Gautrain is a provincial system, not a city programme: the Gautrain Management Agency owns the 80 km, ten-station rapid rail on behalf of Gauteng, and a private concessionaire runs it
Permanent project revision
Revision 2026-10-11-baseline · effective 2026-10-11
Current revision. This is the snapshot used by the live entity page.
Created the first structured Evidence Passport with 16 claims and 10 source dossiers.
sha256:42280e5eb57257b27eb504d40e4fbbdaa5064bacc4aab523d3da004310b0935e
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-11559b02dad3a812
quantitative
Gautrain is a provincial system, not a city programme: the Gautrain Management Agency owns the 80 km, ten-station rapid rail on behalf of Gauteng, and a private concessionaire runs it
clm-502a8879c635efde
quantitative
Bombela Concession Company from 2006, with RATP Dev-led Bombela Operating Company driving the trains
clm-c7b06c52b60051dd
quantitative
until Sihamba Sonke Mobility took over a 15-year concession on 28 September 2026
clm-c045006a462d627d
quantitative
Service began on 8 June 2010
clm-809dbbf23e152d32
descriptive
Park, Rosebank, Sandton, Marlboro and Midrand stations lie in Johannesburg
clm-1e87ecdafd31f60d
quantitative
Fare gates take a Gautrain card or, since 31 October 2019, a contactless bank card
clm-b78b45ba64e1ab62
descriptive
the fare system matches every entry and exit
clm-1d1d88d7e198239e
quantitative
when revenue falls below the minimum it sets, the province pays the gap — R3.05 billion in 2024/25 against 7.86 million rail trips
clm-d37c7399f9d7a6a0
descriptive
No independent measurement of congestion or mode-shift effects has been located; the agency says the system eases congestion but publishes no figure
clm-9714658d746736f3
quantitative
The Auditor-General's report in the GMA's 2024/25 annual report records a patronage guarantee of R3,051,626,000 paid to the concessionaire (2023/24: R2,790,443,000) because revenue and ridership were significantly below the minimum required total revenue
clm-f2556670c36bce03
quantitative
Audited rail passenger trips were 7,860,068 in 2024/25, against a plan of 8,182,572 and an annualised 13,929,916 in 2019/20
clm-c36bc8fc37601bfa
quantitative
the GMA's provincial MEC told the legislature in March 2025 that numbers had fallen from 13.9 million in 2019/20 to 7.9 million in 2023/24
clm-c20cd86daca93138
quantitative
train availability averaged 99.51% and punctuality 97.57% in 2024/25
clm-f8dac7206e7de4e5
quantitative
Bank-card (EMV) taps made up 19.6% of rail product use that year, up 20.3% on 2023/24
clm-051467748e041964
descriptive
bidders competed on the lowest combined provincial contribution and patronage guarantee, the guarantee is cut when performance drops, and so the concessionaire has strong incentives to run trains well and limited incentives to grow revenue
clm-8f6155af3bc267ae
quantitative
availability above 99%, a demand forecast that post-pandemic ridership has not met, and a province paying about R3 billion a year to cover the difference
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:42280e5eb57257b27eb504d40e4fbbdaa5064bacc4aab523d3da004310b0935e
src-7ac2fc4940ebdd1fThe GMA's audited integrated annual report for the year to 31 March 2025, signed 31 July 2025. States 7,860,068 rail passenger trips (7,902,488 in 2023/24), a plan of 8,182,572 rail passengers, train availability 99.51% and punctuality 97.57%, EMV at 19.6% of rail product preference (+20.3%), 32 new PG600 fare gates at OR Tambo, Sandton and Park, the definition of the Minimum Required Total Revenue and the performance-based patronage guarantee, and the Auditor-General's emphasis-of-matter paragraph recording R3,051,626,000 paid in 2024/25 and R2,790,443,000 in 2023/24.
src-1065bf6f2cdf4388The GMA's audited integrated annual report for the year to 31 March 2024. States 7,902,488 passenger trips in 2023/24 (up 10.79%), an audited annualised 13,929,916 rail passengers for 2019/2020, the R25.2 billion provincial contribution shared with the National Department of Transport, and that bidders competed on the lowest combined provincial contribution and patronage guarantee.
src-f3f719e610e30519Government news agency report of the joint GMA and provincial statement: Bombela Concession Company's 19½-year concession for design, construction, partial financing, operation and maintenance ends on 27 March 2026; a preferred bidder has been identified; a contractual holdover from 28 March 2026 of up to six months lets Bombela Operating Company keep operating; the state-owned asset is valued at about R45 billion.
src-2e0502d062b87b98Government news agency report of the GMA's anniversary statement: official launch on 8 June 2010, an 80-kilometre network across 10 stations, more than 216 million passenger trips since inception, and the agency's claim that the system eases congestion. Also states the province now owns the system outright.
src-4167aef5e4013274Reports the GMA media release appointing Sihamba Sonke Mobility (AIIM-Motseng JV, Alstom, RATP Dev, GIBB-Crede, AIH Connect, SSM InvestCo) as operator under a 15-year concession from 2026 to 2041, contracted with the GMA on behalf of the province; the concession became effective on 28 September 2026. Lists planned fleet growth from 24 to 32 four-car trains and the progressive introduction of account-based ticketing.
src-b3af320bca7583e8Reports Bombela's announcement that from 31 October 2019 passengers can tap in and out with contactless credit, debit and cheque cards and National Department of Transport cards, across train, parking and bus services, with the Gautrain card remaining valid.
src-cf5c687b45742665Interview with the Bombela Operating Company CEO: BOC is a joint venture of Strategic Partners Group (36.6%) and RATP Dev (63.4%); the GMA signed the concession with Bombela Concession Company in 2006, which contracted BOC to operate and maintain the service; the Operational Control Room and maintenance workshop are at the Midrand depot; the Gautrain's assets are owned by the Gauteng government.
src-5a95d349f9c8889dReports the Gauteng finance MEC's budget speech: passenger numbers dropped from 13.9 million in 2019/20 to 7.9 million in 2023/24, the province would own the system fully by March 2026, and a new concessionaire was being procured. Its own headline figure of 'lost 5-million commuters' does not match the two numbers it quotes.
src-198c25b04f4bb3f3The City of Johannesburg's own descriptive page: lists the North–South line stations as Johannesburg's Park Station, Rosebank, Sandton, Marlboro and Midrand, then Pretoria Station and Hatfield, with the airport line via Rhodesfield and Marlboro. The page carries a stray reference marker and reads as adapted from an encyclopaedia entry; it is cited only for the station list.
src-a8ffcc0f55438889The concessionaire's fare guide for fares effective 1 June 2025. States that train products (monthly, weekly, return and single) cannot be loaded onto a contactless bank card and can only be loaded onto Gautrain cards — the limit of the bank-card layer.