clm-a4ea8996e78a799e
quantitative
since 2 May 1984 with no staff on board, supervised from a central control room
Permanent project revision
Revision 2026-08-15-baseline · effective 2026-08-15
Superseded. A later revision exists: 2026-08-20-source-dates-b6 →
Created the first structured Evidence Passport with 13 claims and 4 source dossiers.
sha256:f2a1f15210bbc54522ab331d30e303b5eb9c45a85e03a6ff37148269eaa0137f
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-a4ea8996e78a799e
quantitative
since 2 May 1984 with no staff on board, supervised from a central control room
clm-33bb5646f9112b40
descriptive
the operator calls the H-Bahn Germany's first fully automatic transport system in regular passenger service
clm-76365c93808f6242
quantitative
NRW's transit portal classes it as GoA 4
clm-6b24225032f99015
quantitative
Extensions in 1993 and 2003 grew the suspended monorail to 3.4 kilometres
clm-6f47e143b5e00398
quantitative
in semester time it carries around 7,000 passengers a day
clm-95fc1b0e671faaa4
quantitative
On 1 January 2025 the operating company H-BAHN21 was merged into transit parent DSW21
clm-63905c152a129c94
quantitative
a roughly two-kilometre extension to the U42 light-rail stop in Barop
clm-69aac0f1d4477776
quantitative
estimated at €39 million
clm-5f81a0b4f9d7c7a0
quantitative
funded up to 95 percent under Germany's GVFG programme
clm-29cf69f575427c5d
quantitative
targeted to open in 2029
clm-9279f98fa74422bf
quantitative
45 million passengers and 5.9 million kilometres
clm-16156140bc24d488
quantitative
availability above 99 percent
clm-959b852e5decf4da
descriptive
the H-Bahn has run unattended from its first day
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:f2a1f15210bbc54522ab331d30e303b5eb9c45a85e03a6ff37148269eaa0137f
src-d483d58cd08d1188Operator anniversary piece: opening 2 May 1984 as Germany's first driverless system, 1993/2003 extensions, 3.4 km, ~7,000 daily riders, 45M passengers / 5.9M km / >99% availability.
src-19122d6bbd968ecdOperator release: merger retroactive to 1 January 2025, 16 staff transferred, ~2 km Barop extension, ≈€39M cost, up to 95% GVFG funding, commissioning 2029.
src-78d5c02c3027115eNRW transit portal classes the H-Bahn as GoA 4 — fully automatic, no operating staff aboard, in public service since 1984; control centre can intervene.
src-6710bad639668bdfLocal press: ≈€2.5M planning contracts in 2025, two route options in environmental review, planning approval targeted early 2027, test track 2028, opening 2029.