Lagos Blue Line Rail

Revision 2026-08-20-evidence-baseline · effective 2026-07-26

Current revision. This is the snapshot used by the live entity page.

unreviewed

Created the first structured Evidence Passport with 5 claims and 11 source dossiers.

sha256:a3f377792908a07978f89d85af423f02f50c6411a1504cec5997b91f36054936

Change set

  • add /evidencePassport — Added claim-level evidence mapping and source dossiers.
  • add /revisionHistory — Established a permanent, hash-addressed baseline revision.
5
of 5 claims mapped
11
source dossiers
8
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Claims, one by one

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-97f1df626e722931 quantitative
Railways sat on Nigeria's exclusive federal list for most of that build; a March 2023 constitutional amendment moved them to the concurrent list
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The legislative analysis covers the constitutional alteration that moved railways off the exclusive list, which is the change the entry dates to March 2023.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. PLAC (legislative analysis)
Claim 2 clm-6bc65f3e203cd3ea quantitative
the federal Nigerian Railway Corporation granted LAMATA a 15-year operating licence covering the Blue and Red Lines only in June 2026, nearly three years after service began
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The 30 June 2026 report announces the operating licence granted to LAMATA covering the Blue and Red Lines.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. New Dawn Nigeria (press)
Claim 3 clm-c5e3ffd198e12c1b quantitative
LAMATA said the plant was in testing in March 2024; no later confirmation of commissioning was found
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The operator's own March 2024 post announces the test of the independent power plant; nothing later on the operator's site confirms commissioning.
Caveat
Negative evidence for the second half: an absence of confirmation cannot be quoted.

Sources carrying this claim

  1. LAMATA (operator)
Claim 4 clm-8a8f8926b8ddc112 quantitative
Lagos State Commissioner for Transportation Oluwaseun Osiyemi reported 3.5 million passengers in 2025 and daily ridership of about 15,000 (May 2026)
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The May 2026 headline carries both figures, attributed to the state commissioner.
Caveat
Government figures relayed by the press; the entry says plainly that no independent audit was found.

Sources carrying this claim

  1. Premium Times via allAfrica (press)
Claim 5 clm-c9dd9252f1da21e1 quantitative
builder CCECC put cumulative ridership above 8 million in more than 1,000 days of operation (July 2026)
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The July 2026 report carries the cumulative figure alongside the Phase II construction milestone.
Caveat
Contractor figures relayed by the press.

Sources carrying this claim

  1. Nairametrics (press)

Source dossiers and revision state

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-08-20-evidence-baseline effective 2026-07-26 · created 2026-08-20

Awaiting operator and domain-expert review; publication of this revision implies neither.

sha256:a3f377792908a07978f89d85af423f02f50c6411a1504cec5997b91f36054936
5
of 5 claims mapped
11
source dossiers
8
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
Lagos Metropolitan Area Transport Authority (LAMATA); built by CCECC Nigeria, which describes itself as also operating the line
Actor types
utility, private
Funding model
public
Funding description
Not recorded
Cost
Not recorded
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

11 source dossiers

LAMATA (operator) lamata-ng.com · 1 linked claim

Open original source ↗

Stable source ID
src-25a2506c9a7a1a05
Publisher
Name not classified · lamata-ng.com
Type / language
web-page · language not classified
Published
2024-03-13
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Fetched OK. Verifies the power architecture sentence by sentence: grid supply via EKEDC Ijora and Akangba substations, six substations along the corridor, a diesel rotary UPS backup described as the second of its type in Nigeria, and that the plant was in testing in March 2024. States no capacity in MW.

Descriptive only — not page/paragraph exact
LAMATA Blue Line timetable (operator) lamata-ng.com · background

Open original source ↗

Stable source ID
src-58ef2759dc228eff
Publisher
Name not classified · lamata-ng.com
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Fetched OK. Current published timetable: Monday to Saturday, 05:30 to 21:50, 102 trips advertised daily, 8 to 12 minutes at peak. Page carries no revision date; a real-time tracking claim on the page was not verified.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
LAMATA Train Services (operator) lamata-ng.com · background

