clm-2a315fc278819df6
quantitative
opened its first phase in December 2016 and its full 51 km in July 2017
Permanent project revision
Revision 2026-08-15-baseline · effective 2026-08-15
Superseded. A later revision exists: 2026-08-20-source-dates-b7 →
Created the first structured Evidence Passport with 7 claims and 3 source dossiers.
sha256:f350b26a5fd63c09e66be618c70fb79aa57e8ac9c760505940cdf098080a5f4f
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-2a315fc278819df6
quantitative
opened its first phase in December 2016 and its full 51 km in July 2017
clm-234373c16ee37472
quantitative
driverless on Bombardier's CITYFLO 650 CBTC
clm-4f2707e45d980c66
quantitative
opening a first phase in June 2022 and the full route on 16 March 2023
clm-737897a4c39e828a
quantitative
57.7 km and 36 stations
clm-5a602999aeb4c520
quantitative
13.5 km of it underground beneath the city centre with nine below-ground stations
clm-e0eb7f965c64ac1f
descriptive
Trains carry no driver; a manual control stand sits behind a locked panel at the head of each train
clm-b25154eb2bac574b
descriptive
the answer is the opening day
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:f350b26a5fd63c09e66be618c70fb79aa57e8ac9c760505940cdf098080a5f4f
src-00b4854b4bbeece857.7 km, 36 stations, 13.5 km underground with nine below-ground stations, phase 1 June 2022, full line 16 March 2023, fully automatic driverless with concealed manual controls, Rapid Rail as operator.
src-10bbe0e310a481b0Vendor release: CITYFLO 650 fully-automated rail control on the 51 km SBK (Kajang) line; phase 1 December 2016, phase 2 July 2017; driverless operation.
src-69cb457633fdeaa5MRT Corp statement of 23 December 2022: phase 2 (38.7 km, 15 elevated + 9 underground stations) from March 2023; 'trains are fully automated and driverless'; puts the completed line at 56.2 km.