Permanent project revision

Green Wave for Cyclists (Grøn Bølge)

Revision 2026-08-26-p1-quality-uplift · effective 2026-08-26

Current revision. This is the snapshot used by the live entity page.

unreviewed

Created the first structured Evidence Passport with 9 claims and 3 source dossiers.

sha256:9d6a20fb1dade0fe780232ea307dc9323c8de393c8d25a7d9d09d60201cdc65f

Change set

  • add /evidencePassport — Added claim-level evidence mapping and source dossiers.
  • add /revisionHistory — Established a permanent, hash-addressed baseline revision.
9
of 9 claims mapped
3
source dossiers
2
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Claims, one by one

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-50aea53873a6df0c quantitative
average cyclist speed rose from about 15 to 20 km/h
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
City evaluation note on the Nørrebrogade and Nørre Farimagsgade green waves: average cyclist speed rose from about 15 km/h to about 20 km/h.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Københavns Kommune — Evaluering af grøn bølge (2013)
Claim 2 clm-eba50f3b6873f476 descriptive
red-light stops fell from as many as six to zero or one
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Same evaluation: stops for red lights fell from up to 6 to 0-1.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Københavns Kommune — Evaluering af grøn bølge (2013)
Claim 3 clm-45d47cb502f6f240 quantitative
A 2026 budget agreement set aside more than DKK 600 million for cycling, the city's largest cycling budget yet
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
City press release on the budget agreement: more than DKK 600 million in total for projects improving Copenhagen as a cycling city, described as the largest amount ever allocated to cycling projects.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Københavns Kommune press release via Ritzau
Claim 4 clm-dae300b94d9447ac quantitative
extends the green wave to 15 more routes
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Press report on the new municipal budget: the system will be extended to 15 additional routes.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. The Cool Down (press, citing The Guardian)
Claim 5 clm-cc91d820b43a11d4 quantitative
Average cyclist speed rose from ~15 to 20 km/h and red-light stops fell from up to six to zero or one on the evaluated corridors
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
City evaluation of the Nørrebrogade and Nørre Farimagsgade waves, the only corridors it covers.
Caveat
The figures cover the two evaluated corridors, not every green wave in the city.

Sources carrying this claim

  1. Københavns Kommune — Evaluering af grøn bølge (2013)
Claim 6 clm-849fbf0c1786820b quantitative
at a cost of ~27–50 seconds of added delay for buses
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Same evaluation: buses suffered significant delays of up to about 27 seconds in one direction and about 50 seconds in the other.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Københavns Kommune — Evaluering af grøn bølge (2013)
Claim 7 clm-54d80c49f3d7e2d3 descriptive
The city's own evaluation found car traffic either unchanged or slightly improved by the green wave
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Same evaluation: for car traffic there is either no change or a small improvement, depending on direction and time of day.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Københavns Kommune — Evaluering af grøn bølge (2013)
Claim 8 clm-f05da02ff697abcf quantitative
buses on the same streets lost up to about 27 seconds in one direction and about 50 in the other
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Same evaluation, which concludes that prioritising cycling can have consequences not only for car traffic but also for bus traffic.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Københavns Kommune — Evaluering af grøn bølge (2013)
Claim 9 clm-a1c81a0a3039195f quantitative
budgeting more than DKK 600 million for cycling in 2026 against a ten-year average of about DKK 160 million a year
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
City press release: over DKK 600 million in the budget agreement, and a fact box giving roughly DKK 160 million a year as the ten-year average allocation for cycling from 2016 to 2025.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Københavns Kommune press release via Ritzau

Source dossiers and revision state

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-08-26-p1-quality-uplift effective 2026-08-26 · created 2026-08-26

Awaiting operator and domain-expert review; publication of this revision implies neither.

Erratum on this revision's envelope. The snapshot, its hash and its permanent link are untouched.

  • createdAt previously read 2026-08-26T20:00:00Z. The batching script that produced this revision advanced createdAt into the future to satisfy the strictly-increasing order the validator requires per entity. The value never recorded a real event; the corrected value is the moment the revision provably existed in the repository. Corrected to 2026-08-26T14:41:50Z on 2026-08-27; evidence: first appears in commit 9d65ace88e, committed 2026-08-26T14:41:50Z.
sha256:9d6a20fb1dade0fe780232ea307dc9323c8de393c8d25a7d9d09d60201cdc65f
9
of 9 claims mapped
3
source dossiers
2
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
City of Copenhagen (Københavns Kommune)
Actor types
city-government
Funding model
Not recorded
Funding description
Not recorded
Cost
Not recorded
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

3 source dossiers

Københavns Kommune — Evaluering af grøn bølge (2013) supercykelstier.dk · 6 linked claims

Open original source ↗

Stable source ID
src-7914ea7062110c65
Publisher
Name not classified · supercykelstier.dk
Type / language
pdf · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-26
Dossier created
2026-08-26
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Official evaluation notat with before/after speed and stop data for the Nørrebrogade/Nørre Farimagsgade green waves.

Descriptive only — not page/paragraph exact
Københavns Kommune press release via Ritzau via.ritzau.dk · 2 linked claims

Open original source ↗

Stable source ID
src-8c4dec48abf468c6
Publisher
Name not classified · via.ritzau.dk
Type / language
web-page · language not classified
Published
2025-09-04
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-26
Dossier created
2026-08-26
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

City statement on the 2026 cycling budget (DKK 602.4m) expanding green waves to 15 streets, quoting Mayor Line Barfod.

Descriptive only — not page/paragraph exact
The Cool Down (press, citing The Guardian) thecooldown.com · 1 linked claim

Open original source ↗

Stable source ID
src-c7e4175079ecf8df
Publisher
Name not classified · thecooldown.com
Type / language
web-page · language not classified
Published
2025-10-17
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-26
Dossier created
2026-08-26
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

October 2025 coverage confirming ongoing operation and the 2025/26 budget expansion.

Descriptive only — not page/paragraph exact
Known limits of this passport
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.