Permanent project revision

Sharing Cities — Greenwich Smart District

Revision 2026-10-14-baseline · effective 2026-10-14

Current revision. This is the snapshot used by the live entity page.

unreviewed

Created the first structured Evidence Passport with 15 claims and 6 source dossiers.

sha256:d210a5b13ddc325194be8f4eac001f9cfbe50f3eb963c16bb981cc8773a57731

Change set

  • add /evidencePassport — Added claim-level evidence mapping and source dossiers.
  • add /revisionHistory — Established a permanent, hash-addressed baseline revision.
15
of 15 claims mapped
6
source dossiers
2
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Claims, one by one

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-a2a6ed9fe26830b3 descriptive
Royal Borough of Greenwich was London's demonstrator in Sharing Cities
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The mayoral decision names the Royal Borough of Greenwich as London's demonstrator area.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Greater London Authority — MD1574 (authority)
  2. Sharing Cities consortium (project)
Claim 2 clm-4f1c0f3444184db1 quantitative
an EU Horizon 2020 smart-district project (2016–2021) alongside Milan and Lisbon
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The decision names London, Milan and Lisbon as lead cities and a January 2016 start; the final appraisal was submitted in December 2021.
Caveat
The 2015 decision planned closure in January 2020; the programme ran to the end of 2021.

Sources carrying this claim

  1. Greater London Authority — MD1574 (authority)
  2. Sharing Cities D8.7: final economic, social and environmental appraisal, by Imperial College London (Dec 2021)
Claim 3 clm-fd5bcd9f2c6c0dd8 descriptive
Greenwich retrofitted two social-housing estates
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The retrofit case study and the final appraisal describe works at the Ernest Dence and Flamsteed estates, both council social housing.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Sharing Cities D3.2: case study of building retrofit (16 Dec 2019)
  2. Sharing Cities D8.7: final economic, social and environmental appraisal, by Imperial College London (Dec 2021)
Claim 4 clm-d4d4f8c29b502662 descriptive
adding solar panels on one and an electric heat pump with a back-up gas boiler on the other
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The monitoring report lists solar panels at Flamsteed and, at Ernest Dence, an electric heat pump with a back-up new gas boiler and thermal storage.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Sharing Cities D8.5: monitoring programme analysis report, by Imperial College London (Jun 2020)
Claim 5 clm-35f3cc69a178019b descriptive
built EV charging into street lampposts
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The appraisal says Greenwich trialled lamppost charging points deployed by Ubitricity; the consortium page counts 30 lamp-post charging points.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Sharing Cities D8.7: final economic, social and environmental appraisal, by Imperial College London (Dec 2021)
  2. Sharing Cities consortium (project)
Claim 6 clm-b6c36a6fdb5ac67c descriptive
added smart-parking sensors, an e-bike loan scheme and an energy-management system
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The appraisal describes smart-parking sensors in 46 bays, the e-bike loan scheme and the energy-management system at Ernest Dence; the consortium page describes the same measures.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Sharing Cities D8.7: final economic, social and environmental appraisal, by Imperial College London (Dec 2021)
  2. Sharing Cities consortium (project)
Claim 7 clm-85c94713814b2721 quantitative
Programme funding was about €25m.
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The decision accepts an EU grant of €24,988,759 for the whole three-city consortium.
Caveat
The figure covers all three cities, not Greenwich alone.

Sources carrying this claim

  1. Greater London Authority — MD1574 (authority)
Claim 8 clm-1c4d4bcf49150c20 descriptive
estimated from building models calibrated on pre-retrofit metering, rather than from measured post-retrofit data
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The appraisal says the impacts at Ernest Dence were evaluated with an EnergyPlus model built from boiler monitoring in 2018–2020, comparing scenarios under identical weather.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Sharing Cities D8.7: final economic, social and environmental appraisal, by Imperial College London (Dec 2021)
Claim 9 clm-d97b0844636da85f quantitative
the heat pump at the Ernest Dence estate would cut heating emissions by 47% while raising running costs by 19%
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The appraisal estimates a 47% saving in emissions from heating and hot water and a 19% increase in operational cost from the switch to the heat pump.
Caveat
A modelled estimate using the 2018 grid carbon intensity; the appraisal expects the saving to grow as the grid decarbonises.

Sources carrying this claim

  1. Sharing Cities D8.7: final economic, social and environmental appraisal, by Imperial College London (Dec 2021)
Claim 10 clm-e2572da30387f890 descriptive
Its energy-management system met the same trade-off: run to minimise cost, it favoured the gas boiler and its modelled emissions rose rather than fell.
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The appraisal's scenarios give 203 tonnes of CO2 a year for the baseline and 371 to 381 tonnes under cost-minimising strategies, which it characterises as boiler-led.
Caveat
These are case studies of the system's behaviour, not a record of how it was run.

Sources carrying this claim

  1. Sharing Cities D8.7: final economic, social and environmental appraisal, by Imperial College London (Dec 2021)
Claim 11 clm-5eeb0f112036aaed quantitative
The lamppost chargers delivered 22,812 kWh between October 2018 and August 2021, with hourly utilisation under 25%.
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The appraisal reports over 7,000 hours of charging and 22,812 kWh from October 2018 to August 2021, with hourly utilisation rates below 25%.
Caveat
The appraisal also finds that 40% of charging events kept the plug in far longer than the car was charging.

