Mumbai's first fully underground metro
Permanent project revision
Revision 2026-08-21-evidence-baseline · effective 2026-07-26
Superseded. A later revision exists: 2026-08-21-unsourced-text-correction →
Created the first structured Evidence Passport with 13 claims and 7 source dossiers.
sha256:6c8a4ba2432ff069175ba7149ea7fc7fbb1ca721b6a34be9cb86eaf0555a6149
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-0901a7015f62d58c
descriptive
Mumbai's first fully underground metro
clm-1bf37ccfb7ca9ce9
quantitative
opened in three phases between October 2024 and October 2025
clm-7b3ce9e98d3b4fd5
quantitative
33.5 km, 27 stations
clm-639a6ba5cf03441a
quantitative
Alstom supplied 31 eight-car trains with regenerative braking
clm-eae6970dc3d4c72f
descriptive
a CBTC package covering unattended train operation, platform screen doors at every station and electrical and mechanical SCADA
clm-13e2d2c07d803169
descriptive
MMRC said driverless running would start only after six months of trials and safety-regulator clearance
clm-bbe6e9002aec9acb
quantitative
Over its first 136 days the partly opened line carried under 20,000 riders a day
clm-1d0cd7bf0c509d92
quantitative
against a 400,000 forecast
clm-abc9e29ade0d5c03
quantitative
the depot site at Aarey was stayed in 2019, shifted toward Kanjurmarg, then moved back in 2022
clm-b2c287ec5903a007
quantitative
141,000 average weekday riders in October 2025
clm-fa15b13e4a7a35b5
quantitative
the first month with the full 33.5 km corridor open
clm-9cfa0cf442a76b95
quantitative
peaking at 182,000 in a single day
clm-714a7d1e216a3555
descriptive
(MMRC figures reported by PTI)
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:6c8a4ba2432ff069175ba7149ea7fc7fbb1ca721b6a34be9cb86eaf0555a6149
src-f556b4fe0b4ea62bSupplier's release confirming the October 2024 commercial opening. Direct fetch returned 403; existence and content confirmed via search.
src-200c8fd10253bf51Quotes the contract scope: 31 trainsets / 248 cars, EUR 452M, customer MMRC, CBTC with unattended train operation, platform screen doors, electrical and mechanical SCADA, regenerative braking.
src-444bc7fffc927b75MMRC: service trials run with drivers on board; at least six months of trials required for safety-regulator authorisation before converting to driverless mode.
src-65de1b5a9adced88MMRC figures: 38.63 lakh riders in October 2025, 1.41 lakh average weekday, 1.82 lakh peak day; full line opened 9 October 2025.
src-3a761d7b0ed1ffa1MMRC data: 2.66 million riders over 136 days (7 Oct 2024 - 20 Feb 2025), under 20,000/day against a 400,000/day projection for the opened section.
src-76898176186c384cCumulative ridership passed 40 million in April 2026 on the 33.5 km corridor.
src-d453eb48cbb4b5d7Background reference for the three phase-opening dates, 27 stations, and the Aarey depot chronology: stay November 2019, alternative-site committee December 2019, construction resumed July 2022.