clm-446e55bc96c98cc7
quantitative
The 14.4 km Yanfang line opened on 30 December 2017 in Beijing's southwestern Fangshan district
Permanent project revision
Revision 2026-08-28-baseline · effective 2026-07-26
Current revision. This is the snapshot used by the live entity page.
Created the first structured Evidence Passport with 11 claims and 6 source dossiers.
sha256:099883fb71f569b1d0eb7e6205b7f2d6b92b4261aac5f8da1d732e592002917b
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-446e55bc96c98cc7
quantitative
The 14.4 km Yanfang line opened on 30 December 2017 in Beijing's southwestern Fangshan district
clm-129029c250366a29
descriptive
state media and the operator describe it as China's first fully automated metro built entirely from domestic subsystems, its automatic train control coming from Beijing's Traffic Control Technology rather than an imported CBTC
clm-d0ba7369976466fa
quantitative
Trains initially ran at GoA3 with an attendant on board whose job was to supervise rather than drive; the line switched to unattended GoA4 operation in December 2019, after 195 tests of the automatic system
clm-1292176165f7df33
quantitative
The same home-grown system was then scaled up to the 160 km/h Daxing Airport Express, which has run unattended since June 2021
clm-ceec9332381753ba
quantitative
Two years after opening, the operator counted nearly 13.2 million trips on the line, and the planned branch line has been left unbuilt because of low passenger flow
clm-5d2a747c69d16e57
quantitative
Chinese state media reported in January 2025 that 50 fully automated metro lines were running in 21 Chinese cities, about 1,480 km in total, in an article tracing the wave back to Yanfang's 2017 opening
clm-82066d8dd636d934
descriptive
The same article records why the transport ministry had just issued a trial code of practice for these systems: recent incidents had revealed weaknesses in cross-discipline coordination and safety management
clm-7eadb5825cca0115
quantitative
Traffic Control Technology's corporate account has the 2017 demonstration project opening at GoA4
clm-9fdb8b9d213c1b47
quantitative
At the opening the operator told reporters the line was designed to the GoA3 standard and that an attendant would ride to supervise rather than drive — and the company's own project director said the upgrade to GoA4 would come when passengers had grown accustomed to it
clm-fa5066c7722b8dcb
quantitative
It came in December 2019, after 195 tests
clm-944e6df75268422e
quantitative
In January 2025 the transport ministry issued a trial code of practice for fully automated lines because incidents had revealed weak cross-discipline coordination and safety management, and set requirements for lines already running automatically that do not meet it
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
Erratum on this revision's envelope. The snapshot, its hash and its permanent link are untouched.
sha256:099883fb71f569b1d0eb7e6205b7f2d6b92b4261aac5f8da1d732e592002917b
src-870f681741ac4207State press: the Yanfang line upgraded from GoA3 to GoA4 in December 2019 after 195 tests; describes it as China's first fully domestically developed automated subway, opened 30 December 2017, 14.4 km and nine stations.
src-c5b6d986cba72aecConfirms the line opened at GoA3 with an attendant on board who does not drive; everything from rolling stock to signalling domestically produced; names Mao Xinde of Beijing Traffic Control Technology as head of the automation project.
src-a922d9e5203069e1Supporting reference: 14.4 km, nine stations, opened 30 December 2017; the first line in Beijing capable of unattended train operation and the first in China to use only domestically developed subsystems; the planned branch line is deferred for low passenger flow. A living article with no publication date.
src-18702664317eaf84The supplier's own account, a reprint of a China Business News interview, of the Yanfang line as its first fully automatic operation demonstration line. It states the line 'reached the GoA4 level' at its 2017 opening, which the reporting from the opening and the 2019 upgrade announcement contradict; the page carries no reliable publication date.
src-9730ae0141bddbb2Official confirmation that the Daxing Airport Express reached GoA4 unattended operation on 28 June 2021 using a system with fully independent intellectual property rights, at a 160 km/h design speed.
src-3d80fe61b1966e45Source of the diffusion figure: 50 fully automated lines running in 21 cities, about 1,480 km in total, in an article tracing the wave to Beijing's 2017 Yanfang line.