{
 "schemaVersion": "1.0.0",
 "constitutionVersion": "1.0.0",
 "createdAt": "2026-08-12T00:00:00Z",
 "description": "Append-only Evidence Passport records. Old revisions are immutable; corrections create a new revision and preserve the previous permalink.",
 "entity": {
  "type": "project",
  "id": "masdar-city",
  "title": "Masdar City",
  "canonicalUrl": "https://1001smartcities.org/projects/masdar-city/"
 },
 "currentRevisionId": "2026-08-20-source-dates-r2",
 "revisions": [
  {
   "id": "2026-08-15-cost-baseline",
   "createdAt": "2026-08-15T00:00:00Z",
   "effectiveAt": "2026-08-15",
   "changeType": "baseline",
   "summary": "Created the first structured Evidence Passport with 1 claim and 5 source dossiers.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "add",
     "path": "/evidencePassport",
     "summary": "Added claim-level evidence mapping and source dossiers."
    },
    {
     "operation": "add",
     "path": "/revisionHistory",
     "summary": "Established a permanent, hash-addressed baseline revision."
    }
   ],
   "snapshotHash": "sha256:47b66c5bb78c81ed7a346fd615f7df83a67439e4cdea6b511a270bef71461f48",
   "snapshot": {
    "asOf": "2026-08-15",
    "projectFingerprint": "sha256:654a19d3af6cfb42162550a9dfac9cb3526d8ee9e2f4aa951ac32a1674ce6aab",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "live",
     "outcome": "scaled-back",
     "evidenceGrade": "independent",
     "timeline": {
      "started": 2008,
      "ended": null
     }
    },
    "governance": {
     "operator": "Masdar City",
     "actorTypes": [
      "utility"
     ],
     "fundingModel": null,
     "fundingDescription": null,
     "cost": "Announced in 2008 at US$22 billion. Masdar cut the estimate twice during 2010 — first by 10–15%, then by a further $2.5bn to $16bn, a total fall of $6bn or 27% — by dropping the raised podium design, rooftop solar across all buildings and the driverless pod transit system. No account of what was actually spent has been published, and only a fraction of the masterplan was built.",
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-4d607cf5936b11f4",
      "field": "snippet",
      "text": "short-lived driverless PRT pods",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-5dd5f18c6963b972"
      ],
      "supportNote": "The National reports that the cost review which cut Masdar City's price tag to $16bn achieved its savings by abandoning 'a costly pod transit system', along with the raised podium design and the plan to install solar panels on all roofs. The citywide pod network was therefore dropped from the plan two years after launch; the short demonstration line that was built is what remained of it.",
      "caveat": "The article dates the decision, not the closure of the line that was built. It is a newspaper report of a company briefing, not a Masdar document.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-797a8b834edaab02",
      "title": "Masdar City (operator)",
      "url": "https://masdarcity.ae/",
      "publisher": {
       "name": null,
       "domain": "masdarcity.ae",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-15",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Official site of the organisation running the project.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-5047e7f32bc1e76e",
      "title": "CNN / The Conversation (press)",
      "url": "https://www.cnn.com/style/article/conversation-masdar-city-lee",
      "publisher": {
       "name": null,
       "domain": "cnn.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-15",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "News coverage of the project and its ambitions.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-afbfbd5f3671d686",
      "title": "Centre for Public Impact (research)",
      "url": "https://centreforpublicimpact.org/public-impact-fundamentals/masdar-city-in-abu-dhabi/",
      "publisher": {
       "name": null,
       "domain": "centreforpublicimpact.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-15",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Case study documenting the scaled-back targets and slow build-out.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-5dd5f18c6963b972",
      "title": "The National (press) — Masdar City clips another $2.5bn from price tag, 1 December 2010",
      "url": "https://www.thenationalnews.com/business/masdar-city-clips-another-2-5bn-from-price-tag-1.535641",
      "publisher": {
       "name": null,
       "domain": "thenationalnews.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-4d607cf5936b11f4"
      ],
      "temporal": {
       "publishedAt": "2010-12-01",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-15",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "not-recorded",
       "value": null,
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-f28d04a94256186a",
      "title": "The National (press) — completion pushed back, total cost falls, 10 October 2010",
      "url": "https://www.thenationalnews.com/uae/environment/masdar-city-completion-pushed-back-but-total-cost-falls-1.532529/",
      "publisher": {
       "name": null,
       "domain": "thenationalnews.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2010-10-10",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-15",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "not-recorded",
       "value": null,
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 1,
     "claimsMapped": 1,
     "sourcesTotal": 5,
     "sourcesUsedByClaims": 1,
     "sourcesWithPublicationDate": 2,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  },
  {
   "id": "2026-08-20-source-dates-b3",
   "createdAt": "2026-08-20T18:00:00Z",
   "effectiveAt": "2026-08-15",
   "changeType": "update",
   "summary": "Record the publication date of each source that states one; sources that publish no date are marked null.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "replace",
     "path": "/snapshot/projectFingerprint",
     "summary": "Updated projectFingerprint to the current sourced project record."