Open original source ↗

Stable source ID
src-c7097e6b0de0ec74
Publisher
Name not classified · lamata-ng.com
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Fetched OK. Source of the design-capacity figures: the full 27 km, thirteen-station line was designed for 400,000 daily passengers rising to 700,000. Also describes a 25-year concession model for rolling stock, operations and maintenance.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Nairametrics (press) nairametrics.com · background

Open original source ↗

Stable source ID
src-5ebe02f6a7f1cd0f
Publisher
Name not classified · nairametrics.com
Type / language
web-page · language not classified
Published
2024-03-15
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Fetched OK. Independent confirmation of the three-tier power arrangement and the Viathan, Advad and Lampturnkey consortium; says the plant was in the testing phase. A BusinessDay headline puts the plant at 18 MW but that article returned HTTP 403 on two attempts, so the figure is not used.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Premium Times via allAfrica (press) allafrica.com · 1 linked claim

Open original source ↗

Stable source ID
src-f184259564279b07
Publisher
Name not classified · allafrica.com
Type / language
web-page · language not classified
Published
2026-05-12
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Fetched OK via the allAfrica syndication; the original premiumtimesng.com URL returned an empty body. Verifies 3.5 million passengers in 2025, about 15,000 daily riders, and the 57 to 72 to 90 trip progression, attributed to Commissioner Oluwaseun Osiyemi at the 12 May 2026 ministerial briefing.

Descriptive only — not page/paragraph exact
Nairametrics (press) nairametrics.com · 1 linked claim

Open original source ↗

Stable source ID
src-81956993f26b6e13
Publisher
Name not classified · nairametrics.com
Type / language
web-page · language not classified
Published
2026-07-16
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Fetched OK. Currency check, 16 July 2026: over 8 million passengers in more than 1,000 days; Phase II first precast T-beam installed on the 14 km, six-station Mile 2 to Okokomaiko extension. The claim that CCECC built and operates the line is CCECC's own, made on its official channel.

Descriptive only — not page/paragraph exact
New Dawn Nigeria (press) newdawnngr.com · 1 linked claim

Open original source ↗

Stable source ID
src-3c1575d59040c24e
Publisher
Name not classified · newdawnngr.com
Type / language
web-page · language not classified
Published
2026-06-30
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Fetched OK. Verifies the federal licence: 30 June 2026, 15-year validity, covering the Red Line, the Blue Line and future LAMATA corridors, with only a Government Inspector of Railways inspection needed for new corridors. Also gives 94 daily Blue Line trips.

Descriptive only — not page/paragraph exact
PLAC (legislative analysis) placng.org · 1 linked claim

Open original source ↗

Stable source ID
src-1b2d524c47491642
Publisher
Name not classified · placng.org
Type / language
web-page · language not classified
Published
2023-04-06
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Fetched OK. Verifies that the Fifth Alteration (No. 32) Act, assented March 2023, moved railways from the exclusive to the concurrent legislative list and empowered states to establish, operate and maintain a state railway carrier.

Descriptive only — not page/paragraph exact
Railway Technology (trade press) railway-technology.com · background

Open original source ↗

Stable source ID
src-508b508ddd5ee9d8
Publisher
Name not classified · railway-technology.com
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Fetched OK. Project description naming CCECC as builder and listing an operations control centre, SCADA and ATP with in-cab signalling — written in future tense before opening, so treated as planned rather than confirmed delivered. Its cost estimates conflict with state figures and are not used.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Punch (press) punchng.com · background

Open original source ↗

Stable source ID
src-ac8324b91b5ca4d0
Publisher
Name not classified · punchng.com
Type / language
web-page · language not classified
Published
2025-06-08
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Fetched OK. 8 June 2025: three new four-car trainsets commissioned, with Governor Sanwo-Olu saying the addition doubles Blue Line passenger capacity — the basis for treating rolling stock, not infrastructure, as the constraint on service.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Wikipedia (reference) en.wikipedia.org · background

Open original source ↗

Stable source ID
src-3a92da2eca816cc2
Publisher
Name not classified · en.wikipedia.org
Type / language
web-page · language not classified
Published
2023-09-04
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Fetched OK. Used only for uncontroversial route facts: 4 September 2023 opening, the five phase-one stations, 27 km full length, CRRC Dalian Class 210 rolling stock. Its fleet count of 15 sets appears to be the order rather than sets in service and is not used.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Known limits of this passport
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.