Created the first structured Evidence Passport with 8 claims and 9 source dossiers.

sha256:9539a9d7b2123be4f30de7c159ecaf6ece8e83b15d89975246bc73b5717fb385

Change set

  • add /evidencePassport — Added claim-level evidence mapping and source dossiers.
  • add /revisionHistory — Established a permanent, hash-addressed baseline revision.
8
of 8 claims mapped
9
source dossiers
5
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Claims, one by one

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-42d49d70695d3bc3 quantitative
Metro trains drove themselves between stations from the system's 1976 opening until June 2009, when WMATA put the whole network into manual mode within about a day of the Fort Totten rear-end collision that killed nine people
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The NTSB record establishes the collision and its toll: 'Nine people aboard train 112, including the train operator, were killed', with 52 people transported to hospitals.
Caveat
The one-day timing of the switch to manual mode is the operator's decision rather than an NTSB finding; the investigation documents the crash, not the mode change.

Sources carrying this claim

  1. NTSB — Collision of Two WMATA Metrorail Trains Near Fort Totten Station (DCA09MR007)
Claim 2 clm-3c654d0ee914fa41 descriptive
The NTSB traced the crash to track circuit modules that stopped detecting a standing train and to a verification test WMATA never rolled out system-wide — not to the driving automation that was turned off
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The probable cause reads: 'a failure of the track circuit modules ... that caused the automatic train control system to lose detection of train 214 and thus transmit speed commands to train 112 up to the point of impact', together with WMATA's failure to institutionalise the enhanced track circuit verification test developed after the 2005 Rosslyn near-collisions. None of the 25 recommendations calls for suspending automatic train operation.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. NTSB — Collision of Two WMATA Metrorail Trains Near Fort Totten Station (DCA09MR007)
  2. NTSB Railroad Accident Report RAR-10/02 (full report, adopted 27 July 2010)
Claim 3 clm-9668434a6a942e38 quantitative
Automatic train operation came back line by line: Red on 15 December 2024, Green and Yellow on 23 May 2025, Blue, Orange and Silver on 15 June 2025, each step needing the safety commission's concurrence
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The three operator releases date each step and name the gatekeeper: the Green and Yellow release states ATO is coming 'after rigorous internal training and testing and concurrence from the Washington Metrorail Safety Commission', and the Blue/Orange/Silver release calls 15 June 2025 'the first full return to ATO since 2009'.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. WMATA — Metro to begin Automatic Train Operation for the first time in 15 years (12 Dec 2024)
  2. WMATA — Metro to launch Automatic Train Operation on the Green and Yellow lines on May 23 (20 May 2025)
  3. WMATA — Metro to launch Automatic Train Operation on the Blue, Orange, and Silver lines on June 15 (2025)
Claim 4 clm-624c70fc51365c11 descriptive
Operators stay in the cab, working the doors and watching the track
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The operator states that ATO 'controls the trains' acceleration, deceleration, and speed' from trackside commands while operators 'will remain responsible for the safety of the customers aboard their trains' and keep monitoring track conditions, train status and door operations. A 2026 currency check confirms the arrangement still holds: ATO 'still requires a train operator to be in the cab'.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. WMATA — Metro to begin Automatic Train Operation for the first time in 15 years (12 Dec 2024)
  2. Washingtonian — DC's Metro wants to install platform doors and run fully automated trains (23 April 2026)
Claim 5 clm-4829a166cdaab5e3 quantitative
end-to-end travel times down 8 minutes on the Red Line after several months under ATO, 1-2 minutes on the Green and Yellow lines and about 3 minutes each on the Blue, Orange and Silver lines from 22 June 2025; WMATA reports no red signal violations by trains in ATO
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The May release reports Red Line end-to-end trips cut by 8 minutes since December with no red signal violations under ATO; the June release gives about 3 minutes on Blue, Orange and Silver from 22 June and 1-2 minutes on Yellow and Green. Independent trade press confirms the same per-line figures.
Caveat
Operator figures, labelled as such in the entry. The trade-press confirmation repeats the operator's numbers rather than measuring independently.

