Permanent project revision

Masdar City

Revision 2026-08-20-source-dates-r2 · effective 2026-08-15

Current revision. This is the snapshot used by the live entity page.

unreviewed

Record the publication date of each source that states one; sources that publish no date are marked null.

sha256:f9d3cee8ec90765824feee3230976157538d357d38a383f2b32dd26a982937a8

Change set

  • replace /snapshot/projectFingerprint — Updated projectFingerprint to the current sourced project record.
1
of 1 claims mapped
5
source dossiers
4
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Claims, one by one

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-4d607cf5936b11f4 descriptive
short-lived driverless PRT pods
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The National reports that the cost review which cut Masdar City's price tag to $16bn achieved its savings by abandoning 'a costly pod transit system', along with the raised podium design and the plan to install solar panels on all roofs. The citywide pod network was therefore dropped from the plan two years after launch; the short demonstration line that was built is what remained of it.
Caveat
The article dates the decision, not the closure of the line that was built. It is a newspaper report of a company briefing, not a Masdar document.

Sources carrying this claim

  1. The National (press) — Masdar City clips another $2.5bn from price tag, 1 December 2010

Source dossiers and revision state

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-08-20-source-dates-r2 effective 2026-08-15 · created 2026-08-20

Awaiting operator and domain-expert review; publication of this revision implies neither.

sha256:f9d3cee8ec90765824feee3230976157538d357d38a383f2b32dd26a982937a8
1
of 1 claims mapped
5
source dossiers
4
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
Masdar City
Actor types
utility
Funding model
Not recorded
Funding description
Not recorded
Cost
Announced in 2008 at US$22 billion. Masdar cut the estimate twice during 2010 — first by 10–15%, then by a further $2.5bn to $16bn, a total fall of $6bn or 27% — by dropping the raised podium design, rooftop solar across all buildings and the driverless pod transit system. No account of what was actually spent has been published, and only a fraction of the masterplan was built.
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

5 source dossiers

Masdar City (operator) masdarcity.ae · background

Open original source ↗

Stable source ID
src-797a8b834edaab02
Publisher
Name not classified · masdarcity.ae
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-15
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Official site of the organisation running the project.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
CNN / The Conversation (press) cnn.com · background

Open original source ↗

Stable source ID
src-5047e7f32bc1e76e
Publisher
Name not classified · cnn.com
Type / language
web-page · language not classified
Published
2016-09-30
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-15
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

News coverage of the project and its ambitions.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Centre for Public Impact (research) centreforpublicimpact.org · background

Open original source ↗

Stable source ID
src-afbfbd5f3671d686
Publisher
Name not classified · centreforpublicimpact.org
Type / language
web-page · language not classified
Published
2018-06-20
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-15
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Case study documenting the scaled-back targets and slow build-out.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
The National (press) — Masdar City clips another $2.5bn from price tag, 1 December 2010 thenationalnews.com · 1 linked claim

Open original source ↗

Stable source ID
src-5dd5f18c6963b972
Publisher
Name not classified · thenationalnews.com
Type / language
web-page · language not classified
Published
2010-12-01
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-15
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
No locator recordedDescriptive only — not page/paragraph exact
The National (press) — completion pushed back, total cost falls, 10 October 2010 thenationalnews.com · background

Open original source ↗

Stable source ID
src-f28d04a94256186a
Publisher
Name not classified · thenationalnews.com
Type / language
web-page · language not classified
Published
2010-10-10
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-15
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
No locator recordedDescriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Known limits of this passport
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.