Permanent project revision

Niamey Urban Fibre Loop — Trans-Saharan Backbone Project

Revision 2026-08-28-p4-uplift · effective 2026-08-28

Current revision. This is the snapshot used by the live entity page.

unreviewed

Created the first structured Evidence Passport with 8 claims and 3 source dossiers.

sha256:caba3ec5ad5636cfc5abc38378ff8d3049a42c183e76e9a322c16a5667edb219

Change set

  • add /evidencePassport — Added claim-level evidence mapping and source dossiers.
  • add /revisionHistory — Established a permanent, hash-addressed baseline revision.
8
of 8 claims mapped
3
source dossiers
3
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Claims, one by one

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-ab5441faff5c8302 quantitative
approved a EUR 31.4 million loan and a EUR 12.5 million grant on 9 December 2016 for Niger's national component of the Trans-Sahara Optical Fibre Backbone
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The approval release gives both amounts and the board date.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. African Development Bank Group — board approval (financier)
Claim 2 clm-9a22f51b60360c74 quantitative
a 1,031-km national and cross-border network on five routes - to the Algerian, Chad, Nigerian, Benin and Burkina Faso borders
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The handover release gives the length and lists all five routes.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. African Development Bank Group — provisional acceptance (financier)
Claim 3 clm-fd3e9d0f52f3f0cb quantitative
an 88-km urban loop in Niamey that will connect the main administrative sites to a future Tier III national data centre
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Quoted almost verbatim, including the future tense.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. African Development Bank Group — provisional acceptance (financier)
Claim 4 clm-54624a52b684dbd3 quantitative
Provisional acceptance of the fibre sections was signed in Niamey on 14 November 2025
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The release dates the ceremony and names the milestone.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. African Development Bank Group — provisional acceptance (financier)
Claim 5 clm-50d6ec30e5bd4afa quantitative
The 2016 approval expected the project to be complete by 2020 and the internet penetration rate to have doubled by then, from 15% to 30% of the Nigerien population
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Both the completion year and the penetration target are in the approval release.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. African Development Bank Group — board approval (financier)
Claim 6 clm-6c896f423d094f15 quantitative
in November 2025, the fibre sections reached provisional acceptance; the data centre the Niamey loop is built to reach is still described as future
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The handover release is the milestone and still calls the data centre future.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. African Development Bank Group — provisional acceptance (financier)
Claim 7 clm-eb10d4b25ed10957 descriptive
No source in this entry reports against the penetration target
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Neither the 2025 handover release nor the June 2026 ministerial interview returns to the 15-to-30-per-cent target.
Caveat
An absence in the sources, not a statement in them.

Sources carrying this claim

  1. African Development Bank Group — provisional acceptance (financier)
  2. Agence Nigérienne de Presse (state news agency)
Claim 8 clm-94902abe71f55658 quantitative
in June 2026 the minister was still describing the next steps as upgrading the national backbone from 100 to 800 gigabits and discussing a second phase of 3,500 to 4,000 further kilometres
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Both figures come from the June 2026 interview.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Agence Nigérienne de Presse (state news agency)

Source dossiers and revision state

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-08-28-p4-uplift effective 2026-08-28 · created 2026-08-28

Awaiting operator and domain-expert review; publication of this revision implies neither.

sha256:caba3ec5ad5636cfc5abc38378ff8d3049a42c183e76e9a322c16a5667edb219
8
of 8 claims mapped
3
source dossiers
3
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
Niger Ministry of Communication, Posts and Digital Economy (DTS/FO project coordination unit)
Actor types
national-government
Funding model
mixed
Funding description
African Development Bank / African Development Fund
Cost
≈EUR 43 million, about US$50 million at the euro's 19 November 2025 rate of 1.1540 dollars (US Federal Reserve H.10 series DEXUSEU) — African Development Fund concessional financing plus a national counterpart
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

3 source dossiers

African Development Bank Group — board approval (financier) afdb.org · 2 linked claims

Open original source ↗

Stable source ID
src-9a35c66515fe998a
Publisher
Name not classified · afdb.org
Type / language
web-page · language not classified
Published
2016-12-13
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-28
Dossier created
2026-08-28
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Approval release: "On Friday, December 9, 2016, the Board of Directors of the African Development Bank Group (AfDB) approved a loan of EUR 31.4 million and a grant of EUR 12.5 million to the Republic of Niger to finance the national component of the project of the Trans-Saharan fiber-optic backbone (DTS)", and "By 2020, at the completion of the project, the penetration rate of internet services should have doubled, from 15% to 30%". Its 1,510 km figure covers the Niger-Chad build together, a wider scope than the 1,031 km later reported for Niger.

Descriptive only — not page/paragraph exact
African Development Bank Group — provisional acceptance (financier) afdb.org · 5 linked claims

Open original source ↗

Stable source ID
src-bff5e8a364fcde3f
Publisher
Name not classified · afdb.org
Type / language
web-page · language not classified
Published
2025-11-19
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-28
Dossier created
2026-08-28
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Handover release, dated 19 November 2025 on the page: "On 14 November, an official ceremony was held in Niamey" for "provisional acceptance of the fibre-optic sections"; "The cost of the project is estimated at EUR 43 million"; the two components are "a 1,031-km national and cross-border fibre-optic network" and "a Tier III national data centre"; the five routes reach the Algerian, Chad, Nigerian, Benin and Burkina Faso borders; "In addition to these five sections, an 88-km urban local loop will connect the main administrative sites to the future national data centre." The release states no completion percentage. Written by the financier, not by an outside auditor.

Descriptive only — not page/paragraph exact
Agence Nigérienne de Presse (state news agency) anp.ne · 2 linked claims

Open original source ↗

Stable source ID
src-4df8bfba386bc304
Publisher
Name not classified · anp.ne
Type / language
web-page · language not classified
Published
2026-06-18
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-28
Dossier created
2026-08-28
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Interview with the Minister of Communication and New Information Technologies on 17 June 2026: the modernisation of the national backbone will raise its capacity "de 100 à 800 gigabits", and discussions continue on a second phase of the Trans-Saharan backbone covering "près de 3.500 à 4.000 kilomètres supplémentaires de fibre optique".

Descriptive only — not page/paragraph exact
Known limits of this passport
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.