Permanent project revision

Copenhagen's LED Streetlight Retrofit & Remote Control Network

Revision 2026-08-27-source-dating · effective 2026-07-23

Current revision. This is the snapshot used by the live entity page.

unreviewed

Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

sha256:e2c6fa53b3fd9a9de5b6aaa13fb76c67e48c9055eac5842a2d54a494ccc0284e

Change set

  • replace /snapshot/projectFingerprint — Updated projectFingerprint to the current sourced project record.
  • replace /snapshot/sources — Updated sources to the current sourced project record.
9
of 9 claims mapped
6
source dossiers
4
publication dates recorded
1
archives linked
0
exact locators
0
content captures hashed

Claims, one by one

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-f7c82024f4a5d787 quantitative
Copenhagen replaced about 20,000 streetlights and 8,000 poles — roughly half the city's stock — with LED lanterns under a DKK 266.3m Citelum contract approved in November 2013 and carried out from 2014
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The committee minutes set out the scope, the budget and the timetable; the trade press covers the tender.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Københavns Kommune — Teknik- og Miljøudvalget, referat 04.11.2013 (Udskiftning af gadebelysning)
  2. Ingeniøren — "København køber LED-gadelamper for en kvart milliard"
Claim 2 clm-4de7bb3ac2291a34 descriptive
The contract obliged the consortium to guarantee an energy saving, with a penalty clause behind it
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The minutes state that the contract requires the winning consortium to guarantee an energy saving; the trade report describes the penalty clause attached to it.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Københavns Kommune — Teknik- og Miljøudvalget, referat 04.11.2013 (Udskiftning af gadebelysning)
  2. Ingeniøren — "København køber LED-gadelamper for en kvart milliard"
Claim 3 clm-b4c32b2dc320a293 descriptive
A wireless network lets the city remotely dim, schedule and monitor each lamp, brightening for approaching cyclists
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The trade report describes the cycling-responsive dimming; the operator and the lantern manufacturer describe the central management platform and the communication network.
Caveat
The platform description comes from the operator's and the manufacturer's own case studies.

Sources carrying this claim

  1. Ingeniøren — "København køber LED-gadelamper for en kvart milliard"
  2. Citelum — Copenhagen reference case study
  3. Thorn Lighting — Road Lighting Solution for Copenhagen
Claim 4 clm-967cbdea35d181c7 descriptive
the renewal replaced the switch cabinets outright, which the city called a precondition for controlling the lighting intelligently at all
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The minutes state that the lighting solution involves a complete replacement of the switch cabinets and that this is a precondition for the municipality using more intelligent control of road lighting in future.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Københavns Kommune — Teknik- og Miljøudvalget, referat 04.11.2013 (Udskiftning af gadebelysning)
Claim 5 clm-381c8d64225577a3 quantitative
The city's technical department said in 2017 that street lighting was using more than 55 per cent less energy than in 2010, with the new lanterns 70-80 per cent more efficient than the ones they replaced, and put the annual electricity saving from the renewal at DKK 12.8m
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The 2017 report quotes the city's centre head on all three figures.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Ingeniøren — "Københavns Kommune: Stor fortjeneste ved LED-lys på gaderne" (27 May 2017)
Claim 6 clm-1d0041bb95cc3364 quantitative
the city's own papers attribute the saving since 2010 to two programmes — the Citelum contract and a separate DKK 55m appropriation from 2011
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The minutes state in as many words that the total electricity saving on street lighting since 2010 comes from two sources: the new Citelum contract and a DKK 55m appropriation set aside by the committee in April 2011.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Københavns Kommune — Teknik- og Miljøudvalget, referat 04.11.2013 (Udskiftning af gadebelysning)
Claim 7 clm-fcc79220ba9b0c5f quantitative
the 57 per cent that circulates with this project is the reduction the contract obliged the consortium to guarantee by 2016, not an independently measured result
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The 57 per cent appears in the 2013 minutes as what the guaranteed saving secures — a reduction from 19.5 GW in 2010 to 8.3 GW in 2016 — three years before the endpoint it describes.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Københavns Kommune — Teknik- og Miljøudvalget, referat 04.11.2013 (Udskiftning af gadebelysning)
Claim 8 clm-dbc91297de525a63 quantitative
The 57 per cent in the 2013 committee papers is what the winning consortium was contractually required to guarantee, with a penalty clause behind it
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The minutes tie the 57 per cent to the consortium's guarantee; the trade report describes the penalty clause.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Københavns Kommune — Teknik- og Miljøudvalget, referat 04.11.2013 (Udskiftning af gadebelysning)
  2. Ingeniøren — "København køber LED-gadelamper for en kvart milliard"
Claim 9 clm-25e8fe36297ad13f quantitative
the more-than-55 per cent the city quoted in 2017 is what it says it achieved against 2010
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The 2017 quotation is the city's own statement of what it saves compared with 2010.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Ingeniøren — "Københavns Kommune: Stor fortjeneste ved LED-lys på gaderne" (27 May 2017)

