clm-936618135bade297
quantitative
Two real closures in 28 years of service (8 November 2007 and 21 December 2023)
Permanent project revision
Revision 2026-08-14-evidence-baseline · effective 2026-08-14
Superseded. A later revision exists: 2026-08-20-source-dates-b5 →
Created the first structured Evidence Passport with 2 claims and 4 source dossiers.
sha256:f40649218f91c24096edb40090a61efef20c367ebc76a941f3bdf1044a96f5b6
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-936618135bade297
quantitative
Two real closures in 28 years of service (8 November 2007 and 21 December 2023)
clm-55690d0b5408375e
quantitative
an independent team formally specified and verified its BesW component in mCRL2 in 2025
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:f40649218f91c24096edb40090a61efef20c367ebc76a941f3bdf1044a96f5b6
src-836e75ddb152ccf0Construction 1991-1997, opened 10 May 1997; BOS decides the closure from weather and sea-level data; 3.0 m above NAP threshold, temporarily lowered to 2.6 m for the 2007 season; annual test closure at the end of September or start of October; the two real closures on 8 November 2007 and 21 December 2023; code size figures.
src-bc2221e4cf28c8c8Independent academic work, not operator material. Complete formal specification of the BesW software in mCRL2 including manual and testing modes and all fault situations, with behavioural properties verified in the modal mu-calculus. A preprint: submitted to FMICS 2025, not yet peer-reviewed at the time of writing. Stated verification limits: water levels restricted to a limited set of values, and not all pump and valve failure combinations are covered.
src-911d352edcfaba0fSupplier case study for BOS. Treated as vendor material: used for the system's name and role, not for any performance claim.
src-47d2afef627861bfTrade press, used for context on the wider Delta Works barrier system and Rijkswaterstaat's role as operator.