has handled cargo and ferry traffic since NEOM took over the old Duba Port in 2022
Permanent project revision
Revision 2026-10-05-baseline · effective 2026-10-05
Current revision. This is the snapshot used by the live entity page.
Created the first structured Evidence Passport with 14 claims and 9 source dossiers.
sha256:f2cf83c1484c4ba5336eea1a4287d4f28a68856edf6aad3f0807098b3bd4505e
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-d191cee224e39949
quantitative
has handled cargo and ferry traffic since NEOM took over the old Duba Port in 2022
clm-47c624d49ea88909
quantitative
Construction of the new port was 68% complete, by NEOM's count, in December 2025
clm-86eb04eacbec2e5a
quantitative
In May 2025 the port received Saudi Arabia's first fully automated, remote-controlled cranes
clm-709c08963f8c8f16
descriptive
built by ZPMC and coordinated by a fleet-management system that uses machine learning
clm-4f998f8b893922e8
quantitative
Phase 2 earthworks were under way by August 2025
clm-4d6d89c96954ac8c
quantitative
toward a 1.5-million-TEU target
clm-f2618f759706a5e9
quantitative
Terminal 1, first due in 2025 and then 2026, will only ramp up in 2027
clm-809ec78291cf235f
quantitative
IMF data cited in August 2026 put the port at 0.3% of Saudi imports
clm-a80c95c3a2def92b
descriptive
As the wider NEOM programme was cut back
clm-3376631d5dc8f066
descriptive
the head of its owner, the Public Investment Fund, called Oxagon 'the fundamental part of Neom'
clm-5303accc189c11f6
descriptive
A port first used to supply a giga-project
clm-65f627197ee3b2af
descriptive
as NEOM was cut back, its owner singled out Oxagon
clm-41d420483b7671c1
descriptive
with no rail link and major cities days away by truck
clm-f0a18b942f497f73
quantitative
the port played a statistically insignificant role when Gulf shipping was disrupted in 2026
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:f2cf83c1484c4ba5336eea1a4287d4f28a68856edf6aad3f0807098b3bd4505e
src-ef402edb901de395Official announcement: interim Port of NEOM has handled container, general, project and bulk cargo plus RoPax/ferry services since being handed over in 2022.
src-427a66f538749426May 2025: first delivery (3 STS, 4 eRTG cranes) of automated, remote-controlled equipment, reported as a first for Saudi Arabia, ahead of the 2026 terminal launch.
src-15ac6b9d70a9f032Trade press, Aug 2025: ZPMC supplies all 10 STS/30 eRTG cranes; Fleet Management System uses machine learning; Siemens/Mevea digital-twin pilot for predictive maintenance; full end-to-end automation targeted for 2028.
src-a77fec9dc3febeedDecember 2025: construction 68% complete; current interim capacity about 250,000 TEU/year; target 1.5 million TEU by 2030; full container-terminal operations set to begin 2026.
src-f3cdcee1418cc558August 2025: dredging contractor Deme Group confirms phase-2 earthmoving under way, major dredging planned for later 2025.
src-cba80d8dca497e80T1 slipped from 2025 to 2026 with ramp-up in 2027; 0.3% of Saudi imports (IMF Port Watch); statistically insignificant role during the 2026 Gulf shipping disruption; no rail connection.
src-63adf667019ca397PIF governor called Oxagon 'the fundamental part of Neom' as the wider programme was reprioritised; port has lacked a rail link since operations began in 2022.
src-7acb331b9ee024f4PIF spending cuts, budgets down as much as 60%; 'what survives the cull is the port, the plant, and the data centers'.
src-4d740f796e1d4b7cOperator page: current services include RoRo ferry operations; new container terminal launches in 2026 with 2027 its first full year, building to 1.5 million TEU.