Green Wave for Cyclists (Grøn Bølge)

🤖 AI-generated summary of the sources below · 🔎 Last verified · ◆ 9 sourced claims, none individually verified yet

This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.

How this atlas is made · What “last verified” means · What “source-checked” means · The full record behind this page

Copenhagen times traffic signals on key cycling corridors to a steady 20 km/h so cyclists keeping pace hit consecutive green lights. A city evaluation of the Nørrebrogade and Nørre Farimagsgade waves found average cyclist speed rose from about 15 to 20 km/h and red-light stops fell from as many as six to zero or one — with added delays for buses on the same streets. A 2026 budget agreement set aside more than DKK 600 million for cycling, the city's largest cycling budget yet, and extends the green wave to 15 more routes.

Live 📅 since 2007
Evidence🏛️ Official
what does this mean?The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →
Scale🏙️ City-wide

Sources

↗ Københavns Kommune — Evaluering af grøn bølge (2013)Published 2013Official evaluation notat with before/after speed and stop data for the Nørrebrogade/Nørre Farimagsgade green waves.
↗ Københavns Kommune press release via RitzauPublished 4 September 2025City statement on the 2026 cycling budget (DKK 602.4m) expanding green waves to 15 streets, quoting Mayor Line Barfod.
↗ The Cool Down (press, citing The Guardian)Published 17 October 2025October 2025 coverage confirming ongoing operation and the 2025/26 budget expansion.

📅 How old is the evidence?

Two clocks, kept apart: when this entry’s sources were published, and what has happened to its record in the atlas. Documented span: since 2007. 3 of 3 sources carry a publication date, from 2013 to 17 October 2025.

When the sources were published

  1. Supercykelstier · regional governmentKøbenhavns Kommune — Evaluering af grøn bølge (2013)
  2. Ritzau · platformKøbenhavns Kommune press release via Ritzau
  3. The Cool Down · pressThe Cool Down (press, citing The Guardian)

Every source, with links ↑

What happened to this record

  1. Entered the record
  2. Sources last read

Every revision, permanent →

Show your work What this page rests on and what it can’t tell you · all 9 claims with their sources · the forensic record

Evidence Passport · public beta 9 addressable claims, 3 source dossiers, one permanent baseline. The passport is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.

Inspect the claims, one by one — verbatim text, sources and caveats for all 9

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-50aea53873a6df0c quantitative
average cyclist speed rose from about 15 to 20 km/h
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
City evaluation note on the Nørrebrogade and Nørre Farimagsgade green waves: average cyclist speed rose from about 15 km/h to about 20 km/h.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Københavns Kommune — Evaluering af grøn bølge (2013)
Claim 2 clm-eba50f3b6873f476 descriptive
red-light stops fell from as many as six to zero or one
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Same evaluation: stops for red lights fell from up to 6 to 0-1.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Københavns Kommune — Evaluering af grøn bølge (2013)
Claim 3 clm-45d47cb502f6f240 quantitative
A 2026 budget agreement set aside more than DKK 600 million for cycling, the city's largest cycling budget yet
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
City press release on the budget agreement: more than DKK 600 million in total for projects improving Copenhagen as a cycling city, described as the largest amount ever allocated to cycling projects.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Københavns Kommune press release via Ritzau
Claim 4 clm-dae300b94d9447ac quantitative
extends the green wave to 15 more routes
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Press report on the new municipal budget: the system will be extended to 15 additional routes.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. The Cool Down (press, citing The Guardian)
Claim 5 clm-cc91d820b43a11d4 quantitative
Average cyclist speed rose from ~15 to 20 km/h and red-light stops fell from up to six to zero or one on the evaluated corridors
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
City evaluation of the Nørrebrogade and Nørre Farimagsgade waves, the only corridors it covers.
Caveat
The figures cover the two evaluated corridors, not every green wave in the city.

Sources carrying this claim

  1. Københavns Kommune — Evaluering af grøn bølge (2013)
Claim 6 clm-849fbf0c1786820b quantitative
at a cost of ~27–50 seconds of added delay for buses
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Same evaluation: buses suffered significant delays of up to about 27 seconds in one direction and about 50 seconds in the other.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Københavns Kommune — Evaluering af grøn bølge (2013)
Claim 7 clm-54d80c49f3d7e2d3 descriptive
The city's own evaluation found car traffic either unchanged or slightly improved by the green wave
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Same evaluation: for car traffic there is either no change or a small improvement, depending on direction and time of day.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Københavns Kommune — Evaluering af grøn bølge (2013)
Claim 8 clm-f05da02ff697abcf quantitative
buses on the same streets lost up to about 27 seconds in one direction and about 50 in the other
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Same evaluation, which concludes that prioritising cycling can have consequences not only for car traffic but also for bus traffic.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Københavns Kommune — Evaluering af grøn bølge (2013)
Claim 9 clm-a1c81a0a3039195f quantitative
budgeting more than DKK 600 million for cycling in 2026 against a ten-year average of about DKK 160 million a year
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
City press release: over DKK 600 million in the budget agreement, and a fact box giving roughly DKK 160 million a year as the ten-year average allocation for cycling from 2016 to 2025.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Københavns Kommune press release via Ritzau
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-08-26-p1-quality-uplift effective 2026-08-26 · created 2026-08-26

Awaiting operator and domain-expert review; publication of this revision implies neither.

