The Johannesburg Roads Agency, wholly owned by the City, runs the city's traffic signals
Permanent project revision
Revision 2026-10-11-baseline · effective 2026-10-11
Current revision. This is the snapshot used by the live entity page.
Created the first structured Evidence Passport with 12 claims and 9 source dossiers.
sha256:074b96f94835b67c5204e0aa5756781dadff208ab9db3ff3d66a7a905e1413cb
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-192a462120dc4c85
descriptive
The Johannesburg Roads Agency, wholly owned by the City, runs the city's traffic signals
clm-2a4481e3a6916430
quantitative
2,023 signalised intersections in January 2025; the province manages 275 more
clm-c8a5fd7e68a8ba74
quantitative
In May 2014 it launched the Find&Fix app for GPS-tagged photo reports of dead signals
clm-0a27a44233eb885a
quantitative
by 2016 was fitting Remote Monitoring Systems to its signal controllers
clm-9e7c24fc02f7b724
quantitative
by January 2025 it said these covered over 80% of controllers and caught over 90% of faults before the public noticed
clm-bb5aa1d36e3341db
quantitative
The agency put power-related outages at about 31% of lights at any time, 51% during load shedding
clm-b98bdaeb454e7884
quantitative
of 1,400 backup batteries installed fewer than 15 still worked after theft
clm-b519e7b30b0b50c2
quantitative
79.49% of reported faulty traffic signals were repaired within 24 hours, 88.67% within 48 hours and 96.29% within seven days, against service standards of 40%, 60% and 80%
clm-51d4cc157d9d85c9
quantitative
the JRA told Daily Maverick in January 2025 that 80% of the signals it manages were working at any given time in the quarter to December 2024
clm-11c28b72fe3cdaca
quantitative
the agency claimed in 2015 that the average time to resolve requests logged through Find&Fix had fallen to six days
clm-012e1b16c19c0988
quantitative
200 backup batteries installed in 2006, 1,400 units later and fewer than 15 working by 2025, a repair backlog above R70 million
clm-2e1d74719b853e5b
descriptive
a search for private firms to wire signals to their own backup power and for controller boxes with electronic locks and alarms
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:074b96f94835b67c5204e0aa5756781dadff208ab9db3ff3d66a7a905e1413cb
src-e712495624a1fb5dThe City's integrated annual report for the year to 30 June 2025, approved by Council in January 2026. Table 90 (JRA service delivery standards, page 135) reports 79.49% of reported faulty traffic signals repaired within 24 working hours, 88.67% within 48 hours and 96.29% within 168 hours against standards of 40%, 60% and 80%; section 2.8 on smart city programmes rates the JRA's remote monitoring, LED lighting and UPS projects as moderate performers that spent 65–98% of their budgets.
src-8c108d94b7047901City newsroom article quoting JRA chief executive Zweli Nyathi: 2,023 signalised intersections with over 16,000 poles and 2,023 controller boxes; Remote Monitoring Systems on more than 80% of controllers detecting over 90% of faults before the public notices; over 360 open cases of vandalism and theft; a repair backlog above R70 million; of 1,400 UPS units installed, fewer than 15 operational; over 40 partner companies and more than 80 intersections linked to private backup power.
src-c3700e3f06ef8547Question-and-answer piece with the city's head of mobility Sipho Nhlapo. States that the JRA is responsible for 2,023 intersections while the province manages 275; that power-related issues affect about 31% of lights at any given time, rising to 51% during load shedding; that 80% of JRA-managed signals were working at any given time in the quarter to December 2024; that over 1,400 UPS boxes were installed and theft reduced the number to fewer than 15; and that a remote monitoring system reports faults to the agency's teams before the public notices.
src-578f4e2824e1aaa3Report from a JRA media tour. States that the agency managed 2,025 traffic signal intersections, 750 of them semi vehicle-actuated and 25 fully actuated; that it is deploying secured controller boxes opened only by an electronic access system, with cameras and sensors whose alarms go to the city's Integrated Intelligence Operations Centre; that rebuilding a vandalised intersection costs R500,000 to R1.5 million; and that 84% of traffic signal faults were repaired within 24 to 48 hours. Quotes Sipho Nhlapo and traffic engineering operations manager Esther Schmidt.
src-21b17eed92a43870JRA media statement. States that the agency is responsible for traffic lights in the City of Johannesburg and is City-owned; that it managed 2,300 signalised intersections on municipal and provincial roads; that its Remote Monitoring System identifies faults so technicians can be dispatched before they are reported; that theft and vandalism cost over R37 million in three financial years and 196 intersections were vandalised in 2020/21; and lists the Find&Fix mobile app among its reporting channels.
src-3dc1c30e080a0fabTrade-press report quoting the JRA's acting managing director Mpho Kau. States that remote monitoring systems were being installed at intersections to detect faults and alert the agency's Traffic Operations Centre, and that R28 million had been spent over three years replacing ageing controllers and R40 million replacing lead-encased cables.
src-87f9c4a2bde16d35Undated JRA web article from the 2015 controller-replacement programme. States that the City's 2,111 traffic signals included about 600 controllers older than 15 years to be replaced by June 2015; that the new controllers incorporate remote monitoring and GPS clocks; and that in 2006 the agency installed 200 back-up batteries (UPS) giving up to seven hours of backup at key intersections, 50 of which were to be reinstated in heavy-duty cabinets.
src-b835fbc96f92f5b7Local-press report of the launch. States that the JRA officially launched the Find and Fix app at Microsoft's Bryanston office on 14 May 2014 to report potholes, faulty traffic signals, storm water drains and manhole covers using GPS and camera technology, and attributes to the agency the claim that it was the first of its kind in Asia, Africa and the Middle East.
src-411a9bbcb292bea8City newsroom article; the page shows no date and places itself in 2015 by referring to the launch in May of the previous year. States that 13,000 residents were using the app, that logged breakdowns averaged 5,000 a month and almost 28,000 in total, and quotes managing director Skhumbuzo Macozoma that the average time to resolve requests logged via Find&Fix had been reduced to six days over the preceding six months.