West Alexandria's Grid Control Centre and the Meters That Have Not Arrived
🤖 AI-generated summary of the sources below · 🔎 Last verified
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
In September 2022 Siemens took a contract of about €50 million, financed by a Japanese ODA loan, to build two advanced distribution management systems for the Alexandria Electricity Distribution Company — one for the West Alexandria region, one to supervise every distribution control centre in the city — plus an Esri geographic information system and 300,000 smart meters, over thirty months. When the prime minister inspected the West centre at New Borg El Arab on 7 June 2026 it was running ADMS and GIS across 12 transformer stations, 56 distribution units and 100 smart panels for roughly a million subscribers along the western coastal strip, and 5,000 of the meters had been installed.
🎓 Lesson
Buying the control room and the meters in one contract does not make them arrive together. Alexandria has the supervisory layer over its grid years before the measurement layer underneath it — and the meters are the half that would locate the losses the loan was signed to reduce.
Sources
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “West Alexandria's Grid Control Centre and the Meters That Have Not Arrived” — Alexandria, Egypt. The Smart City Atlas. https://1001smartcities.org/projects/alexandria-electricity-adms/ (last verified 2026-08-06). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.