Permanent project revision

Nukissiorfiit's PULSE Digital Utility Platform

Revision 2026-08-22-evidence-baseline · effective 2026-08-02

Current revision. This is the snapshot used by the live entity page.

unreviewed

Created the first structured Evidence Passport with 8 claims and 4 source dossiers.

sha256:c069519a2c022fe6d1cecca1c49a0e8719bdb7aa1ce53e3aecfe8a165330a57d

Change set

  • add /evidencePassport — Added claim-level evidence mapping and source dossiers.
  • add /revisionHistory — Established a permanent, hash-addressed baseline revision.
8
of 8 claims mapped
4
source dossiers
2
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Claims, one by one

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-8831beec7307a9d8 descriptive
Nukissiorfiit, Greenland's national utility, automated electricity, water and heat metering across the country
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Netcompany's press release calls Nukissiorfiit "Greenland's national utility company." A February 2013 trade article (Engineer Live) describes the Kamstrup rollout as "the most comprehensive multi-utility automatic meter reading system in the world comprising all heat, water and electricity meters in the whole country."
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Netcompany (vendor/press release)
  2. Engineer Live (trade)
Claim 2 clm-199cfad2749301f1 quantitative
with a Kamstrup rollout completed by the early 2010s
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The February 2013 article states Nukissiorfiit was "replacing its entire energy meter fleet with smart meters and an automatic metering system until 2012" (43,000 meters total, 34,000 of them electricity), but also says "The system is currently being rolled out and the implementation takes place sequentially." As of its own Feb 2013 publication date, the article confirms a 2012 completion target, not an already-finished rollout.
Caveat
The only listed source on the rollout is dated February 2013 and describes it as still in progress toward a 2012 target; it does not state the rollout was actually finished, so "completed by the early 2010s" is an inference from that target date rather than a confirmed fact.

Sources carrying this claim

  1. Engineer Live (trade)
Claim 3 clm-1ca9f3e65bfb0199 quantitative
In July 2024 it partnered with Netcompany to build PULSE
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The press release, dated 2 July 2024, states: "Greenland's utility company, Nukissiorfiit, has chosen Netcompany as its digital transformation partner," to build the modular PULSE platform.
Caveat
This source — and every other source listed on this entry — describes PULSE only as a partnership signed in July 2024 to build a platform that "will function as the digital control tower" (future tense). None of the listed sources confirm PULSE has since gone into operation for Nukissiorfiit.

Sources carrying this claim

  1. Netcompany (vendor/press release)
Claim 4 clm-4715a624f613e35a descriptive
a vendor-neutral platform for real-time consumption data
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The same release states: "Nukissiorfiit acquires a vendor-neutral and legacy-free digital ecosystem with full ownership," which "will function as the digital control tower, collecting and organising real-time data on customers' water, heat, and electricity consumption."
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Netcompany (vendor/press release)
Claim 5 clm-2259bf6071510208 quantitative
across the 17 towns and 54 settlements it serves
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Wikipedia states Nukissiorfiit "serves 56,000" residents across "17 towns and 54 settlements in Greenland." This contradicts the Netcompany press release, the only other listed source giving a settlement count, which states: "Nukissiorfiit's supply obligations cover 17 towns and 53 settlements" — one settlement fewer.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Wikipedia — Nukissiorfiit
Claim 6 clm-b549517647b9fb83 quantitative
The utility already draws 72% of its power from renewables
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Wikipedia's opening summary states Nukissiorfiit "currently generates 72% of its total energy from renewable resources, such as hydropower."
Caveat
This figure rests solely on Wikipedia, a tertiary reference. No source from Nukissiorfiit itself, or from an independent auditor, appears in this entry's source list to confirm the 72% figure.

Sources carrying this claim

  1. Wikipedia — Nukissiorfiit
Claim 7 clm-556d1710e8ed93c8 descriptive
mainly Buksefjord hydro near Nuuk
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Wikipedia lists a "Buksefjord hydroelectric power plant" serving "Nuuk" with "45 MW" capacity (opened 1993) — the largest of five named hydro plants in the article (Tasiilaq 1.2 MW, Qorlortorsuaq 7.6 MW, Sisimiut 15 MW, Ilulissat 22.5 MW).
Caveat
Wikipedia lists Buksefjord as one of five named hydro plants, the largest by capacity, but does not itself state it is the main contributor to the nationwide 72% renewable figure — the "mainly" framing is an inference from its capacity ranking, not a statement in the source.

Sources carrying this claim

  1. Wikipedia — Nukissiorfiit
Claim 8 clm-cc0622e2300bd12d quantitative
targets a fossil-free supply by 2030
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Wikipedia states Nukissiorfiit is on a "planning track to achieve a completely fossil-free 100% green energy infrastructure by the year 2030."
Caveat
This target is sourced only to Wikipedia; no operator strategy document or press release in this entry's source list states a 2030 target.

Sources carrying this claim

  1. Wikipedia — Nukissiorfiit

Source dossiers and revision state

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-08-22-evidence-baseline effective 2026-08-02 · created 2026-08-22

Awaiting operator and domain-expert review; publication of this revision implies neither.

sha256:c069519a2c022fe6d1cecca1c49a0e8719bdb7aa1ce53e3aecfe8a165330a57d
8
of 8 claims mapped
4
source dossiers
2
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
Nukissiorfiit (Greenland's state-owned national utility)
Actor types
utility
Funding model
public
Funding description
Not recorded
Cost
Not recorded
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

4 source dossiers

Nukissiorfiit (operator) nukissiorfiit.gl · background

Open original source ↗

Stable source ID
src-753589c9f9cb2125
Publisher
Name not classified · nukissiorfiit.gl
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-02
Dossier created
2026-08-22
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Official utility site.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Netcompany (vendor/press release) netcompany.com · 3 linked claims

Open original source ↗

Stable source ID
src-8d47e700d3a98928
Publisher
Name not classified · netcompany.com
Type / language
web-page · language not classified
Published
2024-07-02
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-02
Dossier created
2026-08-22
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

July 2024 announcement of the PULSE digital-ecosystem partnership; confirms 17 towns/53-54 settlements coverage.

Descriptive only — not page/paragraph exact
Engineer Live (trade) engineerlive.com · 2 linked claims

Open original source ↗

Stable source ID
src-1eb8b78885a00c3c
Publisher
Name not classified · engineerlive.com
Type / language
web-page · language not classified
Published
2013-02-21
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-02
Dossier created
2026-08-22
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

2013 trade-press account of the original 43,000-meter Kamstrup automatic meter reading rollout.

Descriptive only — not page/paragraph exact
Wikipedia — Nukissiorfiit en.wikipedia.org · 4 linked claims

Open original source ↗

Stable source ID
src-8189af8e28cc26ab
Publisher
Name not classified · en.wikipedia.org
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-02
Dossier created
2026-08-22
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Reference confirming 72% renewable share, Buksefjord plant, service area and 2030 fossil-free target.

Descriptive only — not page/paragraph exact
Known limits of this passport
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.