clm-7f216450ec6b3467
quantitative
manages the port's 140km of roads and 130 bridges
Permanent project revision
Revision 2026-08-28-evidence-baseline · effective 2026-08-28
Current revision. This is the snapshot used by the live entity page.
Created the first structured Evidence Passport with 14 claims and 7 source dossiers.
sha256:dd340795db89cba6556a19043e1eced40d53ef5898f8c4c90e03629e1d039e67
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-7f216450ec6b3467
quantitative
manages the port's 140km of roads and 130 bridges
clm-669e4edc5e19cb45
quantitative
runs smartBRIDGE, a digital twin of the 1974 Köhlbrand Bridge
clm-f64acfe7014ba75a
quantitative
fuses more than 500 sensors and statutory inspections into live condition indicators
clm-fa860e116fa852f1
descriptive
smartPORT logistics app pushes live traffic and bridge-closure data to truckers
clm-dfa76a0a875fb06e
descriptive
move more goods through the same footprint
clm-6e5031185a44bf3f
descriptive
The twin manages decline rather than reversing it
clm-d9598b8e7bdb669b
quantitative
the 2026 structural inspection found an alarming increase in damage to the river span's longitudinal ribs
clm-e52d3568152c9721
quantitative
rerouted heavy transports above 44 tonnes away from the bridge from 1 May 2026
clm-0abd49ca94db8eec
quantitative
used by some 32,000 vehicles on an average weekday in 2023
clm-14fb0b728d1b2f9c
descriptive
open for regular freight until a replacement bridge opens
clm-b38c91cb0c6ea8a8
descriptive
being extended to a digital twin of the whole main port route
clm-c1cfe459fa3638a3
descriptive
A structural-health twin does not stop the deterioration it measures
clm-2eabba6a7790fa71
descriptive
Continuous monitoring tells the operator where extra inspections are needed
clm-53f96e764fc784d1
quantitative
stepwise load rules, capped by a 44-tonne limit since May 2026, are what keep a 1974 bridge carrying freight until its replacement is ready
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:dd340795db89cba6556a19043e1eced40d53ef5898f8c4c90e03629e1d039e67
src-402645da5dbdf4bbOfficial page by the city or public authority behind the project.
src-d0e81684fe567c95News coverage of the project.
src-182bed9360828b15Industry publication reporting on the project.
src-eea571a3e29ff0c1HPA press release: permit-requiring heavy transports over 44 tonnes are rerouted off the Köhlbrand Bridge from 1 May 2026 after the latest structural inspection found accelerating damage; the stated aim is to keep the 1974 bridge in freight service until a replacement structure opens.
src-9ea455f288c12d3fProject page on HPA's homePORT innovation-campus site: smartBRIDGE is the digital twin of the Köhlbrand Bridge, refining DIN 1076 inspection findings, diagnostics and continuous monitoring from more than 500 sensors into condition indicators.
src-e9d644c49a50849dJournal article by HPA staff (Schwarz, Petersen-Tulipan; Bautechnik 102, 2025) describing smartBRIDGE and the extension of the digital-twin approach to Hamburg's main port route; the smartBRIDGE experience also fed a federal master-plan contribution on digital twins of bridges published in January 2024.
src-7cc114458bf65a3cDated news of the March 2015 contract that moved the smartPORT logistics truck-telematics system from pilot into regular operation — the anchor for this entry's start year.