Sources carrying this claim

  1. Sharing Cities D8.7: final economic, social and environmental appraisal, by Imperial College London (Dec 2021)
Claim 12 clm-07ae551915c7a05e quantitative
London's 2015 approval foresaw retrofits of 362 properties and up to 300 smart-parking places
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The decision's expected outputs include retrofitting low-carbon solutions to 362 properties and development of up to 300 smart-parking places.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Greater London Authority — MD1574 (authority)
Claim 13 clm-bc1042b447b44545 quantitative
the final appraisal covers two estates of 95 and 172 dwellings and sensors in 46 bays
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The retrofit case study gives 95 dwellings at Ernest Dence and 172 at Flamsteed; the final appraisal counts smart-parking sensors in 46 bays.
Caveat
The consortium's own London page counts 93 smart parking bays; the appraisal's 46 is the evaluated set.

Sources carrying this claim

  1. Sharing Cities D3.2: case study of building retrofit (16 Dec 2019)
  2. Sharing Cities D8.7: final economic, social and environmental appraisal, by Imperial College London (Dec 2021)
Claim 15 clm-316206ef17bd71b8 descriptive
without storage, the evaluators found, choosing between cost and carbon came down to running the boiler or the heat pump
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this file
What the mapping says
The appraisal concludes that, due to a lack of alternative storage options, minimising cost or CO2 came down to a boiler-led or a heat-pump-led strategy.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Sharing Cities D8.7: final economic, social and environmental appraisal, by Imperial College London (Dec 2021)

Source dossiers and revision state

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-10-14-baseline effective 2026-10-14 · created 2026-10-14

Awaiting operator and domain-expert review; publication of this revision implies neither.

sha256:d210a5b13ddc325194be8f4eac001f9cfbe50f3eb963c16bb981cc8773a57731
15
of 15 claims mapped
6
source dossiers
2
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
Digital Greenwich (Royal Borough of Greenwich)
Actor types
city-government
Funding model
grant
Funding description
EU Horizon 2020, ~€25m programme (London, Milan, Lisbon)
Cost
Not recorded
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

6 source dossiers

Sharing Cities consortium (project) sharingcities.eu · 3 linked claims

Open original source ↗

Stable source ID
src-f3276e4fca782c60
Publisher
Name not classified · sharingcities.eu
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-10-14
Dossier created
2026-10-14
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

The consortium's London page: Greenwich as demonstration area; LED lamp posts with EV charging and parking sensors, e-bike loan scheme, Energy Hero digital social market and urban sharing platform; headline figures including 757 tCO2 a year saved, 30 lamp-post charging points and 400 smart lamp posts, given without a method.

Descriptive only — not page/paragraph exact
Greater London Authority — MD1574 (authority) london.gov.uk · 4 linked claims

Open original source ↗

Stable source ID
src-d75f84baac797775
Publisher
Name not classified · london.gov.uk
Type / language
web-page · language not classified
Published
2015-12-16
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-10-14
Dossier created
2026-10-14
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Mayoral decision accepting a €24,988,759 EU grant for the GLA-led consortium; London plan: retrofit of 362 properties saving 607 tCO2 a year, up to 300 smart-parking places, 400 smart lampposts, 30 e-bikes with four docking stations.

Descriptive only — not page/paragraph exact
Digital Greenwich (operator) digitalgreenwich.com · background

Open original source ↗

Stable source ID
src-737ad4cd07669867
Publisher
Name not classified · digitalgreenwich.com
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-10-14
Dossier created
2026-10-14
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

The borough's smart-city unit's page on its Sharing Cities measures.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Sharing Cities D8.7: final economic, social and environmental appraisal, by Imperial College London (Dec 2021) ec.europa.eu · 11 linked claims

Open original source ↗

Stable source ID
src-469033c9a2bbb1b0
Publisher
Name not classified · ec.europa.eu
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-10-14
Dossier created
2026-10-14
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Final appraisal by Imperial College London (WP8 lead): Ernest Dence heat pump modelled at 47% lower heating emissions and 19% higher running cost; energy-management scenarios trade cost against CO2; lamppost chargers delivered 22,812 kWh in October 2018 to August 2021 at under 25% hourly utilisation; smart-parking sensors in 46 bays.

Descriptive only — not page/paragraph exact
Sharing Cities D8.5: monitoring programme analysis report, by Imperial College London (Jun 2020) ec.europa.eu · 1 linked claim

Open original source ↗

Stable source ID
src-fb071cee8ed5aa7f
Publisher
Name not classified · ec.europa.eu
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-10-14
Dossier created
2026-10-14
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Interim monitoring report by Imperial College London: measures at Flamsteed (wall insulation, windows, solar panels) and at Ernest Dence (roof insulation, LED lighting, electric heat pump with a back-up gas boiler and thermal storage).

Descriptive only — not page/paragraph exact
Sharing Cities D3.2: case study of building retrofit (16 Dec 2019) ec.europa.eu · 2 linked claims

Open original source ↗

Stable source ID
src-c900e269c5e81dd7
Publisher
Name not classified · ec.europa.eu
Type / language
web-page · language not classified
Published
2019-12-16
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-10-14
Dossier created
2026-10-14
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Retrofit case study: Ernest Dence has 95 dwellings in three blocks and Flamsteed 172 in nine; drawing water from the Thames for a water-source heat pump proved unfeasible because of the river's tidal range.

Descriptive only — not page/paragraph exact
Known limits of this file
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.