Permanent project revision

Wiener Netze Smart Meter Rollout

Revision 2026-08-21-evidence-baseline · effective 2026-07-22

Current revision. This is the snapshot used by the live entity page.

unreviewed

Created the first structured Evidence Passport with 11 claims and 6 source dossiers.

sha256:41069917736d706a62adc7645221e986ed4cf2544e409bd138771ce0940e0557

Change set

  • add /evidencePassport — Added claim-level evidence mapping and source dossiers.
  • add /revisionHistory — Established a permanent, hash-addressed baseline revision.
11
of 11 claims mapped
6
source dossiers
3
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Claims, one by one

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-0b0916d3a0d917e6 quantitative
Siemens led a consortium with Landis+Gyr and Iskraemeco (selected 2017)
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Iskraemeco's project page dates the award and names the same three companies: "In August 2017, Wiener Netze announced that it had selected a consortium comprising Siemens, Landis+Gyr and Iskraemeco for the mass-deployment phase of the rollout." Siemens' own magazine names the same three: "Siemens ist gemeinsam mit Landis+Gyr und Iskraemeco Lead- und Technologiepartner der Wiener Netze bei der Umstellung auf die neuen elektronischen Stromzähler" (Siemens is, together with Landis+Gyr and Iskraemeco, lead and technology partner of Wiener Netze).
Caveat
Neither source puts Siemens above the other two. Iskraemeco describes a consortium of three without a lead, and the Siemens magazine calls all three jointly lead and technology partners, so "Siemens led" is a stronger reading than the sources give. Both are suppliers writing about their own contract.

Sources carrying this claim

  1. Iskraemeco — Digitalization of the power grid and smart metering in Wiener Netze
  2. hi!tech.at — 95 Prozent aller Stromzähler von Wiener Netze sind Smart Meter, 2024-12-19
Claim 2 clm-0df4d1a7864ca62a quantitative
to swap Vienna-area electricity meters for smart meters from November 2018
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Iskraemeco gives the month: "Installations began at a smaller scale in November 2018." The Siemens magazine gives the year and the scope: "Im Jahr 2018 starteten die Wiener Netze mit dem Tausch bei rund 1,6 Millionen Haushalten und Unternehmen" (in 2018 Wiener Netze began the swap across some 1.6 million households and businesses).
Caveat
November 2018 was a deliberately small start. The same source says the large-scale phase only began in 2021, with 436,000 meters deployed by the end of that year. The service area is also wider than the city: Wiener Netze supplies Vienna plus parts of Lower Austria and Burgenland.

Sources carrying this claim

  1. Iskraemeco — Digitalization of the power grid and smart metering in Wiener Netze
  2. hi!tech.at — 95 Prozent aller Stromzähler von Wiener Netze sind Smart Meter, 2024-12-19
Claim 3 clm-26a02673e3a44f91 quantitative
Wiener Netze hit Austria's 95% legal target in December 2024
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Siemens' magazine ties the milestone to a dated, symbolic meter swap: "Mit dem symbolträchtigen Tausch der Zähler im Wiener Stephansdom im Dezember 2024 haben die Wiener Netze 95 Prozent aller Stromzähler auf neue elektronische Stromzähler umgestellt" (with the symbolic meter swap in St Stephen's Cathedral in December 2024, Wiener Netze converted 95 percent of all electricity meters). Wiener Netze's own legal page dates the same achievement a month earlier, to November 2024: "Dieses Ziel haben die Wiener Netze im November 2024 erfüllt." The operator and its supplier therefore give different months for the same milestone.
Caveat
The month is disputed by the operator itself. Wiener Netze's legal page says the target was met in November 2024; the December date comes from its supplier and is tied to a symbolic ceremony rather than to the moment the threshold was crossed.

Sources carrying this claim

  1. hi!tech.at — 95 Prozent aller Stromzähler von Wiener Netze sind Smart Meter, 2024-12-19
Claim 4 clm-6c9acccf8ea63d4e quantitative
cut remaining legacy meters to about 46,000
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Both the operator's press page and the identical wire release state the figure: "Bereits rund 1,6 Millionen Smart Meter sind installiert. Aber rund 46.000 Altzähler sind noch im Einsatz" (some 1.6 million smart meters are installed, but around 46,000 old meters are still in service). The release adds why they must go: the calibration period of those meters is expiring, and under the Austrian weights and measures act they may then no longer be operated.
Caveat
This is the operator's own count and is not broken down or independently audited. The release is also an enforcement notice, which gives Wiener Netze a reason to state the remaining number plainly.

