Wiener Netze Smart Meter Rollout
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
16 sourced claims on this page, none individually verified yet — turn on “Sources in the text” to see each one.
How this atlas is made · What “last verified” means · What “source-checked” means · The full record behind this page
✎ Corrected 5 Oct 2026 1 source added. What changed →
Austria's 95% legal target was met in December 2024, and by March 2026 only about 46,000 legacy meters were left of 1.6 million. The daily interval data those meters can record stays opt-in.
what does this mean?
The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →Part of 1001 Smart Cities — 1,216 documented projects · 🏙️ 8 more in Vienna · 🔌 Smart grid & energy guide · ⚡ Energy projects
Siemens led a consortium with Landis+Gyr and Iskraemeco (selected 2017) to swap Vienna-area electricity meters for smart meters from November 2018. Wiener Netze hit Austria's 95% legal target in December 2024 and had cut remaining legacy meters to about 46,000 of ~1.6 million by March 2026; consumption data is available to customers the following day.
📊 Impact
~1.6 million electricity meters in Wiener Netze's service area; Austria's 95% legal smart-meter target reached in December 2024, with about 46,000 legacy meters still outstanding by March 2026 against roughly 1.6 million exchanged; Austria's national rate stood at 96.9% at the end of 2024 per regulator E-Control.
🎓 Lesson
Installing the meters was only half the job: in 2026 Wiener Netze was still chasing about 46,000 hold-outs it can ultimately reach only through a power cut-off or a lawsuit, and nationally only 12.6% of households had switched on quarter-hourly readings — the setting Wiener Netze's 2026 summer grid-fee discount requires.
Sources
Show 1 more sourcesShow fewer
📅 How old is the evidence?
Two clocks, kept apart: when this entry’s sources were published, and what has happened to its record in the atlas. Documented span: since 2018. 5 of 6 sources carry a publication date, from 19 June 2024 to 30 March 2026.
When the sources were published
- Iskraemeco · vendorIskraemeco — Digitalization of the power grid and smart metering in Wiener Netze
- hi!tech (Siemens AG Österreich) · vendorhi!tech.at — 95 Prozent aller Stromzähler von Wiener Netze sind Smart Meter, 2024-12-19
- APA via vienna.at — Smart-Meter-Roll-out praktisch abgeschlossen (20 Nov 2025)
- Wiener Netze · utilityWiener Netze — Letzte Chance für Umstellung auf Smart Meter (2026)
- APA-OTS Originaltext-Service · platformWiener Netze / OTS press release, 2026-03-30
What happened to this record
- Entered the record
- 1 source added
- Sources last read
Show your work What this page rests on and what it can’t tell you · all 16 claims with their sources · the forensic record
Evidence file · public beta 16 addressable claims, 6 source dossiers, one permanent baseline. The file is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.
Inspect the claims, one by one — verbatim text, sources and caveats for all 16
The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-0b0916d3a0d917e6
quantitative
Siemens led a consortium with Landis+Gyr and Iskraemeco (selected 2017)
Sources carrying this claim
clm-0df4d1a7864ca62a
quantitative
to swap Vienna-area electricity meters for smart meters from November 2018
Sources carrying this claim
clm-26a02673e3a44f91
quantitative
Wiener Netze hit Austria's 95% legal target in December 2024
Sources carrying this claim
clm-6c9acccf8ea63d4e
quantitative
cut remaining legacy meters to about 46,000
Sources carrying this claim
clm-6aff12715b58be2c
quantitative
of ~1.6 million
Sources carrying this claim
clm-572e802c946f400f
quantitative
by March 2026
Sources carrying this claim
clm-bd752a29a051ec60
quantitative
~1.6 million electricity meters in Wiener Netze's service area
Sources carrying this claim
clm-36154b0f178a12e6
quantitative
Austria's 95% legal smart-meter target
Sources carrying this claim
clm-3e247e029960cc65
quantitative
reached in December 2024
Sources carrying this claim
clm-bae20532638b2d21
quantitative
about 46,000 legacy meters still outstanding by March 2026
Sources carrying this claim
clm-5242f20a7de5e0ba
quantitative
Austria's national rate stood at 96.9% at the end of 2024 per regulator E-Control
Sources carrying this claim
clm-9ebc14a41f134ced
descriptive
consumption data is available to customers the following day
