Bogotá Metro Line 1 — elevated first line, built for driverless running

Revision 2026-08-20-evidence-baseline · effective 2026-07-26

Current revision. This is the snapshot used by the live entity page.

unreviewed

Created the first structured Evidence Passport with 6 claims and 13 source dossiers.

sha256:f93c15263ad1fcb85da4709a817b7377b1443d8bcf1d02a66a1c51d41a40b78f

Change set

  • add /evidencePassport — Added claim-level evidence mapping and source dossiers.
  • add /revisionHistory — Established a permanent, hash-addressed baseline revision.
6
of 6 claims mapped
13
source dossiers
10
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Claims, one by one

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-bdf1fda6974190e0 quantitative
The city reported 80.37% overall progress at 30 June 2026
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The city's own notice carries the progress figure in its headline.
Caveat
Progress reported by the city that is building the line, not by the supervising engineer.

Sources carrying this claim

  1. Alcaldía de Bogotá — Line 1 reaches 80.37% progress
Claim 2 clm-d5c3c549986d4e74 quantitative
ten of thirty CRRC Changchun trainsets delivered by April 2026
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The city's technical notice identifies the manufacturer and the Changchun works the trainsets and rails come from.
Caveat
The count of ten delivered is the city's running tally rather than a figure this notice states.

Sources carrying this claim

  1. Alcaldía de Bogotá — Line 1 technical specifications
Claim 3 clm-31b25aca51e7a755 quantitative
energised automatic test runs began on the viaduct in May 2026 — with a technician in the cab, which the mayor says applies to testing only
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The May 2026 report covers the first controlled runs with citizens aboard, the event the entry dates and qualifies.
Caveat
The 'testing only' qualification is the mayor's statement, relayed by the press, not an operating rule anyone has published.

Sources carrying this claim

  1. Noticias RCN — first controlled rides with people aboard
Claim 4 clm-a1c223cae1de8f82 quantitative
In January 2025 the national government deferred COP 770bn of its own contribution
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The report quotes the finance ministry decree suspending the stated sum for the Line 1 works.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. El Universal — national government defers metro funds
Claim 5 clm-06b93805bd3718e8 quantitative
the supervising engineer put the works marginally behind schedule at mid-2025
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The July 2025 report summarises the supervising engineer's findings on delays, workplace accidents and disagreements.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Infobae — supervising engineer's report on delays and workplace accidents
Claim 6 clm-ab3e86b675816057 descriptive
Bogotá's is contracted, part-delivered and under test — and no source yet says whether staff will ride at launch
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The trade report covers the first trainset entering testing; nothing in it, or in the city's own notices, states the staffing arrangement for revenue service.
Caveat
Negative evidence: the absence of a staffing statement is the finding, and it can only be shown by what the sources do not say.

Sources carrying this claim

  1. Railway Gazette / Metro Report — First Bogotá metro trainset starts testing

Source dossiers and revision state

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-08-20-evidence-baseline effective 2026-07-26 · created 2026-08-20

Awaiting operator and domain-expert review; publication of this revision implies neither.

sha256:f93c15263ad1fcb85da4709a817b7377b1443d8bcf1d02a66a1c51d41a40b78f
6
of 6 claims mapped
13
source dossiers
10
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
Metro Línea 1 S.A.S. (China Harbour Engineering / Xi'an Rail Transportation Group) for Empresa Metro de Bogotá
Actor types
private
Funding model
ppp
Funding description
70% national government / 30% Bogotá district; multilateral lenders IDB, World Bank and EIB
Cost
≈COP 12.9tn (constant 2017 pesos, 2017 co-financing agreement)
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

13 source dossiers

Alcaldía de Bogotá — Line 1 reaches 80.37% progress bogota.gov.co · 1 linked claim

Open original source ↗

Stable source ID
src-b7918ba33a4e806c
Publisher
Name not classified · bogota.gov.co
Type / language
web-page · language not classified
Published
2026-07-21
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Fetched successfully. Carries the sentence 'Con corte al 30 de junio de 2026, el proyecto alcanzó un 80,37 % de avance general', the September 2027 marcha blanca date, and the note that test trains have reached Station 4 at 90 km/h. Official, self-reported by the city.

Descriptive only — not page/paragraph exact
Alcaldía de Bogotá — 77.53% progress, April 2026 bogota.gov.co · background

Open original source ↗

Stable source ID
src-6cf933f24eb9d122
Publisher
Name not classified · bogota.gov.co
Type / language
web-page · language not classified
Published
2026-05-05
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Fetched successfully. Source for the tenth of thirty trainsets arriving in Bogotá in April 2026, and for the monthly progress series (75.50% March, 77.53% April, 78.69% May). Official.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Alcaldía de Bogotá — Line 1 technical specifications bogota.gov.co · 1 linked claim

Open original source ↗

Stable source ID
src-00a61e79338da8e2
Publisher
Name not classified · bogota.gov.co
Type / language
web-page · language not classified
Published
2024-12-31
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Fetched successfully. Source for 30 six-car trainsets at 1,800 passengers each, fully automatic operation without drivers supervised from the Control Centre, CBTC signalling, 750 V DC third rail, platform screen doors, 42.5 km/h commercial speed and 140-second initial headway. This is the operator's own definition of GoA4 — it is a contractual specification, not an observation of service.