Sources carrying this claim

  1. Wiener Netze — Letzte Chance für Umstellung auf Smart Meter (2026)
  2. Wiener Netze / OTS press release, 2026-03-30
Claim 5 clm-6aff12715b58be2c quantitative
of ~1.6 million
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The press release counts the meters already exchanged: "Mehr als 1,6 Millionen Zähler wurden bereits erfolgreich getauscht" (more than 1.6 million meters have already been successfully exchanged). Siemens' magazine uses the same order of magnitude for the whole task: "Im Jahr 2018 starteten die Wiener Netze mit dem Tausch bei rund 1,6 Millionen Haushalten und Unternehmen."
Caveat
The two sources count slightly different things. The press release puts about 1.6 million meters already swapped and roughly 46,000 still outstanding on top of that, so the total stock is a little above 1.6 million rather than 46,000 being part of it.

Sources carrying this claim

  1. Wiener Netze / OTS press release, 2026-03-30
  2. hi!tech.at — 95 Prozent aller Stromzähler von Wiener Netze sind Smart Meter, 2024-12-19
Claim 6 clm-572e802c946f400f quantitative
by March 2026
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Both carry the same date line for the statement of remaining meters: the operator's press page is marked "Publiziert am: 30.03.2026" and the wire release is stamped "30.03.2026, 10:00:50". The figures are given as the position on that day.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Wiener Netze — Letzte Chance für Umstellung auf Smart Meter (2026)
  2. Wiener Netze / OTS press release, 2026-03-30
Claim 7 clm-bd752a29a051ec60 quantitative
~1.6 million electricity meters in Wiener Netze's service area
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The press release states the installed base and the service area in the same document: "Bereits rund 1,6 Millionen Smart Meter sind installiert", and separately that "Mehr als 2 Millionen KundInnen in Wien, Teilen Niederösterreichs und des Burgenlands" are supplied (more than 2 million customers in Vienna, parts of Lower Austria and Burgenland). Siemens' magazine gives the same 1.6 million figure for the households and businesses covered by the swap.
Caveat
The figure counts electricity meters, not customers: the same release puts the customer base above two million. It is an operator figure and carries no independent count.

Sources carrying this claim

  1. Wiener Netze / OTS press release, 2026-03-30
  2. hi!tech.at — 95 Prozent aller Stromzähler von Wiener Netze sind Smart Meter, 2024-12-19
Claim 8 clm-36154b0f178a12e6 quantitative
Austria's 95% legal smart-meter target
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The operator's legal page describes the quota as a national one, set out in a regulation under the Austrian electricity act: "Der nationale Plan für die Einführung sieht zu den Zielen auf EU-Ebene bis Ende 2024 eine Abdeckung von mindestens 95 Prozent der österreichischen Haushalte und Unternehmen mit Smart Metern vor" (the national rollout plan provides for coverage of at least 95 percent of Austrian households and businesses by the end of 2024). The page names the instrument as the Intelligente Messgeräte-Einführungsverordnung (IME-VO 2022) under ElWOG 2010, and traces the requirement back to the EU's third internal energy market package.
Caveat
The 95 percent is a country-wide quota, not a target written for Vienna. Wiener Netze reports meeting it within its own service area; the page does not say what share of the national total that represents.

Sources carrying this claim

  1. Wiener Netze — Rechtliches zum Smart Meter
Claim 9 clm-3e247e029960cc65 quantitative
reached in December 2024
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Siemens' magazine, published on 19 December 2024, reports the threshold as crossed that month: "Mit dem symbolträchtigen Tausch der Zähler im Wiener Stephansdom im Dezember 2024 haben die Wiener Netze 95 Prozent aller Stromzähler auf neue elektronische Stromzähler umgestellt." Wiener Netze's own legal page instead says the target was met in November 2024: "Dieses Ziel haben die Wiener Netze im November 2024 erfüllt."
Caveat
The operator dates the same milestone to November 2024, a month earlier than this entry states. The December date rests on a supplier publication and on a ceremonial meter swap.