Sources carrying this claim
clm-63a4690d5e458455
quantitative
in 2026 Wiener Netze was still chasing about 46,000 hold-outs
Sources carrying this claim
clm-fbc039346b2b08ec
descriptive
it can ultimately reach only through a power cut-off or a lawsuit
Sources carrying this claim
clm-e95c9d9284746906
quantitative
nationally only 12.6% of households had switched on quarter-hourly readings
Sources carrying this claim
clm-e10a23c08334f5e1
quantitative
the setting Wiener Netze's 2026 summer grid-fee discount requires
Sources carrying this claim
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:c603ae12632567b7fe422ebe709107b2df48a1c7bf641eee7a97adabc9f68883
- 16
- of 16 claims mapped
- 6
- source dossiers
- 5
- publication dates recorded
- 0
- archives linked
- 0
- exact locators
- 0
- content captures hashed
Governance facts carried by the record
- Operator
- Wiener Netze
- Actor types
- utility
- Funding model
- utility
- Funding description
- Not recorded
- Cost
- Not recorded
- Ownership
- Not recorded
- Decision rights
- Not recorded
- Exit conditions
- Not recorded
6 source dossiers
Wiener Netze — Letzte Chance für Umstellung auf Smart Meter (2026)
- Stable source ID
src-28c9c4c28d5f5604- Publisher
- Name not classified · wienernetze.at
- Type / language
- web-page · language not classified
- Published
- 2026-03-30
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-10-05
- Dossier created
- 2026-10-05
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Current 2026 status: remaining legacy meters, enforcement phase.
Wiener Netze / OTS press release, 2026-03-30
- Stable source ID
src-2f24a33bdde3a1e6- Publisher
- Name not classified · ots.at
- Type / language
- web-page · language not classified
- Published
- 2026-03-30
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-10-05
- Dossier created
- 2026-10-05
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Official press release corroborating the 2026 rollout status.
hi!tech.at — 95 Prozent aller Stromzähler von Wiener Netze sind Smart Meter, 2024-12-19
- Stable source ID
src-e82b2d9e946e8211- Publisher
- Name not classified · hitech.at
- Type / language
- web-page · language not classified
- Published
- 2024-12-19
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-10-05
- Dossier created
- 2026-10-05
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Independent press confirming the 95% legal target was reached December 2024.
Iskraemeco — Digitalization of the power grid and smart metering in Wiener Netze
- Stable source ID
src-00a83da0d5fa3f8b- Publisher
- Name not classified · iskraemeco.com
- Type / language
- web-page · language not classified
- Published
- 2024-06-19
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-10-05
- Dossier created
- 2026-10-05
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Vendor project page: consortium partners, rollout start.
- Claims linked
Wiener Netze — Rechtliches zum Smart Meter
- Stable source ID
src-78d25006d3b2edad- Publisher
- Name not classified · wienernetze.at
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-10-05
- Dossier created
- 2026-10-05
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Legal basis: ElWOG 2010 / IME-VO 2022.
- Claims linked
APA via vienna.at — Smart-Meter-Roll-out praktisch abgeschlossen (20 Nov 2025)
- Stable source ID
src-84e8f5501cfa8f12- Publisher
- Name not classified · vienna.at
- Type / language
- web-page · language not classified
- Published
- 2025-11-20
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-10-05
- Dossier created
- 2026-10-05
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Reports E-Control's final monitoring report: 96.9% of Austrian metering points equipped at the end of 2024; about 760,000 households (12.6%) use quarter-hourly readings (opt-in).
- Claims linked
Known limits of this file
- Publisher names and source languages have not yet been classified; domains are recorded without guessing.
- Existing source notes are descriptive locators, not page- or paragraph-exact citations.
- A missing archive, publication date or content hash is shown as null rather than inferred.
- The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Wiener Netze Smart Meter Rollout” — Vienna, Austria. The Smart City Atlas. https://1001smartcities.org/projects/vienna-smart-meter-rollout/ (last verified 2026-10-05). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.