Sources carrying this claim

  1. WMATA — Metro to launch Automatic Train Operation on the Green and Yellow lines on May 23 (20 May 2025)
  2. WMATA — Metro to launch Automatic Train Operation on the Blue, Orange, and Silver lines on June 15 (2025)
  3. Mass Transit — WMATA begins automatic train operation on entire rail system (June 2025)
Claim 6 clm-bb2074e4b2697405 quantitative
217 station overruns under ATO since December 2024, roughly ten times the manual-mode rate, which WMATA called 'a reliability problem and not a safety problem'
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The trade report gives 217 trains under ATO overrunning station stops since December, about ten times the number under manual driving, 38 per cent of them by three or more cars, with doors staying shut during an overrun. WMATA confirmed the count, called it 'a reliability problem and not a safety problem' and pointed to zero red signal violations in ATO. The cause was traced to false marker coil detection.
Caveat
Press-reported and not independently audited; the entry labels it as such. The page returned an error to automated fetching, so existence and content were confirmed through two independent search passes and corroborated by the safety commission's own filing.

Sources carrying this claim

  1. Trains — DC Metrorail blocked from expanded use of ATO system (April 2025)
Claim 7 clm-f8c47b10895792cd quantitative
the safety commission withheld concurrence for expansion until WMATA scheduled a software update and a new antenna normalisation procedure for 7000 Series railcars
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The commission's own filing lists what Metrorail must do to receive concurrence for ATO on the Green and Yellow lines, including 'a detailed performance schedule outlining milestones and timelines for the implementation of software update and the new antenna normalization procedure for 7000 Series railcars', an interim roadway-worker protection measure and monthly rules-compliance reports.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Washington Metrorail Safety Commission — Red Signal Overrun Events, public meeting 13 May 2025
Claim 8 clm-3834e40fb67b6ec3 descriptive
Switching working automation off after a disaster takes a day; switching it back on took fifteen years, a regulator's line-by-line concurrence and a fix to how railcars sense their own position — even though the crash investigation blamed train detection, not the driving mode
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The NTSB attributed the collision to track circuit modules losing detection of a standing train, and none of its 25 recommendations calls for suspending automatic train operation. The return began on 15 December 2024, fifteen years later, and the safety commission conditioned each further line on a fix to how 7000 Series railcars normalise their position antennas.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. NTSB — Collision of Two WMATA Metrorail Trains Near Fort Totten Station (DCA09MR007)
  2. Washington Metrorail Safety Commission — Red Signal Overrun Events, public meeting 13 May 2025
  3. WMATA — Metro to begin Automatic Train Operation for the first time in 15 years (12 Dec 2024)

Source dossiers and revision state

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-08-20-claim-baseline effective 2026-07-26 · created 2026-08-21

Awaiting operator and domain-expert review; publication of this revision implies neither.

sha256:9539a9d7b2123be4f30de7c159ecaf6ece8e83b15d89975246bc73b5717fb385
8
of 8 claims mapped
9
source dossiers
5
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
Washington Metropolitan Area Transit Authority (WMATA)
Actor types
utility
Funding model
public
Funding description
WMATA capital programme; no separate budget line for the ATO restoration has been published. The follow-on plan endorsed by the board in April 2026 (full Red Line automation plus platform screen doors at 20 of 27 stations) is costed at $913 million and depends on federal funding.
Cost
Not recorded
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

9 source dossiers

NTSB — Collision of Two WMATA Metrorail Trains Near Fort Totten Station (DCA09MR007) ntsb.gov · 3 linked claims

Open original source ↗

Stable source ID
src-ff25026366c51ce7
Publisher
Name not classified · ntsb.gov
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-21
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Probable cause: 'a failure of the track circuit modules ... that caused the automatic train control system to lose detection of train 214 and thus transmit speed commands to train 112 up to the point of impact', plus WMATA's failure to institutionalise the enhanced track circuit verification test developed after the 2005 Rosslyn near-collisions. 'Nine people aboard train 112, including the train operator, were killed'; 52 people were transported to hospitals. None of the 25 recommendations calls for suspending automatic train operation.

Descriptive only — not page/paragraph exact
NTSB Railroad Accident Report RAR-10/02 (full report, adopted 27 July 2010) ntsb.gov · 1 linked claim

Open original source ↗

Stable source ID
src-8c2e334e7d825410
Publisher
Name not classified · ntsb.gov
Type / language
pdf · language not classified
Published
2010-07-27
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-21
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Full report behind the probable cause quoted above; also the source of the telescoping detail (the rear car of train 214 telescoped about 63 feet, some 84 percent of the length of the lead car of train 112) and the $12 million equipment damage estimate.