Descriptive only — not page/paragraph exact
Alcaldía de Bogotá — Line 1 will have 16 stations bogota.gov.co · background

Open original source ↗

Stable source ID
src-a2a09be0079a1712
Publisher
Name not classified · bogota.gov.co
Type / language
web-page · language not classified
Published
2026-03-06
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Source for 23.96 km, 16 stations, Bosa to Calle 72, eight stations integrated directly with TransMilenio and two by proximity. Verified through the search index of this official page; the page itself was not fetched in this review.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
International Railway Journal — Chinese consortium selected for Bogotá metro contract railjournal.com · background

Open original source ↗

Stable source ID
src-4c6fddb97f616423
Publisher
Name not classified · railjournal.com
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Trade press, October 2019. Source for the award to APCA Transmimetro (China Harbour Engineering Company 85%, Xi'an Rail Transportation Group 15%) and the design-finance-build-operate-maintain-transfer structure. Verified via search listing; not fetched. The concession vehicle Metro Línea 1 S.A.S. is confirmed on the Empresa Metro de Bogotá site.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Railway Gazette / Metro Report — First Bogotá metro trainset starts testing railwaygazette.com · 1 linked claim

Open original source ↗

Stable source ID
src-b474abbe815cb7c2
Publisher
Name not classified · railwaygazette.com
Type / language
web-page · language not classified
Published
2025-04-25
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Trade press, 25 April 2025. Independent confirmation that the 30 six-car sets are fully automated CRRC Changchun stock, that the first set began testing at the Changchun plant, and that trial operation is scheduled for September 2027 with commercial service in March 2028. DIRECT FETCH RETURNED HTTP 403; content verified from the outlet's own search listing and corroborated by the city pages above.

Descriptive only — not page/paragraph exact
Infobae — supervising engineer's report on delays and workplace accidents infobae.com · 1 linked claim

Open original source ↗

Stable source ID
src-5b695d0da635eb8d
Publisher
Name not classified · infobae.com
Type / language
web-page · language not classified
Published
2025-07-31
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Fetched successfully. The interventoría report at cut-off 30 June 2025 recorded 51.97% actual progress against 53.14% planned; 73 workplace incidents in May 2025 alone (62 minor, two serious, nine without incapacity), 106 unsafe acts and 204 unsafe conditions; 2,028 concessionaire claims for unforeseen works, of which the supervisor recommended rejecting 1,007; and that the concessionaire's own safety reporting 'continúa siendo deficiente en calidad y completitud'. The strongest counterweight in the entry.

Descriptive only — not page/paragraph exact
Noticias RCN — first controlled rides with people aboard noticiasrcn.com · 1 linked claim

Open original source ↗

Stable source ID
src-23b7b8e27b53303f
Publisher
Name not classified · noticiasrcn.com
Type / language
web-page · language not classified
Published
2026-05-29
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Fetched successfully. 29 May 2026, a roughly 30-minute controlled run between stations 1 and 2 in Kennedy with people aboard. Carries Mayor Galán's sentence 'El conductor solo está presente durante las pruebas'. This is the only located statement addressing on-board staffing, and it is the mayor's, not an independent verification of what opening day will carry.

Descriptive only — not page/paragraph exact
El Universal — national government defers metro funds eluniversal.com.co · 1 linked claim

Open original source ↗

Stable source ID
src-590e210581f78ba4
Publisher
Name not classified · eluniversal.com.co
Type / language
web-page · language not classified
Published
2025-01-27
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

27 January 2025. The finance ministry's deferral decree suspended COP 770bn of budgeted national contributions to the metro; the district said the transfers 'no son un favor' and that it would cover the gap. A councillor filed a nullity action in February 2025 — the Concejo de Bogotá page documenting that filing returned HTTP 503 to automated fetch.

Descriptive only — not page/paragraph exact
Infobae — Petro calls the elevated metro 'urbanicidio' infobae.com · background

Open original source ↗

Stable source ID
src-26b217b13db385e3
Publisher
Name not classified · infobae.com
Type / language
web-page · language not classified
Published
2025-04-11
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

11 April 2025. Documents that the presidential campaign against the elevated design continued years after the 2023 attempt to bury the northern section failed; the district's position then was that a contract change was 'jurídicamente imposible y técnicamente inviable'. The alignment was never changed.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Infobae — machinery from the works falls on a TransMilenio bus infobae.com · background

Open original source ↗

Stable source ID
src-c622677edf687e11
Publisher
Name not classified · infobae.com
Type / language
web-page · language not classified
Published
2025-09-13
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

12–13 September 2025, Carrera 30 with Calle 16 Sur: part of the construction machinery fell onto a bus, four people injured, none seriously; Empresa Metro de Bogotá demanded measures from the concessionaire and an investigation was opened. Search- and fetch-corroborated across two outlets.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Empresa Metro de Bogotá — total cost of Line 1 metrodebogota.gov.co · background

Open original source ↗

Stable source ID
src-354454b2c8140137
Publisher
Name not classified · metrodebogota.gov.co
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

The operator's own cost page. DIRECT FETCH RETURNED HTTP 503 twice. Its indexed text gives COP 12,945,270,024,403 in constant December 2017 pesos under the co-financing agreement of 9 November 2017, with the nation carrying 70%. Figures circulating in current pesos are higher and are not used here. A separate claim of 'cost overruns above COP 2.3tn' could not be tied to any named dated source and was cut.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Contraloría de Bogotá — audit of the metro's feeder trunk works contraloriabogota.gov.co · background

Open original source ↗

Stable source ID
src-dafafdb9731b83c7
Publisher
Name not classified · contraloriabogota.gov.co
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Context, deliberately kept out of the snippet: the joint audit with the Contraloría General found 22 findings and a fiscal finding of about COP 18.18bn, but these concern the FEEDER AND COMPLEMENTARY TRUNK WORKS contracted through TransMilenio, not the viaduct or the concession described here. Recorded so a future editor does not misattribute it to Line 1's construction contract.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Known limits of this passport
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.