Guangzhou Port Group's Nansha Phase IV terminal, opened 28 July 2022, was the Guangdong-Hong Kong-Macao Greater Bay Area's first fully automated container terminal
Permanent project revision
Revision 2026-08-27-claims-and-sources · effective 2026-08-27
Current revision. This is the snapshot used by the live entity page.
Created the first structured Evidence Passport with 8 claims and 4 source dossiers.
sha256:fe2b88251e8e7c92016b71a6e5e8102e97207acbc94e249cf94b424711e0ded7
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-0ebcb51db30a1177
quantitative
Guangzhou Port Group's Nansha Phase IV terminal, opened 28 July 2022, was the Guangdong-Hong Kong-Macao Greater Bay Area's first fully automated container terminal
clm-ce07d12cff4b6569
descriptive
automated quay cranes hand containers to intelligent guided vehicles (IGVs) routed by an AI scheduling system the operator calls the terminal's "Super Brain," with automated yard cranes replacing on-site crews
clm-34cc47899a52d137
quantitative
with four 100,000-tonne berths and 4.9 million TEU/year design capacity
clm-ba351a95123eac03
quantitative
Container throughput through the automated terminal reached 1.81 million TEUs in the first half of 2024, up 102.7% year-on-year
clm-1f221da78fec2327
quantitative
the operator reports roughly 70% lower manpower needs than a conventional terminal
clm-09d76072a67dffc9
quantitative
a Phase V expansion was approved for the same automated model in March 2025
clm-228118ddea7e2584
quantitative
1.81 million TEUs handled by the automated terminal in H1 2024, up 102.7% year-on-year; operator-reported ~70% lower manpower requirement than a conventional terminal (Guangzhou Port Group / state media, 2022–2024)
clm-9cadbb45bd454453
quantitative
Phase V was approved for the same automated model in March 2025
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
Erratum on this revision's envelope. The snapshot, its hash and its permanent link are untouched.
sha256:fe2b88251e8e7c92016b71a6e5e8102e97207acbc94e249cf94b424711e0ded7
src-a3b656520eb61e2dPublished 1 August 2022. Source for the opening date, the IGV and crane choreography, and two operator statements from He Yeke, general manager of Nansha Phase IV: four 100,000-tonne berths with a total annual handling capacity of 4.9 million TEUs, and 'The automated terminal saves about 70 percent of manpower and guarantees a higher level of safety for production.'
src-90b1382770766142H1 2024 automated-terminal throughput of 1.81M TEUs, +102.7% YoY; Nansha area's 2024 total throughput passing 20M TEUs.
src-34303cbfd34d82f6Confirms automated terminal operations start and technology description.
src-81370bec638a4b5c'Super Brain' AI scheduling system, IGV/automated-crane integration, Phase V approval context.