    },
    {
     "operation": "replace",
     "path": "/snapshot/sources",
     "summary": "Updated sources to the current sourced project record."
    }
   ],
   "snapshotHash": "sha256:de23e5f04e3dc6ad9105262551238c11a776875bf47316b381e156234ebb0157",
   "snapshot": {
    "asOf": "2026-08-15",
    "projectFingerprint": "sha256:87c88341fd3bd96cd6891955f5f38a832f6ddd3f72ae689e7d14d58049d93bd6",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "live",
     "outcome": "scaled-back",
     "evidenceGrade": "independent",
     "timeline": {
      "started": 2008,
      "ended": null
     }
    },
    "governance": {
     "operator": "Masdar City",
     "actorTypes": [
      "utility"
     ],
     "fundingModel": null,
     "fundingDescription": null,
     "cost": "Announced in 2008 at US$22 billion. Masdar cut the estimate twice during 2010 — first by 10–15%, then by a further $2.5bn to $16bn, a total fall of $6bn or 27% — by dropping the raised podium design, rooftop solar across all buildings and the driverless pod transit system. No account of what was actually spent has been published, and only a fraction of the masterplan was built.",
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-4d607cf5936b11f4",
      "field": "snippet",
      "text": "short-lived driverless PRT pods",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-5dd5f18c6963b972"
      ],
      "supportNote": "The National reports that the cost review which cut Masdar City's price tag to $16bn achieved its savings by abandoning 'a costly pod transit system', along with the raised podium design and the plan to install solar panels on all roofs. The citywide pod network was therefore dropped from the plan two years after launch; the short demonstration line that was built is what remained of it.",
      "caveat": "The article dates the decision, not the closure of the line that was built. It is a newspaper report of a company briefing, not a Masdar document.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-797a8b834edaab02",
      "title": "Masdar City (operator)",
      "url": "https://masdarcity.ae/",
      "publisher": {
       "name": null,
       "domain": "masdarcity.ae",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Official site of the organisation running the project.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-5047e7f32bc1e76e",
      "title": "CNN / The Conversation (press)",
      "url": "https://www.cnn.com/style/article/conversation-masdar-city-lee",
      "publisher": {
       "name": null,
       "domain": "cnn.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2016-09-30",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "News coverage of the project and its ambitions.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-afbfbd5f3671d686",
      "title": "Centre for Public Impact (research)",
      "url": "https://centreforpublicimpact.org/public-impact-fundamentals/masdar-city-in-abu-dhabi/",
      "publisher": {
       "name": null,
       "domain": "centreforpublicimpact.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2018-06-20",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Case study documenting the scaled-back targets and slow build-out.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-5dd5f18c6963b972",
      "title": "The National (press) — Masdar City clips another $2.5bn from price tag, 1 December 2010",
      "url": "https://www.thenationalnews.com/business/masdar-city-clips-another-2-5bn-from-price-tag-1.535641",
      "publisher": {
       "name": null,
       "domain": "thenationalnews.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-4d607cf5936b11f4"
      ],
      "temporal": {
       "publishedAt": "2010-12-01",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "not-recorded",
       "value": null,
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-f28d04a94256186a",
      "title": "The National (press) — completion pushed back, total cost falls, 10 October 2010",
      "url": "https://www.thenationalnews.com/uae/environment/masdar-city-completion-pushed-back-but-total-cost-falls-1.532529/",
      "publisher": {
       "name": null,
       "domain": "thenationalnews.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2010-10-10",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "not-recorded",
       "value": null,
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 1,
     "claimsMapped": 1,
     "sourcesTotal": 5,
     "sourcesUsedByClaims": 1,
     "sourcesWithPublicationDate": 4,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  },
  {
   "id": "2026-08-20-source-dates-r2",
   "createdAt": "2026-08-20T20:00:00Z",
   "effectiveAt": "2026-08-15",
   "changeType": "update",
   "summary": "Record the publication date of each source that states one; sources that publish no date are marked null.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "replace",
     "path": "/snapshot/projectFingerprint",
     "summary": "Updated projectFingerprint to the current sourced project record."
