Superblock Poblenou
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
How this atlas is made · What “last verified” means · What “source-checked” means · The full record behind this page
The flagship pilot of Barcelona's modern superblock programme, laid out in September 2016 inside the perimeter of Badajoz, Pallars, Llacuna and Tànger; the city had tested the idea in Gràcia back in 2003. It was trialled with painted road markings, movable furniture and trees in containers at a tenth of what conventional works would have cost, then consolidated in concrete from autumn 2017.
what does this mean?
The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →📊 Impact
Traffic on inner streets fell 58% (perimeter roads rose 2.6%); about 13,350 m² of street space was reclaimed for people, daytime noise fell about five decibels, and 212 trees and more than 300 benches went in.
🎓 Lesson
Cheap tactical materials first, concrete later. The pilot drew a media storm and sustained protest within days of the first phase, and was adjusted through a residents' working group rather than abandoned.
Sources
Show your work What this page rests on and what it can’t tell you · all 12 claims with their sources · the forensic record
Evidence Passport · public beta 12 addressable claims, 3 source dossiers, one permanent baseline. The passport is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.
Inspect the claims, one by one — verbatim text, sources and caveats for all 12
The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-4b3c3fbe819c6167
quantitative
laid out in September 2016 inside the perimeter of Badajoz, Pallars, Llacuna and Tànger
Sources carrying this claim
clm-73f3ac284477c884
quantitative
the city had tested the idea in Gràcia back in 2003
Sources carrying this claim
clm-41c8c38cdb9a9e75
descriptive
trialled with painted road markings, movable furniture and trees in containers
Sources carrying this claim
clm-689de0fc22ea7dc9
descriptive
at a tenth of what conventional works would have cost
Sources carrying this claim
clm-cb2578412668e248
quantitative
then consolidated in concrete from autumn 2017
Sources carrying this claim
clm-74c9a21aaeb32b4b
quantitative
Traffic on inner streets fell 58%
Sources carrying this claim
clm-21b5697867f321ea
quantitative
(perimeter roads rose 2.6%)
Sources carrying this claim
clm-558b4cd34e533dde
quantitative
about 13,350 m² of street space was reclaimed for people
Sources carrying this claim
clm-29b69bc68fba3627
descriptive
daytime noise fell about five decibels
Sources carrying this claim
clm-35373d39500af1c1
quantitative
212 trees and more than 300 benches went in
Sources carrying this claim
clm-459d27a3c7347a43
descriptive
The pilot drew a media storm and sustained protest within days of the first phase
Sources carrying this claim
clm-dae9da6b028d8a85
descriptive
was adjusted through a residents' working group rather than abandoned
Sources carrying this claim
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:cab1dc287dd8c190b691857016c0c7d6e9be8878a320dedb2d2f8d6014d95346
- 12
- of 12 claims mapped
- 3
- source dossiers
- 1
- publication dates recorded
- 0
- archives linked
- 0
- exact locators
- 0
- content captures hashed
Governance facts carried by the record
- Operator
- Ajuntament de Barcelona
- Actor types
- city-government
- Funding model
- public
- Funding description
- Not recorded
- Cost
- Not recorded
- Ownership
- Not recorded
- Decision rights
- Not recorded
- Exit conditions
- Not recorded
3 source dossiers
Ajuntament de Barcelona (authority)
- Stable source ID
src-4427adec49b7431d- Publisher
- Name not classified · ajuntament.barcelona.cat
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-15
- Dossier created
- 2026-08-23
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
The city's own page on the Poblenou superblock: the September 2016 perimeter, the temporary and reversible first phase, the residents' working group that reshaped it, and the permanent works from autumn 2017. It carries no measurements.
The Guardian (press)
- Stable source ID
src-d029ba7746b5baee- Publisher
- Name not classified · theguardian.com
- Type / language
- web-page · language not classified
- Published
- 2016-05-17
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-15
- Dossier created
- 2026-08-23
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Published four months before the Poblenou pilot opened, so it describes the programme rather than this superblock. Source for the lineage: the idea was outlined in 1987 and first tested in Gràcia in 2003.
- Claims linked
Centre de Cultura Contemporània de Barcelona — European Prize for Urban Public Space, "Poblenou's Superblock"
- Stable source ID
src-e1f3b58f58bb9a21- Publisher
- Name not classified · publicspace.org
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- 2023-05-19
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-15
- Dossier created
- 2026-08-23
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
The prize archive of the CCCB, and the only source in this entry that carries the measurements: 13,350 m² of pedestrian space gained, 58% less traffic on the inner streets against 2.6% more on the perimeter, five decibels less daytime noise, 212 trees and more than 300 benches. It also records the media storm and the resident protests that followed the first phase. The figures are the city's own evaluation, reported here rather than measured here.
Known limits of this passport
- Publisher names and source languages have not yet been classified; domains are recorded without guessing.
- Existing source notes are descriptive locators, not page- or paragraph-exact citations.
- A missing archive, publication date or content hash is shown as null rather than inferred.
- The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
Continue exploring
Compare this project
The superblock, four times, and what happened after the ribbon
One idea — push through-traffic to the perimeter and give the inside back to people — built four times over a decade. Read in order, the set is less about design than about what survives a change of administration and a court.
| Project | Since | Status | Outcome | Evidence | Run by | Cost | Where it stands |
|---|---|---|---|---|---|---|---|
| Superblock PoblenouBarcelona, 🇪🇸 | 2016 | Live | Succeeded | Official | City government | not public | The pilot that set the method: cheap tactical materials first, concrete later. Traffic on the inner streets fell by well over half, and the perimeter barely moved. |
| Superblock Sant AntoniBarcelona, 🇪🇸 | 2018 | Live | Succeeded | Media | City government | not public | The version that got an independent health verdict — the city's public health agency measured a quarter less nitrogen dioxide inside the pedestrianised area. |
| Green Axes EixampleBarcelona, 🇪🇸 | 2022 | Live | Scaled back | Official | City government | not public | The scale-up that stopped. Four streets were rebuilt, further expansion has been ruled out on cost, and a court has ordered part of one axis reverted. |
| Viennese Supergrätzl (Superblocks)Vienna, 🇦🇹 | 2022 | Live | Ongoing | Official | City government | not public | The copy abroad, with the evaluation built in from the start: traffic counts, microclimate modelling and a resident survey, and no outcome data claimed until they report. |
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Superblock Poblenou” — Barcelona, Spain. The Smart City Atlas. https://1001smartcities.org/projects/superblock-poblenou/ (last verified 2026-07-15). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.