Descriptive only — not page/paragraph exact
WMATA — Metro to begin Automatic Train Operation for the first time in 15 years (12 Dec 2024) wmata.com · 3 linked claims

Open original source ↗

Stable source ID
src-ec26d994448f08da
Publisher
Name not classified · wmata.com
Type / language
web-page · language not classified
Published
2024-12-12
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-21
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

ATO starts on the Red Line on 15 December 2024. ATO 'controls the trains' acceleration, deceleration, and speed' from commands sent by trackside equipment, while operators 'will remain responsible for the safety of the customers aboard their trains' and keep monitoring track conditions, train status and door operations.

Descriptive only — not page/paragraph exact
WMATA — Metro to launch Automatic Train Operation on the Green and Yellow lines on May 23 (20 May 2025) wmata.com · 2 linked claims

Open original source ↗

Stable source ID
src-b788df0931694d5a
Publisher
Name not classified · wmata.com
Type / language
web-page · language not classified
Published
2025-05-20
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-21
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

'Automatic Train Operation (ATO) is coming to the Green and Yellow lines on Friday, May 23 after rigorous internal training and testing and concurrence from the Washington Metrorail Safety Commission.' Also: end-to-end Red Line trips cut by 8 minutes since December, with no red signal violations under ATO.

Descriptive only — not page/paragraph exact
WMATA — Metro to launch Automatic Train Operation on the Blue, Orange, and Silver lines on June 15 (2025) wmata.com · 2 linked claims

Open original source ↗

Stable source ID
src-ada7b445b21d55dc
Publisher
Name not classified · wmata.com
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-21
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Blue, Orange and Silver switch on 15 June 2025, 'the first full return to ATO since 2009'; end-to-end times fall by about 3 minutes on all three lines from 22 June, after the Yellow and Green lines 'began using ATO in May' with savings of 1-2 minutes.

Descriptive only — not page/paragraph exact
Washington Metrorail Safety Commission — Red Signal Overrun Events, public meeting 13 May 2025 wmsc.gov · 2 linked claims

Open original source ↗

Stable source ID
src-f5b3fae6eefb4b08
Publisher
Name not classified · wmsc.gov
Type / language
pdf · language not classified
Published
2025-05-13
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-21
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Lists what Metrorail must do to receive WMSC concurrence for ATO on the Green and Yellow lines, including 'a detailed performance schedule outlining milestones and timelines for the implementation of software update and the new antenna normalization procedure for 7000 Series railcars', an interim roadway-worker protection measure, and monthly rules-compliance reports. The regulator, not WMATA, controlled the pace of the rollout.

Descriptive only — not page/paragraph exact
Trains — DC Metrorail blocked from expanded use of ATO system (April 2025) trains.com · 1 linked claim

Open original source ↗

Stable source ID
src-44282517cef04710
Publisher
Name not classified · trains.com
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-21
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Source of the overrun counterweight: 217 trains under ATO overran station stops since December, about ten times the number under manual driving, 38 percent of them by three or more cars, with doors staying shut during an overrun; WMATA confirmed the count, called it 'a reliability problem and not a safety problem' and pointed to zero red signal violations in ATO. Cause traced to false marker coil detection. Page returned 403 to automated fetching; existence and content confirmed through two independent search passes and corroborated by the WMSC filing above.

Descriptive only — not page/paragraph exact
Washingtonian — DC's Metro wants to install platform doors and run fully automated trains (23 April 2026) washingtonian.com · 1 linked claim

Open original source ↗

Stable source ID
src-a39e04cc31f9a0ca
Publisher
Name not classified · washingtonian.com
Type / language
web-page · language not classified
Published
2026-04-23
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-21
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Currency check: 'As of summer 2025, all Metro trains already run via Automatic Train Operation (ATO), which controls the train's acceleration and speed, but still requires a train operator to be in the cab.' The board voted to endorse full Red Line automation plus platform screen doors at 20 of 27 stops; '$913 million' still to be secured; 'not be finished on the Red Line until 2032 at the earliest'.

Descriptive only — not page/paragraph exact
Mass Transit — WMATA begins automatic train operation on entire rail system (June 2025) masstransitmag.com · 1 linked claim

Open original source ↗

Stable source ID
src-3872a0d940bfc549
Publisher
Name not classified · masstransitmag.com
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-21
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Independent trade-press confirmation of the completed rollout and of the per-line travel-time figures (8 minutes Red; about 3 minutes Blue, Orange, Silver; 1-2 minutes Yellow, Green), noting the rollout 'followed internal training and testing and concurrence from the Washington Metrorail Safety Commission'.

Descriptive only — not page/paragraph exact
Known limits of this passport
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.