Erratum on this revision's envelope. The snapshot, its hash and its permanent link are untouched.

  • createdAt previously read 2026-08-26T20:00:00Z. The batching script that produced this revision advanced createdAt into the future to satisfy the strictly-increasing order the validator requires per entity. The value never recorded a real event; the corrected value is the moment the revision provably existed in the repository. Corrected to 2026-08-26T14:41:50Z on 2026-08-27; evidence: first appears in commit 9d65ace88e, committed 2026-08-26T14:41:50Z.
sha256:9d6a20fb1dade0fe780232ea307dc9323c8de393c8d25a7d9d09d60201cdc65f
9
of 9 claims mapped
3
source dossiers
2
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
City of Copenhagen (Københavns Kommune)
Actor types
city-government
Funding model
Not recorded
Funding description
Not recorded
Cost
Not recorded
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

3 source dossiers

Københavns Kommune — Evaluering af grøn bølge (2013) supercykelstier.dk · 6 linked claims

Open original source ↗

Stable source ID
src-7914ea7062110c65
Publisher
Name not classified · supercykelstier.dk
Type / language
pdf · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-26
Dossier created
2026-08-26
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Official evaluation notat with before/after speed and stop data for the Nørrebrogade/Nørre Farimagsgade green waves.

Descriptive only — not page/paragraph exact
Københavns Kommune press release via Ritzau via.ritzau.dk · 2 linked claims

Open original source ↗

Stable source ID
src-8c4dec48abf468c6
Publisher
Name not classified · via.ritzau.dk
Type / language
web-page · language not classified
Published
2025-09-04
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-26
Dossier created
2026-08-26
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

City statement on the 2026 cycling budget (DKK 602.4m) expanding green waves to 15 streets, quoting Mayor Line Barfod.

Descriptive only — not page/paragraph exact
The Cool Down (press, citing The Guardian) thecooldown.com · 1 linked claim

Open original source ↗

Stable source ID
src-c7e4175079ecf8df
Publisher
Name not classified · thecooldown.com
Type / language
web-page · language not classified
Published
2025-10-17
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-26
Dossier created
2026-08-26
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

October 2025 coverage confirming ongoing operation and the 2025/26 budget expansion.

Descriptive only — not page/paragraph exact
Known limits of this passport
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.

Continue exploring

Compare this project

Four cities count cyclists. Only one of them gives the count back.

Counting bicycles is the easy part, and every one of these does it well. The ladder runs from a number nobody acts on to a signal plan that hands the cyclist the green light.

Four cities count cyclists. Only one of them gives the count back. — side-by-side comparison of 4 atlas entries; the "Cost" column honestly shows "not public" where no figure was ever published.
ProjectSinceStatusOutcomeEvidenceRun byCostWhat happens to the count
Plan Vélo Digital Infrastructure MeshParis, 🇫🇷 2021 Live Ongoing Official City government not public Published. Permanent counters feed hourly totals into the open data portal on a rolling window, so anyone can audit whether the new lanes moved anything.
Vivacity AI Traffic-Sensor NetworkLondon, 🇬🇧 2018 Live Ongoing Official City government, Private company not public Classified on the device and the video thrown away — a deliberate privacy design, and a count split across two dozen boroughs that each bought their own.
Traffic Pilot — City-Wide Signal PredictionFrankfurt am Main, 🇩🇪 2022 Live Ongoing Official City government not public Handed back as advice: the app reads live signal phases and tells the rider what speed catches the green wave.
Green Wave for Cyclists (Grøn Bølge)Copenhagen, 🇩🇰 2007 Live Succeeded Official City government not public Built into the signal plan itself. The lights are timed to the cyclist rather than the cyclist to the lights — and the buses on those streets wait for it.

Explore the wider context

📎 Cite this project

1001 Smart Cities (2026). “Green Wave for Cyclists (Grøn Bølge)” — Copenhagen, Denmark. The Smart City Atlas. https://1001smartcities.org/projects/copenhagen-green-wave/ (last verified 2026-08-26). Data: CC BY 4.0.

The underlying data is free to reuse with attribution — see the open data page.

✉️ Get the next source-checked smart-city project in your inbox

One short email a week: the Landmark, one Insight, the new cities. No spam, one-click unsubscribe. About the newsletter · RSS