clm-6f97e6123019bc66
quantitative
Osaka Station's underground Umekita platforms opened on 18 March 2023
Permanent project revision
Revision 2026-08-22-evidence-baseline · effective 2026-07-26
Current revision. This is the snapshot used by the live entity page.
Created the first structured Evidence Passport with 14 claims and 7 source dossiers.
sha256:1fafa665b9e51492c0f1c05eb259ada01f31e9235c6ae54906062f472335e973
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-6f97e6123019bc66
quantitative
Osaka Station's underground Umekita platforms opened on 18 March 2023
clm-6b96b2fdcf94d4f1
descriptive
beneath the Grand Green Osaka redevelopment
clm-bc3160af7cf7b336
quantitative
Track 21 got a platform screen door
clm-747f699a53406cc2
descriptive
JR West and Nabtesco describe as a world first
clm-1870a5bc5d6feaf8
descriptive
a floor-to-ceiling glass wall of parent and child doors
clm-c794786cceb50b99
descriptive
slides along the platform edge so its openings match whatever train arrives, whatever its door layout
clm-48462f0d4e7a7656
descriptive
with train information shown on the door panels
clm-e3f939474f9d936f
descriptive
A face-recognition ticket gate opened the same day
clm-5fd4e3d4f3cea832
descriptive
but only as a monitor trial for holders of an ICOCA commuter pass covering Osaka–Shin-Osaka
clm-8c28175702015cb2
descriptive
The world-first door was fitted to one of four platform edges
clm-26bc1de43361c45d
descriptive
the face-recognition gate is still a trial
clm-3ecab41b5fec22a8
quantitative
the futuristic arch-shaped gate was retired in February 2026
clm-1fa7876ec5864fd9
descriptive
replaced by ordinary gates with two cameras bolted on
clm-d932bf2143e6d603
descriptive
chosen for accuracy at rush hour rather than for show
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:1fafa665b9e51492c0f1c05eb259ada01f31e9235c6ae54906062f472335e973
src-98ef63b33902c9b3Co-developer with JR West Group and JR West Techsia: full-height all-glass parent and child doors on ceiling-hung hanger rollers that adjust to trains with varying door positions, with embedded digital signage. Source of the world-first wording.
src-5d7f625274e6e8ccOpening 18 March 2023, tracks 21 to 24; only track 21 has the movable doors; face-recognition gate limited to commuter-pass monitors; variable signage and personal wayfinding markers.
src-c3fc3ebb8bf4836fJR West press briefing: the world-first full-screen platform door on one track first, plus personalised and general digital variable signs.
src-c10f8b0c423da37dCurrency check: from 2 March 2026 standard gates with two top-mounted cameras replace the display-heavy arch gate, one lane each; still a monitor trial.
src-495cd785944623ebOperator source for the March 2026 change and continued monitor recruitment. PDF; retrieved but not machine-readable in review, content corroborated by trade press.
src-0a2f9bc424954094English trade press: the 18 March 2023 start and pre-registered face matching; notes an earlier Osaka Metro deployment in November 2022, which is why no national first is claimed here.
src-6423672b9d358854Public-agency context for the redevelopment above the station. Used only for geographic context: no smart-district claim is made, because none could be sourced.