Wiener Netze Smart Meter Rollout
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
How this atlas is made · What “last verified” means · What “source-checked” means · The full record behind this page
Siemens led a consortium with Landis+Gyr and Iskraemeco (selected 2017) to swap Vienna-area electricity meters for smart meters from November 2018. Wiener Netze hit Austria's 95% legal target in December 2024 and had cut remaining legacy meters to about 46,000 of ~1.6 million by March 2026; consumption data is available to customers the following day.
what does this mean?
The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →📊 Impact
~1.6 million electricity meters in Wiener Netze's service area; Austria's 95% legal smart-meter target reached in December 2024, with about 46,000 legacy meters still outstanding by March 2026 against roughly 1.6 million exchanged; Austria's national rate stood at about 97% at the end of 2025 per regulator E-Control.
Sources
Show 1 more sourcesShow fewer
📅 How old is the evidence?
Two clocks, kept apart: when this entry’s sources were published, and what has happened to its record in the atlas. Documented span: since 2018. 3 of 6 sources carry a publication date, from 19 December 2024 to 30 March 2026.
When the sources were published
- hi!tech (Siemens AG Österreich) · vendorhi!tech.at — 95 Prozent aller Stromzähler von Wiener Netze sind Smart Meter, 2024-12-19
- Wiener Netze · utilityWiener Netze — Letzte Chance für Umstellung auf Smart Meter (2026)
- APA-OTS Originaltext-Service · platformWiener Netze / OTS press release, 2026-03-30
Show your work What this page rests on and what it can’t tell you · all 11 claims with their sources · the forensic record
Evidence Passport · public beta 11 addressable claims, 6 source dossiers, one permanent baseline. The passport is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.
Inspect the claims, one by one — verbatim text, sources and caveats for all 11
The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-0b0916d3a0d917e6
quantitative
Siemens led a consortium with Landis+Gyr and Iskraemeco (selected 2017)
Sources carrying this claim
clm-0df4d1a7864ca62a
quantitative
to swap Vienna-area electricity meters for smart meters from November 2018
Sources carrying this claim
clm-26a02673e3a44f91
quantitative
Wiener Netze hit Austria's 95% legal target in December 2024
Sources carrying this claim
clm-6c9acccf8ea63d4e
quantitative
cut remaining legacy meters to about 46,000
Sources carrying this claim
clm-6aff12715b58be2c
quantitative
of ~1.6 million
Sources carrying this claim
clm-572e802c946f400f
quantitative
by March 2026
Sources carrying this claim
clm-bd752a29a051ec60
quantitative
~1.6 million electricity meters in Wiener Netze's service area
Sources carrying this claim
clm-36154b0f178a12e6
quantitative
Austria's 95% legal smart-meter target
Sources carrying this claim
clm-3e247e029960cc65
quantitative
reached in December 2024
Sources carrying this claim
clm-bae20532638b2d21
quantitative
about 46,000 legacy meters still outstanding by March 2026
Sources carrying this claim
clm-60081551eed2d41a
quantitative
Austria's national rate stood at about 97% at the end of 2025 per regulator E-Control
Sources carrying this claim
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:41069917736d706a62adc7645221e986ed4cf2544e409bd138771ce0940e0557
- 11
- of 11 claims mapped
- 6
- source dossiers
- 3
- publication dates recorded
- 0
- archives linked
- 0
- exact locators
- 0
- content captures hashed
Governance facts carried by the record
- Operator
- Wiener Netze
- Actor types
- utility
- Funding model
- utility
- Funding description
- Not recorded
- Cost
- Not recorded
- Ownership
- Not recorded
- Decision rights
- Not recorded
- Exit conditions
- Not recorded
6 source dossiers
Wiener Netze — Letzte Chance für Umstellung auf Smart Meter (2026)
- Stable source ID
src-28c9c4c28d5f5604- Publisher
- Name not classified · wienernetze.at
- Type / language
- web-page · language not classified
- Published
- 2026-03-30
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-22
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Current 2026 status: remaining legacy meters, enforcement phase.
Wiener Netze / OTS press release, 2026-03-30
- Stable source ID
src-2f24a33bdde3a1e6- Publisher
- Name not classified · ots.at
- Type / language
- web-page · language not classified
- Published
- 2026-03-30
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-22
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Official press release corroborating the 2026 rollout status.
hi!tech.at — 95 Prozent aller Stromzähler von Wiener Netze sind Smart Meter, 2024-12-19
- Stable source ID
src-e82b2d9e946e8211- Publisher
- Name not classified · hitech.at
- Type / language
- web-page · language not classified
- Published
- 2024-12-19
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-22
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Independent press confirming the 95% legal target was reached December 2024.
Iskraemeco — Digitalization of the power grid and smart metering in Wiener Netze
- Stable source ID
src-00a83da0d5fa3f8b- Publisher
- Name not classified · iskraemeco.com
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-22
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Vendor project page: consortium partners, rollout start.
- Claims linked
Wiener Netze — Rechtliches zum Smart Meter
- Stable source ID
src-78d25006d3b2edad- Publisher
- Name not classified · wienernetze.at
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-22
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Legal basis: ElWOG 2010 / IME-VO 2022.
- Claims linked
energate messenger — Österreich erreicht nahezu Voll-Rollout bei Smart Metern
- Stable source ID
src-3c6290d0524b498f- Publisher
- Name not classified · energate-messenger.ch
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-22
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
National context via regulator E-Control: ~97% of Austrian metering points digital by end of 2025.
- Claims linked
Known limits of this passport
- Publisher names and source languages have not yet been classified; domains are recorded without guessing.
- Existing source notes are descriptive locators, not page- or paragraph-exact citations.
- A missing archive, publication date or content hash is shown as null rather than inferred.
- The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Wiener Netze Smart Meter Rollout” — Vienna, Austria. The Smart City Atlas. https://1001smartcities.org/projects/vienna-smart-meter-rollout/ (last verified 2026-07-22). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.
