding model
- private
- Funding description
- Not recorded
- Cost
- Not recorded
- Ownership
- Not recorded
- Decision rights
- Not recorded
- Exit conditions
- Not recorded
4 source dossiers
Eaton (technology partner)
- Stable source ID
src-272f2c96cc3b5e70- Publisher
- Name not classified · eaton.com
- Type / language
- web-page · language not classified
- Published
- 2018-06-29
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-20
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
3 MW/148-battery system specs, 2018 launch.
Johan Cruijff ArenA (operator)
- Stable source ID
src-3b0337a8a757d4d8- Publisher
- Name not classified · johancruijffarena.nl
- Type / language
- web-page · language not classified
- Published
- 2023-05-23
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-20
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Operator's own account of the battery system and its purpose.
electrive.com (trade press)
- Stable source ID
src-0f7b3df81f25126e- Publisher
- Name not classified · electrive.com
- Type / language
- web-page · language not classified
- Published
- 2019-12-09
- Updated
- 2019-12-10
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-20
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
December 2019 V2G pilot, 15 bidirectional chargers.
pv-magazine (trade press)
- Stable source ID
src-b3ef7090a35cb4d7- Publisher
- Name not classified · pv-magazine.com
- Type / language
- web-page · language not classified
- Published
- 2024-08-12
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-20
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
2024 second-battery expansion to 8.6 MWh.
Known limits of this passport
- Publisher names and source languages have not yet been classified; domains are recorded without guessing.
- Existing source notes are descriptive locators, not page- or paragraph-exact citations.
- A missing archive, publication date or content hash is shown as null rather than inferred.
- The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Johan Cruijff ArenA Battery Storage & Vehicle-to-Grid Pilot” — Amsterdam, Netherlands. The Smart City Atlas. https://1001smartcities.org/projects/amsterdam-arena-energy-storage/ (last verified 2026-07-20). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.
