clm-4b3c3fbe819c6167
quantitative
laid out in September 2016 inside the perimeter of Badajoz, Pallars, Llacuna and Tànger
Permanent project revision
Revision 2026-08-23-evidence-baseline-c9 · effective 2026-07-15
Current revision. This is the snapshot used by the live entity page.
Created the first structured Evidence Passport with 12 claims and 3 source dossiers.
sha256:cab1dc287dd8c190b691857016c0c7d6e9be8878a320dedb2d2f8d6014d95346
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-4b3c3fbe819c6167
quantitative
laid out in September 2016 inside the perimeter of Badajoz, Pallars, Llacuna and Tànger
clm-73f3ac284477c884
quantitative
the city had tested the idea in Gràcia back in 2003
clm-41c8c38cdb9a9e75
descriptive
trialled with painted road markings, movable furniture and trees in containers
clm-689de0fc22ea7dc9
descriptive
at a tenth of what conventional works would have cost
clm-cb2578412668e248
quantitative
then consolidated in concrete from autumn 2017
clm-74c9a21aaeb32b4b
quantitative
Traffic on inner streets fell 58%
clm-21b5697867f321ea
quantitative
(perimeter roads rose 2.6%)
clm-558b4cd34e533dde
quantitative
about 13,350 m² of street space was reclaimed for people
clm-29b69bc68fba3627
descriptive
daytime noise fell about five decibels
clm-35373d39500af1c1
quantitative
212 trees and more than 300 benches went in
clm-459d27a3c7347a43
descriptive
The pilot drew a media storm and sustained protest within days of the first phase
clm-dae9da6b028d8a85
descriptive
was adjusted through a residents' working group rather than abandoned
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:cab1dc287dd8c190b691857016c0c7d6e9be8878a320dedb2d2f8d6014d95346
src-4427adec49b7431dThe city's own page on the Poblenou superblock: the September 2016 perimeter, the temporary and reversible first phase, the residents' working group that reshaped it, and the permanent works from autumn 2017. It carries no measurements.
src-d029ba7746b5baeePublished four months before the Poblenou pilot opened, so it describes the programme rather than this superblock. Source for the lineage: the idea was outlined in 1987 and first tested in Gràcia in 2003.
src-e1f3b58f58bb9a21The prize archive of the CCCB, and the only source in this entry that carries the measurements: 13,350 m² of pedestrian space gained, 58% less traffic on the inner streets against 2.6% more on the perimeter, five decibels less daytime noise, 212 trees and more than 300 benches. It also records the media storm and the resident protests that followed the first phase. The figures are the city's own evaluation, reported here rather than measured here.