    }
   ],
   "snapshotHash": "sha256:f9d3cee8ec90765824feee3230976157538d357d38a383f2b32dd26a982937a8",
   "snapshot": {
    "asOf": "2026-08-15",
    "projectFingerprint": "sha256:0ac943d531be496e23b7aad061e62433bfcd3f1ff2982a8cf4c34b6c4300081d",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "live",
     "outcome": "scaled-back",
     "evidenceGrade": "independent",
     "timeline": {
      "started": 2008,
      "ended": null
     }
    },
    "governance": {
     "operator": "Masdar City",
     "actorTypes": [
      "utility"
     ],
     "fundingModel": null,
     "fundingDescription": null,
     "cost": "Announced in 2008 at US$22 billion. Masdar cut the estimate twice during 2010 — first by 10–15%, then by a further $2.5bn to $16bn, a total fall of $6bn or 27% — by dropping the raised podium design, rooftop solar across all buildings and the driverless pod transit system. No account of what was actually spent has been published, and only a fraction of the masterplan was built.",
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-4d607cf5936b11f4",
      "field": "snippet",
      "text": "short-lived driverless PRT pods",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-5dd5f18c6963b972"
      ],
      "supportNote": "The National reports that the cost review which cut Masdar City's price tag to $16bn achieved its savings by abandoning 'a costly pod transit system', along with the raised podium design and the plan to install solar panels on all roofs. The citywide pod network was therefore dropped from the plan two years after launch; the short demonstration line that was built is what remained of it.",
      "caveat": "The article dates the decision, not the closure of the line that was built. It is a newspaper report of a company briefing, not a Masdar document.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-797a8b834edaab02",
      "title": "Masdar City (operator)",
      "url": "https://masdarcity.ae/",
      "publisher": {
       "name": null,
       "domain": "masdarcity.ae",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Official site of the organisation running the project.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-5047e7f32bc1e76e",
      "title": "CNN / The Conversation (press)",
      "url": "https://www.cnn.com/style/article/conversation-masdar-city-lee",
      "publisher": {
       "name": null,
       "domain": "cnn.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2016-09-30",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "News coverage of the project and its ambitions.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-afbfbd5f3671d686",
      "title": "Centre for Public Impact (research)",
      "url": "https://centreforpublicimpact.org/public-impact-fundamentals/masdar-city-in-abu-dhabi/",
      "publisher": {
       "name": null,
       "domain": "centreforpublicimpact.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2018-06-20",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Case study documenting the scaled-back targets and slow build-out.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-5dd5f18c6963b972",
      "title": "The National (press) — Masdar City clips another $2.5bn from price tag, 1 December 2010",
      "url": "https://www.thenationalnews.com/business/masdar-city-clips-another-2-5bn-from-price-tag-1.535641",
      "publisher": {
       "name": null,
       "domain": "thenationalnews.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-4d607cf5936b11f4"
      ],
      "temporal": {
       "publishedAt": "2010-12-01",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "not-recorded",
       "value": null,
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-f28d04a94256186a",
      "title": "The National (press) — completion pushed back, total cost falls, 10 October 2010",
      "url": "https://www.thenationalnews.com/uae/environment/masdar-city-completion-pushed-back-but-total-cost-falls-1.532529/",
      "publisher": {
       "name": null,
       "domain": "thenationalnews.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2010-10-10",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-15",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "not-recorded",
       "value": null,
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 1,
     "claimsMapped": 1,
     "sourcesTotal": 5,
     "sourcesUsedByClaims": 1,
     "sourcesWithPublicationDate": 4,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  }
 ]
}
