clm-6926ea266e8d589b
descriptive
bills electricity through prepayment
Permanent project revision
Revision 2026-08-15-baseline · effective 2026-08-15
Superseded. A later revision exists: 2026-08-20-source-dates-b4 →
Created the first structured Evidence Passport with 11 claims and 5 source dossiers.
sha256:6c8ef5ac65d6edd7be15cf74b63998806cba47a083fc2205609df784eaf32066
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-6926ea266e8d589b
descriptive
bills electricity through prepayment
clm-bd40ed19a1ae51fb
descriptive
keeps an extensive, geo-referenced database of grid consumers
clm-682637f16c139675
quantitative
in April 2023 the RSF took over the national load dispatch centre in Khartoum
clm-c6a87eb780129f42
descriptive
run the grid manually, coordinating by cell phone
clm-b8c2c4f80bb8e356
descriptive
split into a northern and a southern half
clm-d590db602656a4de
quantitative
Up to 40% of the country's generation capacity had been lost by 2025
clm-e6e2cb262d3f3b68
descriptive
Khartoum proper's distribution network remained largely destroyed
clm-e2eb5e9856de2912
descriptive
paying black-market prices for generator diesel
clm-a485969672d8f47c
quantitative
more than 20 substations rehabilitated and over 1,700 km of transmission lines repaired
clm-028c17a7991a97aa
quantitative
power cuts of up to 18 hours a day
clm-eadb55a8952395c8
descriptive
announced through ministry statements rather than a published rationing schedule
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:6c8ef5ac65d6edd7be15cf74b63998806cba47a083fc2205609df784eaf32066
src-2b84446e6984cc79Carries the April 2023 RSF takeover of the national load dispatch centre in Khartoum, SETCO's manual cell-phone grid operation and the north/south grid split. The PDF downloads but its text is CID-encoded and resisted extraction in the sandbox; passages confirmed via the report's indexed text in search results.
src-a8d18efc0a958c3fFetched in full: up to 40% of generation capacity lost by 2025; the prepayment billing structure and the holding company's geo-referenced consumer database; 62% pre-war electricity access.
src-1d681698acb71654Ministry rehabilitation figures (20+ substations, 1,700+ km lines, 260 MW restored, ~600 MW expected) and the load-shedding statement; site 403-walls automated fetches — confirmed via search snippets and the Eastleigh Voice syndication of the same statement.
src-c89ab8842209c345Fetched: April 2026 daily-life impact of the cuts in Khartoum ('no longer just a temporary power outage… a daily reality').
src-dde7f2d08ae80807Fetched: Khartoum proper's grid 'largely destroyed' in mid-2025, households on generators with black-market diesel over 30,000 SDG (about $11, Xinhua's conversion) per gallon; Omdurman and Bahri better off.