Niamey Urban Fibre Loop — Trans-Saharan Backbone Project
As part of the AfDB-financed Trans-Saharan fibre backbone, Niamey is getting an 88km urban local loop connecting administrative sites to Niger's planned national data centre. The wider 1,031km network — reaching toward Algeria, Chad, Nigeria and Benin — was 97% complete by November 2025, with the Tier III data centre still to be finished.
📊 Impact
1,031km Trans-Saharan fibre network 97% complete by November 2025, including Niamey's 88km urban administrative loop (AfDB/Niger government).
📖 Terms in this entry: LoRaWAN
Sources
This overview was generated with AI from the public sources listed above and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Niamey Urban Fibre Loop — Trans-Saharan Backbone Project” — Niamey, Niger. The Smart City Atlas. https://1001smartcities.org/projects/niamey-telecom-backbone/ (last verified 2026-08-02). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.