opened on 28 July 2010 under the city agency Protransporte
Permanent project revision
Revision 2026-08-17-lima-baseline · effective 2026-08-17
Superseded. A later revision exists: 2026-08-20-source-dates →
Created the first structured Evidence Passport with 12 claims and 9 source dossiers.
sha256:4cf8e9bc61e2f0be86a1067063a30b43e69c4c732ca7ef0f03939cb870ecf998
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-9b30ec49c97d4b6d
quantitative
opened on 28 July 2010 under the city agency Protransporte
clm-5fab8d3cdf813aa4
quantitative
the ATU, the transport authority for Lima and Callao, took it over on 14 September 2020
clm-e76aad0a46123faa
descriptive
Riders still pay with the system's own Metropolitano card, topped up through mobile wallets
clm-0921940e1bb1288e
quantitative
Lima's interoperable card runs on Metro Line 2, not here
clm-4b2f0ea569b91054
quantitative
Ridership reached about 480,000 trips a day in late 2025
clm-76e7843cb48a47fe
descriptive
Fifteen years in, the concession is still formally preoperative
clm-74f0b2911a0b24c9
quantitative
11 of the 17 northern-extension stations stand built but closed
clm-64714c57ff488267
quantitative
About 480,000 trips a day in the last quarter of 2025, up from 420,000 at the start of that year, according to ATU figures
clm-796ec300c6f6f871
descriptive
found large impacts on employment, hours worked and labour earnings for people living close to trunk stations, but none for those near the feeder lines, and no evidence of impacts for populations in lower-income areas
clm-65f69b58d1db9a8b
quantitative
The northern extension cost S/532 million
clm-756763471bab3603
descriptive
fifteen years after opening, the concession is still formally preoperative
clm-34868a5cd440c6b1
descriptive
finished stations stay shut waiting on a contract addendum and buses rather than on any missing technology
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:4cf8e9bc61e2f0be86a1067063a30b43e69c4c732ca7ef0f03939cb870ecf998
src-e785f039d461e617Carries the ridership figures, attributed to ATU: 480,000 daily trips in Q4 2025 against 420,000 at the start of 2025.
src-3bf5f33cc4107f3fStrongest recent source: names the 17 stations of the ampliación norte, the 11 still closed, the S/532M cost, the stalled MEF addendum and ATU's own fleet-shortage statement. Sol figure converted here at roughly S/3.55 per US$ (mid-2026 rate) and rounded generously; no source states a dollar value.
src-94775222dc8a9faaDocuments that the concession has run more than 15 years in a preoperative phase and that ATU planned to send its addendum proposal to the MEF on 15 June 2026.
src-fcc89bdd844a2771Quasi-experimental difference-in-differences evaluation of the Metropolitano. A working paper, not a peer-reviewed journal article — and the IDB also supported the system, so it is funder-adjacent research. Full text: https://docs.iza.org/dp12019.pdf
src-4e14d3b7049a1b8dOfficial gazette: the interoperable card (TIT) has run on Metro Line 2 since 2024; extension to the Metropolitano, the corredores and Metro Line 1 is planned, and the new card will coexist with each service's own card.
src-0d19c29ee7ff1ed8Describes Metropolitano card top-up via Yape/Plin and station validators, and the ATU-wide real-time GPS feed into the SIT's Centro de Gestión y Monitoreo. Notably describes no passenger real-time arrival app.
src-fc9a5cc32a4ebbd9Dates the start of service to 28 July 2010 under Protransporte, and records that the Carabayllo extension announced in 2015 had not materialised.
src-a96fb3a6f5d87b8dOfficial gazette record setting 14 September 2020 as the start of ATU's exercise of the functions transferred from PROTRANSPORTE under the Ley 30900 merger. Confirmed via the search index; the gazette page itself was not fetched directly.
src-6bb92a4d1a095c05Peru's national audit office on the Naranjal–Chimpu Ocllo works. gob.pe returns HTTP 418 to automated fetches (bot wall); the alert is corroborated by El Comercio, Gestión and Ojo.