The IACE puts the direct cost of the programme's delays to the state budget at roughly 100 million dinars a year in extra spending and unearned operating revenue.
Permanent project revision
Revision 2026-08-20-source-dates-2 · effective 2026-08-07
Current revision. This is the snapshot used by the live entity page.
Record publication (and where stated, revision) dates for this entry's sources.
sha256:983292343e1be43a91fb737192a29672593bd4a5425d1d562565788f0d03d308
replace /snapshot/projectFingerprint — Updated projectFingerprint to the current sourced project record.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-24d3a80dd6a6f875
quantitative
The IACE puts the direct cost of the programme's delays to the state budget at roughly 100 million dinars a year in extra spending and unearned operating revenue.
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:983292343e1be43a91fb737192a29672593bd4a5425d1d562565788f0d03d308
src-2e1c22926e44e738Carries the technical scope and the contract: 'Trainguard 100 for ETCS Level 1', 28 on-board units, three Simis W electronic interlockings, the Vicos operations control system, UGSK 3 track vacancy detection, equipping of the operations control centre and staff training, for lines D and E; €145M for the consortium (Siemens, Colas Rail, Somatra); client Réseau Ferroviaire Rapide; commissioning 'scheduled for the end of 2016' — the source of the seven-year slip stated in the entry.
src-565e16c0154d0ccbProject manager since 2007, lead of the project management consortium with Studi. Carries the delivered systems ('ETCS-1 signalling', '25,000-volt power supply', 'operation control centre'), the line data (Line D 13.5 km / 9 stations Tunis-Barcelone–Gobâa; Line E phase 1 9 km / 7 stations) and the network target of 85 km / 5 lines, 18.5 km in service. Operator-side source. Note the discrepancy on Line D's length: the French Treasury states 19 km, so no length is asserted in the entry.
src-0f554b3863ee4af5Carries the in-service date of Line E (20 March 2023), the seven stations, and the delivered package 'ETCS-1 signalling, GSM-R telecommunications, a 25,000-volt power supply' plus a 'centralised control station'. Also the source of the design figures '2,408 passengers per train, 1 train every 7 minutes' — labelled in the entry as design capacity, not demand.
src-05086716edd055fbCarries the Line D opening date (Saturday 25 January 2025), 'more than 10,000 passengers transported on the first day', the design figure of 'more than 20,000 passengers' with trains 'capable of carrying up to 2,400', and the ridership figure used in the entry: '7 million passengers recorded in 2024 on line E alone'. This contradicts a widely echoed '25 million' that no fetched source supports; the lower, sourced figure is used.
src-7f35bc3446cb93edThe independent counterweight, reporting an assessment by the Institut Arabe des Chefs d'Entreprises (IACE): 'les pertes directes pour le budget de l'État à environ 100 millions de dinars par an' from extra spending and unearned operating revenue; 'un conflit institutionnel et une nette séparation entre la Société du RFR, en tant que maître d'ouvrage, et la Société Nationale des Chemins de Fer Tunisiens (SNCFT), en tant qu'exploitant effectif'; and 'une forte dégradation de la transparence et de la communication financière', with the newest public data dating from 2014. Also the second, non-Wikipedia confirmation that SNCFT is the operator.
src-f0b1f15c66011677Carries the cost and funding line: 'Le projet des lignes D et E du RFR, d'un coût total de 550 millions d'euros incluant le matériel roulant, a été financé pour 60% par des bailleurs de fonds internationaux', with AFD €50M, BEI €202M, KfW €112M and an EU grant of €28M, and the 25 January 2025 opening with Systra and Colas Rail. Its 'jusque 600 000 passagers/jour seront à terme transportés' is a long-term projection for the full network and is deliberately not used as a demand figure.
src-9e73db992e541e39Carries the Line D station list used for the scope test — 'Tunis Barcelone, Mellassine, Raoudha, Le Bardo, Bortal, Manouba, El-Bortokal, Gobâa 1 et Gobâa 2' — i.e. the line runs from central Tunis into Manouba governorate, which is why the entry is scale: regional. Also gives the cost as 1,360 million dinars and the 40% state / 60% co-financed split (BEI, AFD, KfW, EU grant of 28 MD).