In September 2022 Siemens took a contract of about €50 million, financed by a Japanese ODA loan
Permanent project revision
Revision 2026-08-21-evidence-baseline · effective 2026-08-06
Current revision. This is the snapshot used by the live entity page.
Created the first structured Evidence Passport with 14 claims and 3 source dossiers.
sha256:5ab4397ffdedc72297858e8ab604db66f714b3f6fd8977c825c93659a9bb85bd
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-417d210efe14c801
quantitative
In September 2022 Siemens took a contract of about €50 million, financed by a Japanese ODA loan
clm-8548c53edcd73b1e
descriptive
to build two advanced distribution management systems for the Alexandria Electricity Distribution Company
clm-2531875c796ff1d3
descriptive
one for the West Alexandria region, one to supervise every distribution control centre in the city
clm-3b2c3160528b602d
descriptive
plus an Esri geographic information system
clm-a4ade326f0a342e8
quantitative
and 300,000 smart meters
clm-89a832eee337d067
descriptive
over thirty months
clm-27f36383af54e8a2
quantitative
When the prime minister inspected the West centre at New Borg El Arab on 7 June 2026
clm-44acbe5fe89897d0
descriptive
it was running ADMS
clm-5c1efe83c19b43ef
quantitative
across 12 transformer stations, 56 distribution units and 100 smart panels
clm-6663abdeff35574f
quantitative
for roughly a million subscribers along the western coastal strip
clm-6f6019182df05c66
quantitative
and 5,000 of the meters had been installed
clm-6b341c6b77edcb60
descriptive
Buying the control room and the meters in one contract does not make them arrive together.
clm-3af46ee64a69436a
descriptive
Alexandria has the supervisory layer over its grid years before the measurement layer underneath it
clm-d63626b2c1fec751
descriptive
the meters are the half that would locate the losses the loan was signed to reduce
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:5ab4397ffdedc72297858e8ab604db66f714b3f6fd8977c825c93659a9bb85bd
src-b05cca32a5838324Scope: two ADMS for the supervisory and West Alexandria distribution control centres, 300,000 smart meters with AMI hardware and software, Esri GIS; about EUR 50 million; JICA-funded; 30 months' implementation. Part of a ~EUR 150 million programme across AEDC, North Cairo and North Delta.
src-9cff69c01d552bfaPrime-ministerial inspection 7 June 2026 of the West Control Centre in New Borg El Arab: 12 transformer stations, 56 distribution units, 100 smart panels, 50 medium-voltage capacitors, about one million subscribers between km 21 and km 67 of the coastal road; '5,000 smart meters have been installed as part of a 300,000-unit project in western Alexandria'.
src-e3d5663ede4fe481'Electricity Distribution System Improvement Project Alexandria, North Cairo, and North Delta', JICA loan signed 2022-02-10, objective 'Reduce the loss of energy and to improve the reliability and efficiency of the electricity distribution network'.