clm-7a99d72948cef6d9
quantitative
Metroplús, Medellín's bus rapid transit corridor, opened on 22 December 2011 with dedicated lanes and fare integration into the Cívica smart card shared with the Metro and tram
Permanent project revision
Revision 2026-08-27-claims-and-sources · effective 2026-07-30
Superseded. A later revision exists: 2026-08-27-source-dating →
Created the first structured Evidence Passport with 6 claims and 5 source dossiers.
sha256:3756e5855cfb26f990cb16188cdb35f97c172080e18d2f4ad3d236cca29901f9
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-7a99d72948cef6d9
quantitative
Metroplús, Medellín's bus rapid transit corridor, opened on 22 December 2011 with dedicated lanes and fare integration into the Cívica smart card shared with the Metro and tram
clm-c7f281b8ab81fa06
descriptive
A GPS telematics platform tracks each bus's position, speed and engine variables — oil pressure and temperature among them — for maintenance dispatch, described by the vendor and the maintenance contractor rather than by the operator
clm-f90ef3b280d956c6
quantitative
Electrification began in 2018; 64 electric buses reached the port of Buenaventura in August 2019, 17 of them for the Avenida 80 line, and were due into service that September
clm-96a9fd3929c62fd0
descriptive
the telematics are documented in a supplier's case study quoting the maintenance contractor
clm-e4283fa33d04693c
quantitative
the only quantified benefit anywhere in the record is 3,666 tonnes of CO2 a year, stated for the electric buses while they were still standing at the port
clm-1268adb4021aa874
descriptive
No ridership, journey-time or reliability figure has been published for the corridor
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
Erratum on this revision's envelope. The snapshot, its hash and its permanent link are untouched.
sha256:3756e5855cfb26f990cb16188cdb35f97c172080e18d2f4ad3d236cca29901f9
src-ce815e4f4f42a9e6The operator's own site.
src-39b1c8d12c40abc5Confirms Dec 22, 2011 Line 1 launch with fare integration into SITVA via the Cívica card.
src-89cfcac1325998d5BYD KF1 pilot electric articulated bus, commercial service from April 3, 2018.
src-9efa7d8ba7ea7a4f64 BYD electric standard buses (90-passenger) arrive September 2019 for Metroplús corridors.
src-db2c8e612a63cafbA vendor case study built on an interview with the maintenance contractor that runs the Metroplús fleet.