Permanent project revision

Sydney Water's Smart Meter Pilot and Rollout Plan

Revision 2026-08-20-source-dates-r2 · effective 2026-08-12

Current revision. This is the snapshot used by the live entity page.

unreviewed

Record the publication date of each source that states one; sources that publish no date are marked null.

sha256:e90ee41bf828a327f22e2818248983593c1c1647892b784ac63263d9a4603c5c

Change set

  • replace /snapshot/projectFingerprint — Updated projectFingerprint to the current sourced project record.
  • replace /snapshot/sources — Updated sources to the current sourced project record.
3
of 3 claims mapped
4
source dossiers
1
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Claims, one by one

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-67cd461a72fa5a6c quantitative
Sydney Water piloted wireless smart meters, with 7,500 installed across four suburbs by 2023; the operator reported a $70 average bill reduction and 28,000L saved after 313 leak alerts.
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Utility Magazine reports the $2 million pilot, 7,500 installations in Liverpool, Beecroft, Bellevue Hill and Kenthurst, a $70 average bill reduction, 28,000L saved and 313 leak notifications in 2023.
Caveat
The savings are Sydney Water's reported pilot results carried by trade press, not an independent evaluation.

Sources carrying this claim

  1. Utility Magazine — Sydney Water shares results of smart metre rollout
Claim 2 clm-b2a96489e9a26f78 quantitative
Sydney Water plans to replace 1.6 million mechanical meters across Greater Sydney
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Sydney Water's smart-meter page says 1.6 million mechanical meters across Greater Sydney will be replaced over coming years.
Caveat
This is the utility's stated plan, not a completed deployment.

Sources carrying this claim

  1. Sydney Water — Smart meters
Claim 3 clm-ce84100f28987e30 quantitative
in January–February 2025, the utility was still using a market-sounding RFI to choose a prime-contractor delivery model for the mass replacement.
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The NSW procurement record dates the RFI to 24 January–21 February 2025 and says it sought market information on a prime-contractor model covering some or all elements of the 1.6 million-meter mass replacement.
Caveat
This is a dated procurement-stage statement; it makes no claim about contractor status after February 2025.

Sources carrying this claim

  1. buy.nsw — Sydney Water Smart Metering Prime Contractor Model RFI

Source dossiers and revision state

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-08-20-source-dates-r2 effective 2026-08-12 · created 2026-08-21

Awaiting operator and domain-expert review; publication of this revision implies neither.

sha256:e90ee41bf828a327f22e2818248983593c1c1647892b784ac63263d9a4603c5c
3
of 3 claims mapped
4
source dossiers
1
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
Sydney Water
Actor types
utility, regional-government
Funding model
utility
Funding description
Not recorded
Cost
Not recorded
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

4 source dossiers

Sydney Water — Smart meters sydneywater.com.au · 1 linked claim

Open original source ↗

Stable source ID
src-7815d51b7fa26433
Publisher
Name not classified · sydneywater.com.au
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-12
Dossier created
2026-08-21
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Operator's own description of the 1.6M-meter target, technology and leak alerts.

Descriptive only — not page/paragraph exact
Utility Magazine — Sydney Water shares results of smart metre rollout utilitymagazine.com.au · 1 linked claim

Open original source ↗

Stable source ID
src-f860cb946b11cb4b
Publisher
Name not classified · utilitymagazine.com.au
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-12
Dossier created
2026-08-21
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Pilot scale ($2M, 7,500 meters, four suburbs) and measured savings.

Descriptive only — not page/paragraph exact
buy.nsw — Sydney Water Smart Metering Prime Contractor Model RFI buy.nsw.gov.au · 1 linked claim

Open original source ↗

Stable source ID
src-a8983b7aaf333a32
Publisher
Name not classified · buy.nsw.gov.au
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-12
Dossier created
2026-08-21
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Government procurement listing for the January–February 2025 market-sounding RFI on a prime-contractor delivery model for the 1.6M-meter mass replacement.

Descriptive only — not page/paragraph exact
Australian Water Association — Using digital meter leak notifications to support customers awa.asn.au · background

Open original source ↗

Stable source ID
src-0d61ad0c8d4779a9
Publisher
Name not classified · awa.asn.au
Type / language
web-page · language not classified
Published
2023-07-27
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-12
Dossier created
2026-08-21
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Independent corroboration of the pilot's scale-up (175 → 550 → 3,200 customers by April 2023).

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Known limits of this passport
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.