Source dossiers and revision state

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-08-27-source-dating effective 2026-07-23 · created 2026-08-27

Awaiting operator and domain-expert review; publication of this revision implies neither.

sha256:e2c6fa53b3fd9a9de5b6aaa13fb76c67e48c9055eac5842a2d54a494ccc0284e
9
of 9 claims mapped
6
source dossiers
4
publication dates recorded
1
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
Citelum (contracted by the City of Copenhagen)
Actor types
private
Funding model
ppp
Funding description
Not recorded
Cost
DKK 266.3M contract
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

6 source dossiers

Københavns Kommune — Teknik- og Miljøudvalget, referat 04.11.2013 (Udskiftning af gadebelysning) kk.dk · 6 linked claims

Open original source ↗

Stable source ID
src-0f194721f8285b36
Publisher
Name not classified · kk.dk
Type / language
web-page · language not classified
Published
2013-11-04
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-23
Dossier created
2026-08-27
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Minutes of the Technical and Environmental Committee meeting of 4 November 2013 approving the Citelum contract: about 20,000 lanterns and 8,000 poles over 2014-15, a DKK 266.3m budget across 2013-15, a guaranteed energy saving of about 57 per cent by 2016 with a penalty clause, and an explicit note that the total saving since 2010 comes from two sources — this contract and a separate DKK 55m appropriation made in April 2011.

Descriptive only — not page/paragraph exact
Ingeniøren — "København køber LED-gadelamper for en kvart milliard" ing.dk · 4 linked claims

Open original source ↗

Stable source ID
src-790dd993c0151b4b
Publisher
Name not classified · ing.dk
Type / language
web-page · language not classified
Published
2014-03-03
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-23
Dossier created
2026-08-27
Retrieved copy
No local capture recorded
Archive
Open archived copy ↗ · 2026-01-17
Content hash
No captured content hash
Locator
Open the recorded source note

Independent Danish engineering trade press: tender details, penalty clause, cycling-responsive dimming.

Descriptive only — not page/paragraph exact
Energy Supply — "Ny aftale om gadebelysning til 250 mio. kr. i København" energy-supply.dk · background

Open original source ↗

Stable source ID
src-def54613181b0eb3
Publisher
Name not classified · energy-supply.dk
Type / language
web-page · language not classified
Published
2013-10-23
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-23
Dossier created
2026-08-27
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Independent Danish energy trade press: contract scope, cost, ~50% energy/CO2 reduction.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Citelum — Copenhagen reference case study citelum.com · 1 linked claim

Open original source ↗

Stable source ID
src-4ffc629e696d1ff1
Publisher
Name not classified · citelum.com
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-23
Dossier created
2026-08-27
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Operator's own case study: central management platform, remote dimming/scheduling, CO2/energy savings (vendor-reported). No publication date is recorded: the page did not answer when this entry was checked.

Descriptive only — not page/paragraph exact
Thorn Lighting — Road Lighting Solution for Copenhagen thornlighting.com · 1 linked claim

Open original source ↗

Stable source ID
src-890a4f8abb3843e9
Publisher
Name not classified · thornlighting.com
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-23
Dossier created
2026-08-27
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

LED lantern manufacturer case study: light-point counts, communication-network rollout timeline. The page states no publication date.

Descriptive only — not page/paragraph exact
Ingeniøren — "Københavns Kommune: Stor fortjeneste ved LED-lys på gaderne" (27 May 2017) ing.dk · 2 linked claims

Open original source ↗

Stable source ID
src-8a7e277ad6f17ee2
Publisher
Name not classified · ing.dk
Type / language
web-page · language not classified
Published
2017-05-27
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-23
Dossier created
2026-08-27
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Danish engineering trade press after completion, quoting the city's centre head Steffen Rasmussen: street lighting uses more than 55 per cent less energy than in 2010, the new lanterns are 70-80 per cent more efficient than their predecessors, and the 19,000-lantern renewal is estimated to save DKK 12.8m a year in electricity. The figures are the city's own, carried by an independent outlet.

Descriptive only — not page/paragraph exact
Known limits of this passport
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.