Stattus4 installed AI-analyzed pressure sensors on water meters
Permanent project revision
Revision 2026-08-22-evidence-baseline · effective 2026-08-05
Current revision. This is the snapshot used by the live entity page.
Created the first structured Evidence Passport with 10 claims and 3 source dossiers.
sha256:8da19fb2231d875b418ed8f7ffefad349afa19785eb2096cabcce73171ac4f6a
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-0732319ee3bbb778
quantitative
Stattus4 installed AI-analyzed pressure sensors on water meters
clm-ccac223fbac71c5d
quantitative
in a 22km pilot in Curitiba's Alto Boqueirão and Tatuquara neighborhoods to flag hidden leaks
clm-a481b3ebdd30936b
quantitative
From January-August 2023
clm-7cb2c43ebcdd0308
quantitative
Alto Boqueirão's losses fell about 69%, from roughly 650 litres a day to about 200
clm-c4e9e35f6d42e4fa
quantitative
leak-investigation time dropped from up to 180 days to about three
clm-01bf545f8ea3df9a
quantitative
Sanepar then contracted a 2,500km southern-Curitiba expansion
clm-fe383bff06f6c5d7
quantitative
Alto Boqueirão's losses fell about 69% — from roughly 650 litres a day to about 200, the utility publishing the figure without saying per what — over the January-August 2023 pilot
clm-b7adb966e85a023f
quantitative
per Sanepar and Stattus4's self-reported figures
clm-e003a7dd2eadf947
descriptive
A second pilot section in Tatuquara showed a smaller drop from a much lower starting level
clm-5c6fdabd9e9f39de
descriptive
Sanepar's own releases give conflicting figures for it
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:8da19fb2231d875b418ed8f7ffefad349afa19785eb2096cabcce73171ac4f6a
src-ec438fc15183260bDirect fetch returned 404/blocked; content and figures confirmed via search-engine indexing and cross-matched against independent mirrors (saneamentobasico.com.br, saneparstartups.com.br). Covers the Jan-Aug 2023 pilot results and the 2,500km expansion contract.
src-9cd1b68298758ffcDirectly fetched. Confirms Alto Boqueirão 69% (650→~200 L/d), the 180-day-to-3-day leak-investigation improvement, and the two-year Startup Law contract for the 2,500km expansion. Gives Tatuquara as 49% (conflicts with the 41% figure attributed to the state government source).
src-0571b6639e99e8e7Directly fetched, vendor's own account of the same pilot (described as Sector A/Sector B rather than by neighborhood name); confirms the ~70%/49% loss-recovery order of magnitude and the >2,500km 2024 expansion. Vendor source, used only to corroborate figures already found in press coverage.