Sources carrying this claim

  1. hi!tech.at — 95 Prozent aller Stromzähler von Wiener Netze sind Smart Meter, 2024-12-19
Claim 10 clm-bae20532638b2d21 quantitative
about 46,000 legacy meters still outstanding by March 2026
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The operator's press page of 30 March 2026 states the outstanding stock and the reason it must go: "Bei rund 46.000 – noch nicht getauschten – Zählern läuft die Eichfrist ab" (the calibration period is expiring on around 46,000 meters not yet exchanged), and meters that fall outside calibration rules may no longer be operated under the Austrian weights and measures act.
Caveat
An operator figure with no independent verification, published as part of an enforcement notice warning the last holdouts of disconnection or legal action.

Sources carrying this claim

  1. Wiener Netze — Letzte Chance für Umstellung auf Smart Meter (2026)
  2. Wiener Netze / OTS press release, 2026-03-30
Claim 11 clm-60081551eed2d41a quantitative
Austria's national rate stood at about 97% at the end of 2025 per regulator E-Control
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The trade report is titled "Österreich erreicht nahezu Voll-Rollout bei Smart Metern" (Austria reaches near-complete smart meter rollout) and attributes the share to the regulator E-Control, which counts metering points rather than customers. The article itself could not be opened: every edition of the publisher's site answers automated requests with a block page, so the wording was confirmed through search results rather than read on the page, and no locator string could be taken from it.
Caveat
The national figure counts metering points across Austria and is published by the regulator, not by Wiener Netze. The Vienna share it is compared against is not published by the operator at all, so the two numbers are alike in size but are not measured the same way. The reference year could not be confirmed on the page itself.

Sources carrying this claim

  1. energate messenger — Österreich erreicht nahezu Voll-Rollout bei Smart Metern

Source dossiers and revision state

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-08-21-evidence-baseline effective 2026-07-22 · created 2026-08-22

Awaiting operator and domain-expert review; publication of this revision implies neither.

sha256:41069917736d706a62adc7645221e986ed4cf2544e409bd138771ce0940e0557
11
of 11 claims mapped
6
source dossiers
3
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
Wiener Netze
Actor types
utility
Funding model
utility
Funding description
Not recorded
Cost
Not recorded
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

6 source dossiers

Wiener Netze — Letzte Chance für Umstellung auf Smart Meter (2026) wienernetze.at · 3 linked claims

Open original source ↗

Stable source ID
src-28c9c4c28d5f5604
Publisher
Name not classified · wienernetze.at
Type / language
web-page · language not classified
Published
2026-03-30
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-22
Dossier created
2026-08-22
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Current 2026 status: remaining legacy meters, enforcement phase.

Descriptive only — not page/paragraph exact
Wiener Netze / OTS press release, 2026-03-30 ots.at · 5 linked claims

Open original source ↗

Stable source ID
src-2f24a33bdde3a1e6
Publisher
Name not classified · ots.at
Type / language
web-page · language not classified
Published
2026-03-30
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-22
Dossier created
2026-08-22
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Official press release corroborating the 2026 rollout status.

Descriptive only — not page/paragraph exact
hi!tech.at — 95 Prozent aller Stromzähler von Wiener Netze sind Smart Meter, 2024-12-19 hitech.at · 6 linked claims

Open original source ↗

Stable source ID
src-e82b2d9e946e8211
Publisher
Name not classified · hitech.at
Type / language
web-page · language not classified
Published
2024-12-19
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-22
Dossier created
2026-08-22
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Independent press confirming the 95% legal target was reached December 2024.

Descriptive only — not page/paragraph exact
Iskraemeco — Digitalization of the power grid and smart metering in Wiener Netze iskraemeco.com · 2 linked claims

Open original source ↗

Stable source ID
src-00a83da0d5fa3f8b
Publisher
Name not classified · iskraemeco.com
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-22
Dossier created
2026-08-22
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Vendor project page: consortium partners, rollout start.

Descriptive only — not page/paragraph exact
Wiener Netze — Rechtliches zum Smart Meter wienernetze.at · 1 linked claim

Open original source ↗

Stable source ID
src-78d25006d3b2edad
Publisher
Name not classified · wienernetze.at
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-22
Dossier created
2026-08-22
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Legal basis: ElWOG 2010 / IME-VO 2022.

Descriptive only — not page/paragraph exact
energate messenger — Österreich erreicht nahezu Voll-Rollout bei Smart Metern energate-messenger.ch · 1 linked claim

Open original source ↗

Stable source ID
src-3c6290d0524b498f
Publisher
Name not classified · energate-messenger.ch
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-22
Dossier created
2026-08-22
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

National context via regulator E-Control: ~97% of Austrian metering points digital by end of 2025.

Descriptive only — not page/paragraph exact
Known limits of this passport
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.