After the July 2020 Choryang underpass flood killed three drivers
Permanent project revision
Revision 2026-08-26-p1-quality-uplift · effective 2026-08-26
Current revision. This is the snapshot used by the live entity page.
Created the first structured Evidence Passport with 10 claims and 9 source dossiers.
sha256:c0b43288580bf702bc5709d0111324f3bff36454f47f83853ebf42d9309dd773
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-5dc35d61dbac5f19
quantitative
After the July 2020 Choryang underpass flood killed three drivers
clm-2a7fda1d18b22ba8
quantitative
Busan mapped inundation risk across 201 neighbourhoods
clm-2c3e1431dc03b01c
quantitative
in May 2023 put the result online at safecity.busan.go.kr
clm-6a1f6b0e02c2a831
descriptive
The portal merges flood-detection sensors, rain gauges, river-level gauges and tide readings with national rainfall forecasts, grading each area safe, caution, alert or danger
clm-0af4a889399e388a
descriptive
The city warned at launch that readings could be inaccurate: too few instruments, an algorithm untested in real storms
clm-a51cb0413f7757be
quantitative
Full operation followed in May 2024
clm-a653cfef3f35382b
quantitative
a 2026 rebuild widened the portal into Busan Safety ON, covering six hazard fields
clm-a1e71896ce7e4160
descriptive
with sensors planned on the highest-risk steep slopes to alarm the district office automatically
clm-28d77448ce0108a6
quantitative
41 of the city's 57 underpasses still fell outside the rule that makes an automatic entry barrier compulsory
clm-80ceb3618f723343
quantitative
nationwide only 164 of 402 underpasses had one fitted
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
Erratum on this revision's envelope. The snapshot, its hash and its permanent link are untouched.
sha256:c0b43288580bf702bc5709d0111324f3bff36454f47f83853ebf42d9309dd773
src-dd42daf8c541b050Carries the city's own caveat that early flood-risk readings may be inaccurate because observation equipment and data are insufficient and the algorithm is unvalidated in real conditions; names the Citizen Safety Office as owner.
src-bf55856f5727e463Supports the May 2023 service launch at safecity.busan.go.kr, the trial period running to April 2024 with full operation from May 2024, the Natural Disaster Division as operator, and the real-time data set including river water level, tide level and rainfall.
src-e002955a1867fa94Official press release: citywide inundation-cause analysis completed December 2020, maps covering 201 eup, myeon and dong across all 16 districts and counties. This is the map layer the 2023 system was built on.
src-4023c30d74a571c7Supports the February 2026 rebuild into the six-field Busan Safety ON portal (urban flooding, earthquake, nuclear safety, sinkhole and landslide, heat and cold waves, shelters), trial February to April 2026, full operation from May 2026.
src-e8a2ef6b5f599cd5Current status: Busan Safety ON in full operation, integrating river water-level and CCTV data; sensors on high-risk Grade-C steep slopes that alarm local authorities automatically when thresholds are crossed; coastal wave overtopping named as one of six Busan-specific storm risks.
src-d4942481bc5ecf8dThe operating service itself; confirms the system is live under the city's own domain as of July 2026.
src-6e16c8778b9fc6f8Independent counterweight behind the lesson: 41 of Busan's 57 underpasses (72%) fall outside the mandatory automatic entry-barrier requirement, four years after the 2020 Choryang deaths; barriers are designed to trigger above 15 cm of water.
src-40077e966e102accContext for the coastal side: Busan's answer to Marine City overtopping is a 500 m submerged breakwater 150 m offshore, completion targeted end-2027. Cited to show it is passive hard engineering with no sensing or automated-closure layer, so it is not part of this entry.
src-0796b5f0903866dbCity press release. Names the four risk stages (safe, caution, alert, danger), the sensor mix behind them (flood-detection sensors, rain gauges, river-level gauges) combined with the Korea Meteorological Administration's rainfall forecast, and the 2019-20 study that produced the citywide inundation maps. Replaces the Smart City Korea copy of the same release, which now returns 404.