Permanent project revision

Copenhagen's LED Streetlight Retrofit & Remote Control Network

Revision 2026-08-20-source-dates · effective 2026-07-23

Superseded. A later revision exists: 2026-08-26-claim-mapping →

unreviewed

Created the first structured Evidence Passport with 1 claim and 5 source dossiers.

sha256:64c19df626f1829b8e52e022e6a51f87a42d9749faede645054b81d544eb17da

Change set

  • add /evidencePassport — Added claim-level evidence mapping and source dossiers.
  • add /revisionHistory — Established a permanent, hash-addressed baseline revision.
1
of 1 claims mapped
5
source dossiers
3
publication dates recorded
1
archives linked
0
exact locators
0
content captures hashed

Claims, one by one

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-4fc0eec071497b0b quantitative
Street-lighting energy use cut by roughly 55–57%, meeting the contract's minimum efficiency target
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The impact states the energy-saving figure is independently corroborated by Danish trade press.
Caveat
The vendor-reported figure of about 3,200 tonnes of CO2 saved per year is not independently audited.

Sources carrying this claim

  1. Ingeniøren — "København køber LED-gadelamper for en kvart milliard"

Source dossiers and revision state

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-08-20-source-dates effective 2026-07-23 · created 2026-08-20

Awaiting operator and domain-expert review; publication of this revision implies neither.

sha256:64c19df626f1829b8e52e022e6a51f87a42d9749faede645054b81d544eb17da
1
of 1 claims mapped
5
source dossiers
3
publication dates recorded
1
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
Citelum (contracted by the City of Copenhagen)
Actor types
private
Funding model
ppp
Funding description
Not recorded
Cost
DKK 266.3M contract
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

5 source dossiers

Københavns Kommune — Teknik- og Miljøudvalget, referat 04.11.2013 (Udskiftning af gadebelysning) kk.dk · background

Open original source ↗

Stable source ID
src-0f194721f8285b36
Publisher
Name not classified · kk.dk
Type / language
web-page · language not classified
Published
2013-02-25
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-23
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Official city committee minutes approving the Citelum contract: ~20,000 fixtures/~8,000 poles, DKK 266.3m budget, 57% energy-saving requirement with penalty clause.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Ingeniøren — "København køber LED-gadelamper for en kvart milliard" ing.dk · 1 linked claim

Open original source ↗

Stable source ID
src-790dd993c0151b4b
Publisher
Name not classified · ing.dk
Type / language
web-page · language not classified
Published
2014-03-03
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-23
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
Open archived copy ↗ · 2026-01-17
Content hash
No captured content hash
Locator
Open the recorded source note

Independent Danish engineering trade press: tender details, penalty clause, cycling-responsive dimming.

Descriptive only — not page/paragraph exact
Energy Supply — "Ny aftale om gadebelysning til 250 mio. kr. i København" energy-supply.dk · background

Open original source ↗

Stable source ID
src-def54613181b0eb3
Publisher
Name not classified · energy-supply.dk
Type / language
web-page · language not classified
Published
2013-10-23
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-23
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Independent Danish energy trade press: contract scope, cost, ~50% energy/CO2 reduction.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Citelum — Copenhagen reference case study citelum.com · background

Open original source ↗

Stable source ID
src-4ffc629e696d1ff1
Publisher
Name not classified · citelum.com
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-23
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Operator's own case study: central management platform, remote dimming/scheduling, CO2/energy savings (vendor-reported).

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Thorn Lighting — Road Lighting Solution for Copenhagen thornlighting.com · background

Open original source ↗

Stable source ID
src-890a4f8abb3843e9
Publisher
Name not classified · thornlighting.com
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-23
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

LED lantern manufacturer case study: light-point counts, communication-network rollout timeline.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Known limits of this passport
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.