clm-b0dfeb1cbf1e3729
quantitative
A 2022 pilot put 7,600 meters into two mid-blocks in Jung-gu and Seongbuk-gu on a 1.1 billion won budget
Permanent project revision
Revision 2026-08-27-claims-and-sources · effective 2026-07-21
Current revision. This is the snapshot used by the live entity page.
Created the first structured Evidence Passport with 11 claims and 5 source dossiers.
sha256:42b384950b54bdd44975e307ca8e86d9f8f1ece3d6c97ccda39f4317ccd8c393
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-b0dfeb1cbf1e3729
quantitative
A 2022 pilot put 7,600 meters into two mid-blocks in Jung-gu and Seongbuk-gu on a 1.1 billion won budget
clm-1366c076c3d3a14d
quantitative
in a 2024 restatement, toward full smart metering by 2040
clm-4c7d2b8211eac7a4
quantitative
From 2026 the utility is spending 44.1 billion won by 2027 to convert about 300,000 corridor-apartment households
clm-58cc70307a0f2964
descriptive
the housing type behind about half of all meter freezes in the city
clm-e70efc3e6df875c2
quantitative
meter freeze incidents fell from 1,853 five years ago to 47 this past winter, a 97% drop
clm-425ce766ea3f67d9
quantitative
in Jung-gu alone, where 93.6% of meters have been converted, they fell from 400 in the winter of 2020-21 to 3 in 2025-26
clm-935126e6cc4ae262
quantitative
Seoul still recorded 2,554 freezes citywide this winter
clm-4d5e7ed59a2b861e
quantitative
a mechanical meter froze in about two hours at minus 20 degrees and in eight hours five minutes at minus 5, while a digital meter is designed not to freeze at minus 20 at all
clm-e4cafdb78975c4f4
quantitative
97% of last winter's 2,046 freezes at homes with poor insulation or long absences
clm-4130b6eff3a1415c
quantitative
300,000 insulation covers and 8,300 thicker cabinet liners for the winter it is in, digital meters for the winters after
clm-3068a679fb37676a
quantitative
660,000 taps, 30% of the city, by 2030 in the 2022 plan; a cumulative 1.1 million by 2030 in the 2024 one
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
Erratum on this revision's envelope. The snapshot, its hash and its permanent link are untouched.
sha256:42b384950b54bdd44975e307ca8e86d9f8f1ece3d6c97ccda39f4317ccd8c393
src-7bd28b92b79c4616City portal, 6 May 2022: stage one converts 7,600 meters in one mid-block each in Jung-gu and Seongbuk-gu on a 1.1 billion won budget; stage two covers the whole Central Waterworks Office area (Jongno, Jung, Seongbuk, Yongsan) by 2026 and stage three parts of the Southern and Gangseo areas by 2030, when 660,000 taps — 30% of the city's meters — are to have been replaced. Seoul manages 105 mid-blocks in all.
src-1cf9cf3e7547d09fWinter programme, 13 November 2025: freezes down 33% on the previous winter; of 2,046 meter freezes, 97% at homes with inadequate insulation or long absence; 8,300 vulnerable cabinets to get 8 mm covers, 300,000 insulation covers distributed to corridor-type blocks, 10,000 digital meters secured as roughly four times more freeze-resistant than mechanical ones; a four-stage alert room going 24-hour below minus 10 degrees, with up to 480 staff able to repair 2,500 meters a day.
src-176fd1e57b8db527Press report of 17 March 2026: 44.1 billion won by 2027 to convert about 300,000 corridor-apartment households; 2,554 freezes citywide this winter; bench tests of mechanical meters freezing in about two hours at minus 20 degrees, 2h32 at minus 15, 4h50 at minus 10 and 8h05 at minus 5, against digital meters designed to withstand minus 20; Jung-gu at 93.6% converted going from 400 freezes to 3; the four pilot districts from 1,853 to 47; corridor apartments about half of 19,010 freezes over five years.
src-8bad572eb411c7c5Trade press, 17 May 2024: stage one is to complete smart-metering infrastructure by 2040 and stage two to build services on the accumulated data; 120,000 meters in awkward or unsafe reading locations converted by 2023, a cumulative 1.1 million by 2030.
src-a5779ee2eb2f70f4English-language summary of the 2022 announcement of the smart-metering programme.